24 Magazines
Issue 04 / October - December 2026 / Global edition / 1-2
Download PDF
Currently reading: Global edition
ISSUE 04October - December 2026
24 Ships
As a member and contributor you decide the direction of this magazine.
A Note from the Editor
Alternative marine fuels in 2026: readiness matters as much as ambition
Shore power: what changes when a port and ship must work as one system
A Note from the Editor
Alternative marine fuels in 2026: readiness matters as much as ambition
Shore power: what changes when a port and ship must work as one system
24 magazines is not a set of digital magazines you read, its a collection of exciting news stories that you participate in.
October - December 2026

Contents

Approved articles for this 24Ships issue.

The Big Story
Exclusive
New & Notable
Guest Writer
The Interview
Cont.
October - December 2026

Contents continued

Approved articles for this 24Ships issue.

Opinion
The 24 Debate
Insider
Experience
Reviews
Cont.
October - December 2026

Contents continued

Approved articles for this 24Ships issue.

Humour
Classifieds / Marketplace
Classifieds / Marketplace
Reader's Voice
The Future
Cont.
October - December 2026

Contents continued

Approved articles for this 24Ships issue.

24 Unusual
Editor's Note
Buying & Ownership
Practical Guide
Cont.
October - December 2026

Contents continued

Approved articles for this 24Ships issue.

Technology
Operations
Cont.
October - December 2026

Contents continued

Approved articles for this 24Ships issue.

Market
Maintenance
Regulation
Planning
Cont.
October - December 2026

Contents continued

Approved articles for this 24Ships issue.

Industry Network
OPERATIONS
Cont.
October - December 2026

Contents continued

Approved articles for this 24Ships issue.

TECHNICAL
INSIDER
Cont.
October - December 2026

Contents continued

Approved articles for this 24Ships issue.

24 UNUSUAL
Cont.
October - December 2026

Contents continued

Approved articles for this 24Ships issue.

SUSTAINABILITY
Cont.
October - December 2026

Contents continued

Approved articles for this 24Ships issue.

Breaking News
24ShipsEditor

Editor's Note

Editor's comments for this issue will be added shortly.

04.13
A Note from the Editor
Editor's Note

A Note from the Editor

Why We Built 24Synergy — and Why the Magazines Matter

04.14
Cont.
Advertising page
04.15
24ShipsA Note from the Editor

A Note from the Editor

When we started developing 24Synergy, the objective was never simply to build another business directory, advertising website or collection of industry portals. There are already plenty of those, and creating another one would have achieved very little.

The question I kept coming back to was much simpler: **what should 24Synergy actually do for the businesses that use it?**

For me, the answer has always been about creating opportunity through collaboration.

We are constantly told that competition is healthy, and of course it is. Competition drives standards, innovation and better service. But I became interested in a slightly different question. What happens if competitors can also work together?

I don't mean sharing commercially sensitive information or pretending that companies aren't competing for the same customers. I mean recognising that every business already has its own clients, contacts, audience, knowledge and reach. If those individual networks can be connected intelligently, everybody potentially reaches considerably further than they could alone.

That principle became the foundation of 24Synergy.

The network is designed to grow through the businesses using it. Companies introduce their clients and contacts, other businesses do the same, and gradually those separate audiences become part of something much larger. Everybody contributes something to the network and everybody has the opportunity to benefit from the network that results.

There is also a perfectly sensible commercial reason for getting involved early. Your customers are already doing business with other companies and receiving marketing from other suppliers. It therefore makes sense to introduce them to a useful industry network yourself rather than waiting for somebody else to do it first.

That is why I think the early-adopter stage is particularly interesting. I am not going to pretend that a network during its launch period can offer the same volume of activity it should offer when thousands of companies and industry professionals are using it. Networks need people. They need participation and they need time to develop.

But eventually there is a tipping point. More companies join, more buyers arrive, more enquiries circulate, more RFQs are submitted, more people read the newsletters and magazines and more conversations take place through 24live. At that point, the companies that supported the network early aren't arriving and trying to establish themselves in an already busy marketplace. They are already there, with their accounts, listings, content, contacts and presence established.

Some of the mechanisms we have built become much more significant at that stage. Priority access to an RFQ, for example, might seem relatively unimportant when there are only a handful moving through the system. When substantial numbers of genuine opportunities are being generated, seeing something 48 hours before other users can make a considerable difference. The value of the network should therefore increase as the network itself grows.

That same thinking is ultimately what led us to create the magazines.

As 24Synergy developed, I increasingly felt that something was missing. We had created ways for businesses to list themselves, communicate, publish information, distribute newsletters, generate enquiries, respond to opportunities and reach audiences across different specialist sectors, but if we were genuinely trying to build a comprehensive marketing network, those businesses also needed somewhere to advertise.

So we built it.

04.16
Cont.
24ShipsA Note from the Editor

A Note from the Editor

The 24 Magazines aren't intended to sit separately from 24Synergy. They are another part of the same ecosystem, giving companies another route to market while giving readers useful specialist information in an accessible format. They are global publications, but with regional editions and regional editorial because the businesses and people using 24Synergy are global too.

A company shouldn't be disadvantaged because it happens to be based in Britain, France, the United States, Dubai, Singapore, Spain or somewhere else entirely. Nor should a reader have to wade through endless irrelevant information before finding something applicable to where they live, work, sail, charter, fly or conduct business.

That brings me to something else that is probably worth addressing openly.

Some readers will look through these magazines and ask: **“Have they used AI to produce some of this?”**

The answer is yes.

We have.

There are thousands of pieces of editorial involved across these publications and their regional editions, and it would be rather ridiculous for me to pretend that artificial intelligence hasn't helped us create them. AI exists, it is an extraordinarily useful tool when used properly, and I don't see any reason to hide the fact that we have used it.

What matters to me is **how** we have used it.

We haven't simply asked a machine to fill hundreds of pages with words so that the magazines look busy. We have chosen the subjects we believe are worth covering, identified the questions we think readers actually want answered and, in many cases, started the articles ourselves before using AI to help develop the research, structure and additional information around them.

The objective has always been usefulness.

If you're reading one of our sailing magazines, I want you to discover something that helps you sail, plan a passage, choose equipment, understand a destination or avoid a problem. If you're involved with private aviation, I want the information to answer questions relevant to flying, ownership, charter or operations. If you're in commercial shipping, brokerage, boat building, property, charter or another sector, the same principle applies.

I don't want pages of disposable editorial written simply because a magazine needs another article.

We have tried to identify subjects where somebody would otherwise have to spend time searching around the internet, opening numerous websites and piecing the information together themselves. We can do some of that background work instead, ask the questions and bring the useful information together in one place.

There is an environmental argument for that approach too. Endless searching, loading websites, serving adverts and repeatedly retrieving information all require digital infrastructure and energy. A magazine can be downloaded once, kept and read offline.

I wouldn't pretend that this somehow makes digital publishing impact-free, because it doesn't, but if we can save readers unnecessary searching while creating something useful enough to keep and refer back to, I think that is a better use of the technology available to us.

So yes, some of what you are reading has involved AI, and some of it has involved people. Increasingly it will involve more people as well.

04.17
Cont.
24ShipsA Note from the Editor

A Note from the Editor

As early adopters, journalists, specialists and other contributors become involved, their voices will naturally become part of these pages. We are also inviting other magazines and media organisations to contribute, which should introduce completely different editorial voices and areas of expertise. They may use AI themselves, of course, and I have no intention of telling another publisher or journalist which tools they are permitted to use.

The test is much simpler than that: **does the article give the reader something worthwhile?**

If it doesn't, it shouldn't be here.

That philosophy also explains something rather unusual we are now introducing. We are going to allow other independent magazines to promote themselves through our magazines.

At first that might sound counter-intuitive. Why would one magazine deliberately introduce its readers to another magazine?

My answer is: why wouldn't we?

If another specialist publication produces good material that our readers would appreciate, discovering it doesn't make our own magazine less useful. Quite the opposite. If we can become somewhere readers come to discover worthwhile information, including information and publications produced by other people, then I think we become more useful.

A participating publication will be able to contribute a genuine editorial article, tell readers where they can find more of its work and promote its magazine within our pages. We can potentially take that relationship considerably further as well. There may be opportunities to work with other publishers commercially, including arrangements where advertising from their own clients can reach our publications and both parties share in the resulting revenue.

Again, it comes back to the original idea behind 24Synergy. Competition doesn't have to prevent collaboration.

The scale of the network comes from the same philosophy. Historically, the industries we have worked with have never existed neatly inside individual boxes. A superyacht depends upon builders, suppliers, engineering companies, crew, brokers, charter businesses, marinas and countless specialist services. Those same owners and clients may use private aviation and own international property. Boat builders need suppliers. Charter companies need customers. Brokers need buyers and sellers. Employers need crew.

Exhibitors need boat shows, and boat shows need exhibitors and visitors.

Commercial ships and cruise ships sit alongside superyachts, motor yachts and sailing yachts. There are crew and employment services, boat and ship builders, ports, yacht services and suppliers, aviation, empty legs, property and specialist luxury markets. Each sector has its own identity, but there are countless points where they intersect.

That is why 24Synergy has become such a large collection of connected websites. It is deliberately not centred on one country or one type of business. A company with branches in several countries can bring those offices together through the same network, while a small specialist supplier can concentrate on the particular market that matters to it. Everything can still be managed centrally through the same account and dashboard.

24live takes that idea in another direction again. I sometimes describe it as sitting somewhere between the professional nature of LinkedIn and the immediacy of a social network such as Facebook, although I don't really want it to become either of those things. The purpose is business.

04.18
Cont.
24ShipsA Note from the Editor

A Note from the Editor

Members can publish their own material, interact with other users, promote their businesses and place appropriate content across relevant parts of the 24 Network. If somebody wants to be proactive, there is considerable freedom to put themselves in front of the industries they want to reach rather than simply creating a listing and waiting for somebody to find them.

That is an important distinction for me. **24Synergy isn't designed to do your marketing while you sit and watch. It is designed to give you the tools to do considerably more with your marketing yourself.**

There is another, deliberately different part of the ecosystem too.

Within the superyacht sector, 1UK.com is being developed around recognition rather than conventional paid placement. Companies cannot simply buy their way into recognition. They can request consideration, but that request can be declined. As the concept develops, I want appropriate industry leaders themselves to help determine the standards that businesses should achieve to be recognised at different levels.

That connects directly with where I would like 24Synergy itself eventually to go.

The intention is for 24Synergy to develop into a cooperative structure with industry leaders and board members helping to determine its future direction. The industry changes constantly, and the technology serving it needs to change with it. Electric propulsion is an obvious example today, but tomorrow there will be something else. The people actually working within these sectors will often identify what is needed long before a software developer sitting outside the industry ever could.

We have built the infrastructure, but I don't believe that means we should dictate indefinitely what it becomes. I would much rather create a structure where the people using the network have a meaningful voice in deciding which features should be developed next and where the network should go as their industries evolve.

There is a personal reason behind all of this as well.

I've always enjoyed helping businesses develop. I enjoy looking at a new company, understanding what it is trying to achieve and asking what could be done differently. Sometimes it is marketing, sometimes positioning, sometimes making an introduction or simply giving somebody the confidence and advice they need when they're trying to get something started.

I suppose 24Synergy is my attempt to do that on a much larger scale.

Rather than helping one company find another route to market, we have tried to build the infrastructure through which thousands of businesses can create those routes for themselves and for each other. It gives a small specialist company access to many of the same marketing mechanisms available to a much larger international organisation, while allowing a multinational business to connect offices, people and sectors through one global hub.

And that is probably the simplest answer to the question I started with: **what is 24Synergy actually for?**

It is there to create connections and opportunities that would otherwise be harder to create individually. The websites, magazines, newsletters, RFQs, publishing tools, 24live and everything else we develop are simply different ways of achieving that.

We've done the difficult part of bringing that infrastructure together. Now I want businesses to use it, challenge it and help us improve it. I want people to tell us what works, what doesn't and what their particular part of the industry needs next. As more businesses participate, the network should become more useful to everybody already inside it.

We have built 24Synergy, but I don't want it to feel as though it belongs to a small team sitting somewhere deciding what everybody else needs.

**We've built it for you. Now make use of it, make it work for your business, and help us decide what it becomes next.**

**Paul Thompson** *Editor*

Contributor: Paul Thompson / 24Synergy

04.19
Cont.
Advertising page
04.20
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.21
Alternative marine fuels in 2026: readiness matters as much as ambition
Buying & Ownership

Alternative marine fuels in 2026: readiness matters as much as ambition

The market has become very good at presenting alternative marine fuels in 2026: readiness matters as much as ambition as simple.

04.22
Cont.
Humour page reserved
04.23
24ShipsAlternative marine fuels in 2026: readiness matters as much as ambition

Alternative marine fuels in 2026: readiness matters as much as ambition

24Ships feature image.
24Ships feature image.

The market has become very good at presenting alternative marine fuels in 2026: readiness matters as much as ambition as simple. In practice, the details still determine whether it works.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

24Ships feature image.
24Ships feature image.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

24Ships feature image.
24Ships feature image.
04.24
Cont.
Advertising page
04.25
24ShipsAlternative marine fuels in 2026: readiness matters as much as ambition

Alternative marine fuels in 2026: readiness matters as much as ambition

My own shorthand for alternative marine fuels in 2026: readiness matters as much as ambition is simple: verify the condition, verify the paperwork, understand the support network and calculate the cost on a realistic pattern of use. If any one of those four is unclear, there is still work to do before committing.

Energy decisions need a duty-cycle calculation. Average use is less important than the difficult day: the longest passage, the coldest morning, the heaviest load, the remote berth or the turnaround with the least charging time. Design around that case with a sensible reserve and the everyday operation normally becomes straightforward. Design around the brochure average and the owner may spend years managing around the system.

Infrastructure should be checked before hardware is ordered. Available electrical supply, connector type, grid capacity, bunkering arrangements, ventilation, fire protection and local operating rules can all dictate what is practical. In many projects the limiting factor is not the motor, battery or fuel technology; it is the place where the asset has to recharge, refuel or be maintained.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

A measured decision now generally costs less than correcting an enthusiastic one later.

Contributor: Paul Thompson / Editorial / 24Ships

04.26
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.27
Shore power: what changes when a port and ship must work as one system
Practical Guide

Shore power: what changes when a port and ship must work as one system

There is nothing particularly complicated about shore power: what changes when a port and ship must work as one system, but there are several ways to make it unnecessarily expensive.

04.28
Cont.
24ShipsShore power: what changes when a port and ship must work as one system

Shore power: what changes when a port and ship must work as one system

24Ships feature image.
24Ships feature image.

There is nothing particularly complicated about shore power: what changes when a port and ship must work as one system, but there are several ways to make it unnecessarily expensive.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

24Ships feature image.
24Ships feature image.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

Comparison becomes easier if every contender is put through the same questions. Ask for the same operating assumptions, the same delivery point, the same warranty period and the same list of included equipment or services. That turns a collection of sales conversations into something closer to a procurement exercise and exposes the areas where one quotation has quietly omitted an expensive item.

References are useful when they are relevant. A supplier's biggest or most prestigious project may tell you very little about how it handles an ordinary job in your region. Ask instead for examples with a similar scale, operating pattern and timetable. The most useful reference is often the customer who has lived with the product for two or three years and has already needed after-sales support.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

For most readers, that is enough to narrow the field considerably before serious money or time is committed.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.29
Cont.
Advertising page
04.30
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.31
Port calls: cutting time alongside without shifting risk to crews
Buying & Ownership

Port calls: cutting time alongside without shifting risk to crews

One of the easiest mistakes in commercial shipping, fleets, regulation and vessel operations is to concentrate on the headline and leave the awkward questions until later.

04.32
Cont.
24ShipsPort calls: cutting time alongside without shifting risk to crews

Port calls: cutting time alongside without shifting risk to crews

24Ships feature image.
24Ships feature image.

One of the easiest mistakes in commercial shipping, fleets, regulation and vessel operations is to concentrate on the headline and leave the awkward questions until later.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

24Ships feature image.
24Ships feature image.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

24Ships feature image.
24Ships feature image.
04.33
Cont.
24ShipsPort calls: cutting time alongside without shifting risk to crews

Port calls: cutting time alongside without shifting risk to crews

My own shorthand for port calls: cutting time alongside without shifting risk to crews is simple: verify the condition, verify the paperwork, understand the support network and calculate the cost on a realistic pattern of use. If any one of those four is unclear, there is still work to do before committing.

Comparison becomes easier if every contender is put through the same questions. Ask for the same operating assumptions, the same delivery point, the same warranty period and the same list of included equipment or services. That turns a collection of sales conversations into something closer to a procurement exercise and exposes the areas where one quotation has quietly omitted an expensive item.

References are useful when they are relevant. A supplier's biggest or most prestigious project may tell you very little about how it handles an ordinary job in your region. Ask instead for examples with a similar scale, operating pattern and timetable. The most useful reference is often the customer who has lived with the product for two or three years and has already needed after-sales support.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

That is the point worth carrying into the next conversation with a broker, builder, supplier or adviser: ask what the choice will be like to own and operate, not merely what it is like to buy.

Contributor: Paul Thompson / Editorial / 24Ships

04.34
Cont.
Advertising page
04.35
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.36
Methanol, ammonia, hydrogen and biofuels: different answers for different trades
Technology

Methanol, ammonia, hydrogen and biofuels: different answers for different trades

A good decision in commercial shipping, fleets, regulation and vessel operations rarely comes from one impressive specification.

04.37
Cont.
24ShipsMethanol, ammonia, hydrogen and biofuels: different answers for different trades

Methanol, ammonia, hydrogen and biofuels: different answers for different trades

24Ships feature image.
24Ships feature image.

A good decision in commercial shipping, fleets, regulation and vessel operations rarely comes from one impressive specification. It comes from understanding how the whole package will be used.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

24Ships feature image.
24Ships feature image.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

24Ships feature image.
24Ships feature image.
04.38
Cont.
24ShipsMethanol, ammonia, hydrogen and biofuels: different answers for different trades

Methanol, ammonia, hydrogen and biofuels: different answers for different trades

Energy decisions need a duty-cycle calculation. Average use is less important than the difficult day: the longest passage, the coldest morning, the heaviest load, the remote berth or the turnaround with the least charging time. Design around that case with a sensible reserve and the everyday operation normally becomes straightforward. Design around the brochure average and the owner may spend years managing around the system.

Infrastructure should be checked before hardware is ordered. Available electrical supply, connector type, grid capacity, bunkering arrangements, ventilation, fire protection and local operating rules can all dictate what is practical. In many projects the limiting factor is not the motor, battery or fuel technology; it is the place where the asset has to recharge, refuel or be maintained.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

The sensible approach is therefore quite conventional: define the job, verify the evidence, price the whole commitment and keep enough margin for the things that never appear in the brochure.

Contributor: Paul Thompson / Editorial / 24Ships

04.39
Cont.
Advertising page
04.40
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.41
Fuel flexibility: why shipowners are paying for options
Operations

Fuel flexibility: why shipowners are paying for options

A good decision in commercial shipping, fleets, regulation and vessel operations rarely comes from one impressive specification.

04.42
Cont.
24ShipsFuel flexibility: why shipowners are paying for options

Fuel flexibility: why shipowners are paying for options

24Ships feature image.
24Ships feature image.

A good decision in commercial shipping, fleets, regulation and vessel operations rarely comes from one impressive specification. It comes from understanding how the whole package will be used.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

24Ships feature image.
24Ships feature image.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

24Ships feature image.
24Ships feature image.
04.43
Cont.
24ShipsFuel flexibility: why shipowners are paying for options

Fuel flexibility: why shipowners are paying for options

Energy decisions need a duty-cycle calculation. Average use is less important than the difficult day: the longest passage, the coldest morning, the heaviest load, the remote berth or the turnaround with the least charging time. Design around that case with a sensible reserve and the everyday operation normally becomes straightforward. Design around the brochure average and the owner may spend years managing around the system.

Infrastructure should be checked before hardware is ordered. Available electrical supply, connector type, grid capacity, bunkering arrangements, ventilation, fire protection and local operating rules can all dictate what is practical. In many projects the limiting factor is not the motor, battery or fuel technology; it is the place where the asset has to recharge, refuel or be maintained.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

None of this makes the decision difficult. It simply moves attention from presentation to evidence, which is usually where the better value sits.

Contributor: Paul Thompson / Editorial / 24Ships

04.44
Cont.
Advertising page
04.45
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.46
Retrofit planning: finding decarbonisation gains without waiting for a newbuild
Market

Retrofit planning: finding decarbonisation gains without waiting for a newbuild

There is nothing particularly complicated about retrofit planning: finding decarbonisation gains without waiting for a newbuild, but there are several ways to make it unnecessarily expensive.

04.47
Cont.
24ShipsRetrofit planning: finding decarbonisation gains without waiting for a newbuild

Retrofit planning: finding decarbonisation gains without waiting for a newbuild

24Ships feature image.
24Ships feature image.

There is nothing particularly complicated about retrofit planning: finding decarbonisation gains without waiting for a newbuild, but there are several ways to make it unnecessarily expensive.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

24Ships feature image.
24Ships feature image.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

24Ships feature image.
24Ships feature image.
04.48
Cont.
24ShipsRetrofit planning: finding decarbonisation gains without waiting for a newbuild

Retrofit planning: finding decarbonisation gains without waiting for a newbuild

My own shorthand for retrofit planning: finding decarbonisation gains without waiting for a newbuild is simple: verify the condition, verify the paperwork, understand the support network and calculate the cost on a realistic pattern of use. If any one of those four is unclear, there is still work to do before committing.

Connected equipment creates a second maintenance schedule: passwords, access permissions, firmware, backups and subscriptions. Owners should know which systems can be updated remotely, which data leaves the asset and whether loss of an online service affects core operation. A paper or offline record of critical settings is still useful when the problem being diagnosed is the network itself.

Cybersecurity does not need to become a specialist exercise for every user. Basic separation of guest and operational networks, unique credentials, prompt updates and controlled administrator access remove a large proportion of avoidable risk. The more important question for a supplier is whether security has been designed into the product and whether updates will continue throughout its realistic service life.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

That is the point worth carrying into the next conversation with a broker, builder, supplier or adviser: ask what the choice will be like to own and operate, not merely what it is like to buy.

Contributor: Paul Thompson / Editorial / 24Ships

04.49
Cont.
Advertising page
04.50
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.51
Cyber risk at sea: why operational technology needs separate attention
Maintenance

Cyber risk at sea: why operational technology needs separate attention

One of the easiest mistakes in commercial shipping, fleets, regulation and vessel operations is to concentrate on the headline and leave the awkward questions until later.

04.52
Cont.
24ShipsCyber risk at sea: why operational technology needs separate attention

Cyber risk at sea: why operational technology needs separate attention

24Ships feature image.
24Ships feature image.

One of the easiest mistakes in commercial shipping, fleets, regulation and vessel operations is to concentrate on the headline and leave the awkward questions until later.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

24Ships feature image.
24Ships feature image.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

24Ships feature image.
24Ships feature image.
04.53
Cont.
24ShipsCyber risk at sea: why operational technology needs separate attention

Cyber risk at sea: why operational technology needs separate attention

Connected equipment creates a second maintenance schedule: passwords, access permissions, firmware, backups and subscriptions. Owners should know which systems can be updated remotely, which data leaves the asset and whether loss of an online service affects core operation. A paper or offline record of critical settings is still useful when the problem being diagnosed is the network itself.

Cybersecurity does not need to become a specialist exercise for every user. Basic separation of guest and operational networks, unique credentials, prompt updates and controlled administrator access remove a large proportion of avoidable risk. The more important question for a supplier is whether security has been designed into the product and whether updates will continue throughout its realistic service life.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

The sensible approach is therefore quite conventional: define the job, verify the evidence, price the whole commitment and keep enough margin for the things that never appear in the brochure.

Contributor: Paul Thompson / Editorial / 24Ships

04.54
Cont.
Advertising page
04.55
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.56
Voyage optimisation: the savings hidden in speed, weather and arrival planning
Regulation

Voyage optimisation: the savings hidden in speed, weather and arrival planning

This is one of those subjects where a little preparation is worth far more than a long list of features.

04.57
Cont.
24ShipsVoyage optimisation: the savings hidden in speed, weather and arrival planning

Voyage optimisation: the savings hidden in speed, weather and arrival planning

24Ships feature image.
24Ships feature image.

This is one of those subjects where a little preparation is worth far more than a long list of features.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

24Ships feature image.
24Ships feature image.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

24Ships feature image.
24Ships feature image.
04.58
Cont.
24ShipsVoyage optimisation: the savings hidden in speed, weather and arrival planning

Voyage optimisation: the savings hidden in speed, weather and arrival planning

Comparison becomes easier if every contender is put through the same questions. Ask for the same operating assumptions, the same delivery point, the same warranty period and the same list of included equipment or services. That turns a collection of sales conversations into something closer to a procurement exercise and exposes the areas where one quotation has quietly omitted an expensive item.

References are useful when they are relevant. A supplier's biggest or most prestigious project may tell you very little about how it handles an ordinary job in your region. Ask instead for examples with a similar scale, operating pattern and timetable. The most useful reference is often the customer who has lived with the product for two or three years and has already needed after-sales support.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

The sensible approach is therefore quite conventional: define the job, verify the evidence, price the whole commitment and keep enough margin for the things that never appear in the brochure.

Contributor: Paul Thompson / Editorial / 24Ships

04.59
Cont.
Advertising page
04.60
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.61
Carbon data: why poor measurement creates expensive decisions
Planning

Carbon data: why poor measurement creates expensive decisions

The conversation around carbon data: why poor measurement creates expensive decisions has moved quickly this year, yet the practical decision is still built on fairly ordinary questions.

04.62
Cont.
24ShipsCarbon data: why poor measurement creates expensive decisions

Carbon data: why poor measurement creates expensive decisions

24Ships feature image.
24Ships feature image.

The conversation around carbon data: why poor measurement creates expensive decisions has moved quickly this year, yet the practical decision is still built on fairly ordinary questions.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

24Ships feature image.
24Ships feature image.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

24Ships feature image.
24Ships feature image.
04.63
Cont.
24ShipsCarbon data: why poor measurement creates expensive decisions

Carbon data: why poor measurement creates expensive decisions

Connected equipment creates a second maintenance schedule: passwords, access permissions, firmware, backups and subscriptions. Owners should know which systems can be updated remotely, which data leaves the asset and whether loss of an online service affects core operation. A paper or offline record of critical settings is still useful when the problem being diagnosed is the network itself.

Cybersecurity does not need to become a specialist exercise for every user. Basic separation of guest and operational networks, unique credentials, prompt updates and controlled administrator access remove a large proportion of avoidable risk. The more important question for a supplier is whether security has been designed into the product and whether updates will continue throughout its realistic service life.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

For most readers, that is enough to narrow the field considerably before serious money or time is committed.

Contributor: Paul Thompson / Editorial / 24Ships

04.64
Cont.
Advertising page
04.65
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.66
Ballast-water systems: maintenance lessons after installation
Practical Guide

Ballast-water systems: maintenance lessons after installation

I have always found that the useful part of commercial shipping, fleets, regulation and vessel operations starts once the brochure language has been stripped away.

04.67
Cont.
24ShipsBallast-water systems: maintenance lessons after installation

Ballast-water systems: maintenance lessons after installation

24Ships feature image.
24Ships feature image.

I have always found that the useful part of commercial shipping, fleets, regulation and vessel operations starts once the brochure language has been stripped away.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

24Ships feature image.
24Ships feature image.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

24Ships feature image.
24Ships feature image.
04.68
Cont.
24ShipsBallast-water systems: maintenance lessons after installation

Ballast-water systems: maintenance lessons after installation

Preventive work is most effective when it is recorded rather than remembered. A simple calendar of hours, dates, consumables, inspections and recurring tasks gives owners and managers an early warning before maintenance becomes urgent. It also allows jobs to be grouped sensibly, reducing repeated access costs and downtime. The discipline is not glamorous, but it is one of the clearest ways to protect reliability.

Scope control matters on any refit or repair. Once equipment is opened up, additional work is common, so the original quotation should distinguish fixed items, provisional sums and work that requires further authorisation. Photographing condition before and after the job and retaining replaced-part details can prevent disputes and gives the next technician a useful history.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

The sensible approach is therefore quite conventional: define the job, verify the evidence, price the whole commitment and keep enough margin for the things that never appear in the brochure.

Contributor: Paul Thompson / Editorial / 24Ships

04.69
Cont.
Advertising page
04.70
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.71
Alternative-fuel training: the human factor behind new machinery
Technology

Alternative-fuel training: the human factor behind new machinery

One of the easiest mistakes in commercial shipping, fleets, regulation and vessel operations is to concentrate on the headline and leave the awkward questions until later.

04.72
Cont.
24ShipsAlternative-fuel training: the human factor behind new machinery

Alternative-fuel training: the human factor behind new machinery

24Ships feature image.
24Ships feature image.

One of the easiest mistakes in commercial shipping, fleets, regulation and vessel operations is to concentrate on the headline and leave the awkward questions until later.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

24Ships feature image.
24Ships feature image.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

24Ships feature image.
24Ships feature image.
04.73
Cont.
24ShipsAlternative-fuel training: the human factor behind new machinery

Alternative-fuel training: the human factor behind new machinery

Energy decisions need a duty-cycle calculation. Average use is less important than the difficult day: the longest passage, the coldest morning, the heaviest load, the remote berth or the turnaround with the least charging time. Design around that case with a sensible reserve and the everyday operation normally becomes straightforward. Design around the brochure average and the owner may spend years managing around the system.

Infrastructure should be checked before hardware is ordered. Available electrical supply, connector type, grid capacity, bunkering arrangements, ventilation, fire protection and local operating rules can all dictate what is practical. In many projects the limiting factor is not the motor, battery or fuel technology; it is the place where the asset has to recharge, refuel or be maintained.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

The sensible approach is therefore quite conventional: define the job, verify the evidence, price the whole commitment and keep enough margin for the things that never appear in the brochure.

Contributor: Paul Thompson / Editorial / 24Ships

04.74
Cont.
Advertising page
04.75
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.76
Wind assistance: where modern sails are becoming commercially credible
Operations

Wind assistance: where modern sails are becoming commercially credible

A good decision in commercial shipping, fleets, regulation and vessel operations rarely comes from one impressive specification.

04.77
Cont.
24ShipsWind assistance: where modern sails are becoming commercially credible

Wind assistance: where modern sails are becoming commercially credible

24Ships feature image.
24Ships feature image.

A good decision in commercial shipping, fleets, regulation and vessel operations rarely comes from one impressive specification. It comes from understanding how the whole package will be used.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

24Ships feature image.
24Ships feature image.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

24Ships feature image.
24Ships feature image.
04.78
Cont.
24ShipsWind assistance: where modern sails are becoming commercially credible

Wind assistance: where modern sails are becoming commercially credible

Connected equipment creates a second maintenance schedule: passwords, access permissions, firmware, backups and subscriptions. Owners should know which systems can be updated remotely, which data leaves the asset and whether loss of an online service affects core operation. A paper or offline record of critical settings is still useful when the problem being diagnosed is the network itself.

Cybersecurity does not need to become a specialist exercise for every user. Basic separation of guest and operational networks, unique credentials, prompt updates and controlled administrator access remove a large proportion of avoidable risk. The more important question for a supplier is whether security has been designed into the product and whether updates will continue throughout its realistic service life.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

That is the point worth carrying into the next conversation with a broker, builder, supplier or adviser: ask what the choice will be like to own and operate, not merely what it is like to buy.

Contributor: Paul Thompson / Editorial / 24Ships

04.79
Cont.
Advertising page
04.80
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.81
Hull condition and fuel burn: the maintenance link operators can measure
Market

Hull condition and fuel burn: the maintenance link operators can measure

The market has become very good at presenting hull condition and fuel burn: the maintenance link operators can measure as simple.

04.82
Cont.
24ShipsHull condition and fuel burn: the maintenance link operators can measure

Hull condition and fuel burn: the maintenance link operators can measure

24Ships feature image.
24Ships feature image.

The market has become very good at presenting hull condition and fuel burn: the maintenance link operators can measure as simple. In practice, the details still determine whether it works.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

24Ships feature image.
24Ships feature image.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

My own shorthand for hull condition and fuel burn: the maintenance link operators can measure is simple: verify the condition, verify the paperwork, understand the support network and calculate the cost on a realistic pattern of use. If any one of those four is unclear, there is still work to do before committing.

24Ships feature image.
24Ships feature image.
04.83
Cont.
24ShipsHull condition and fuel burn: the maintenance link operators can measure

Hull condition and fuel burn: the maintenance link operators can measure

Preventive work is most effective when it is recorded rather than remembered. A simple calendar of hours, dates, consumables, inspections and recurring tasks gives owners and managers an early warning before maintenance becomes urgent. It also allows jobs to be grouped sensibly, reducing repeated access costs and downtime. The discipline is not glamorous, but it is one of the clearest ways to protect reliability.

Scope control matters on any refit or repair. Once equipment is opened up, additional work is common, so the original quotation should distinguish fixed items, provisional sums and work that requires further authorisation. Photographing condition before and after the job and retaining replaced-part details can prevent disputes and gives the next technician a useful history.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

The best outcome is not necessarily the newest or most sophisticated option. It is the one that remains practical after the first season, the first service bill and the first change of plan.

Contributor: Paul Thompson / Editorial / 24Ships

04.84
Cont.
Advertising page
04.85
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.86
Digital twins: useful tool or another dashboard?
Maintenance

Digital twins: useful tool or another dashboard?

There is nothing particularly complicated about digital twins: useful tool or another dashboard?, but there are several ways to make it unnecessarily expensive.

04.87
Cont.
24ShipsDigital twins: useful tool or another dashboard?

Digital twins: useful tool or another dashboard?

24Ships feature image.
24Ships feature image.

There is nothing particularly complicated about digital twins: useful tool or another dashboard?, but there are several ways to make it unnecessarily expensive.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

24Ships feature image.
24Ships feature image.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

Connected equipment creates a second maintenance schedule: passwords, access permissions, firmware, backups and subscriptions. Owners should know which systems can be updated remotely, which data leaves the asset and whether loss of an online service affects core operation. A paper or offline record of critical settings is still useful when the problem being diagnosed is the network itself.

Cybersecurity does not need to become a specialist exercise for every user. Basic separation of guest and operational networks, unique credentials, prompt updates and controlled administrator access remove a large proportion of avoidable risk. The more important question for a supplier is whether security has been designed into the product and whether updates will continue throughout its realistic service life.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

A measured decision now generally costs less than correcting an enthusiastic one later.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.88
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.89
Advertising page
04.90
Spare-parts strategy: what long lead times have changed
Regulation

Spare-parts strategy: what long lead times have changed

For anyone looking at spare-parts strategy: what long lead times have changed, the first job is not to decide what looks best.

04.91
Cont.
24ShipsSpare-parts strategy: what long lead times have changed

Spare-parts strategy: what long lead times have changed

24Ships feature image.
24Ships feature image.

For anyone looking at spare-parts strategy: what long lead times have changed, the first job is not to decide what looks best. It is to establish what problem actually needs solving.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

24Ships feature image.
24Ships feature image.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

24Ships feature image.
24Ships feature image.
04.92
Cont.
24ShipsSpare-parts strategy: what long lead times have changed

Spare-parts strategy: what long lead times have changed

Comparison becomes easier if every contender is put through the same questions. Ask for the same operating assumptions, the same delivery point, the same warranty period and the same list of included equipment or services. That turns a collection of sales conversations into something closer to a procurement exercise and exposes the areas where one quotation has quietly omitted an expensive item.

References are useful when they are relevant. A supplier's biggest or most prestigious project may tell you very little about how it handles an ordinary job in your region. Ask instead for examples with a similar scale, operating pattern and timetable. The most useful reference is often the customer who has lived with the product for two or three years and has already needed after-sales support.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

None of this makes the decision difficult. It simply moves attention from presentation to evidence, which is usually where the better value sits.

Contributor: Paul Thompson / Editorial / 24Ships

04.93
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.94
Advertising page
04.95
Newbuild contracts: why future fuel assumptions belong in the specification
Planning

Newbuild contracts: why future fuel assumptions belong in the specification

The conversation around newbuild contracts: why future fuel assumptions belong in the specification has moved quickly this year, yet the practical decision is still built on fairly ordinary questions.

04.96
Cont.
24ShipsNewbuild contracts: why future fuel assumptions belong in the specification

Newbuild contracts: why future fuel assumptions belong in the specification

24Ships feature image.
24Ships feature image.

The conversation around newbuild contracts: why future fuel assumptions belong in the specification has moved quickly this year, yet the practical decision is still built on fairly ordinary questions.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

24Ships feature image.
24Ships feature image.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

24Ships feature image.
24Ships feature image.
04.97
Cont.
24ShipsNewbuild contracts: why future fuel assumptions belong in the specification

Newbuild contracts: why future fuel assumptions belong in the specification

Energy decisions need a duty-cycle calculation. Average use is less important than the difficult day: the longest passage, the coldest morning, the heaviest load, the remote berth or the turnaround with the least charging time. Design around that case with a sensible reserve and the everyday operation normally becomes straightforward. Design around the brochure average and the owner may spend years managing around the system.

Infrastructure should be checked before hardware is ordered. Available electrical supply, connector type, grid capacity, bunkering arrangements, ventilation, fire protection and local operating rules can all dictate what is practical. In many projects the limiting factor is not the motor, battery or fuel technology; it is the place where the asset has to recharge, refuel or be maintained.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

For most readers, that is enough to narrow the field considerably before serious money or time is committed.

Contributor: Paul Thompson / Editorial / 24Ships

04.98
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.99
Advertising page
04.100
Ship recycling: documentation and material inventories are moving upstream
Buying & Ownership

Ship recycling: documentation and material inventories are moving upstream

The market has become very good at presenting ship recycling: documentation and material inventories are moving upstream as simple.

04.101
Cont.
24ShipsShip recycling: documentation and material inventories are moving upstream

Ship recycling: documentation and material inventories are moving upstream

24Ships feature image.
24Ships feature image.

The market has become very good at presenting ship recycling: documentation and material inventories are moving upstream as simple. In practice, the details still determine whether it works.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

24Ships feature image.
24Ships feature image.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

24Ships feature image.
24Ships feature image.
04.102
Cont.
24ShipsShip recycling: documentation and material inventories are moving upstream

Ship recycling: documentation and material inventories are moving upstream

My own shorthand for ship recycling: documentation and material inventories are moving upstream is simple: verify the condition, verify the paperwork, understand the support network and calculate the cost on a realistic pattern of use. If any one of those four is unclear, there is still work to do before committing.

Comparison becomes easier if every contender is put through the same questions. Ask for the same operating assumptions, the same delivery point, the same warranty period and the same list of included equipment or services. That turns a collection of sales conversations into something closer to a procurement exercise and exposes the areas where one quotation has quietly omitted an expensive item.

References are useful when they are relevant. A supplier's biggest or most prestigious project may tell you very little about how it handles an ordinary job in your region. Ask instead for examples with a similar scale, operating pattern and timetable. The most useful reference is often the customer who has lived with the product for two or three years and has already needed after-sales support.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

A measured decision now generally costs less than correcting an enthusiastic one later.

Contributor: Paul Thompson / Editorial / 24Ships

04.103
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.104
Advertising page
04.105
Remote surveys and condition monitoring: where they genuinely save time
Practical Guide

Remote surveys and condition monitoring: where they genuinely save time

A good decision in commercial shipping, fleets, regulation and vessel operations rarely comes from one impressive specification.

04.106
Cont.
24ShipsRemote surveys and condition monitoring: where they genuinely save time

Remote surveys and condition monitoring: where they genuinely save time

24Ships feature image.
24Ships feature image.

A good decision in commercial shipping, fleets, regulation and vessel operations rarely comes from one impressive specification. It comes from understanding how the whole package will be used.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

24Ships feature image.
24Ships feature image.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

24Ships feature image.
24Ships feature image.
04.107
Cont.
24ShipsRemote surveys and condition monitoring: where they genuinely save time

Remote surveys and condition monitoring: where they genuinely save time

Comparison becomes easier if every contender is put through the same questions. Ask for the same operating assumptions, the same delivery point, the same warranty period and the same list of included equipment or services. That turns a collection of sales conversations into something closer to a procurement exercise and exposes the areas where one quotation has quietly omitted an expensive item.

References are useful when they are relevant. A supplier's biggest or most prestigious project may tell you very little about how it handles an ordinary job in your region. Ask instead for examples with a similar scale, operating pattern and timetable. The most useful reference is often the customer who has lived with the product for two or three years and has already needed after-sales support.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

The sensible approach is therefore quite conventional: define the job, verify the evidence, price the whole commitment and keep enough margin for the things that never appear in the brochure.

Contributor: Paul Thompson / Editorial / 24Ships

04.108
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.109
Advertising page
04.110
Crewing for new technology: competence planning before delivery
Technology

Crewing for new technology: competence planning before delivery

The conversation around crewing for new technology: competence planning before delivery has moved quickly this year, yet the practical decision is still built on fairly ordinary questions.

04.111
Cont.
24ShipsCrewing for new technology: competence planning before delivery

Crewing for new technology: competence planning before delivery

24Ships feature image.
24Ships feature image.

The conversation around crewing for new technology: competence planning before delivery has moved quickly this year, yet the practical decision is still built on fairly ordinary questions.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

24Ships feature image.
24Ships feature image.

Cost also needs to be separated into purchase cost and ownership cost. The second figure is usually less visible. Consumables, routine servicing, insurance, finance, berthing or storage, professional fees, software subscriptions, inspections and eventual replacement items can materially change the economics. A useful quotation is therefore one that makes exclusions obvious.

If a supplier cannot explain what normally falls outside the quoted figure, ask for that clarification before treating two prices as comparable.

After-sales support can be more important than the original specification. A component that is excellent on paper is less attractive if parts take months to arrive or there is no competent service agent where the equipment will be used. The same applies to software-led products: ownership now includes updates, access rights, data and sometimes recurring subscriptions. Find out who supports the system, for how long, and what happens if the original supplier changes hands.

Timing matters. Buying or commissioning under deadline pressure weakens the buyer's position because there is less time to inspect, compare and walk away. Where possible, build the timetable backwards from the date the asset or service is genuinely required. Include survey or inspection time, corrections, training, delivery and a contingency. A realistic programme often reveals that the cheapest-looking option is not the one with the lowest overall cost.

24Ships feature image.
24Ships feature image.
04.112
Cont.
24ShipsCrewing for new technology: competence planning before delivery

Crewing for new technology: competence planning before delivery

Connected equipment creates a second maintenance schedule: passwords, access permissions, firmware, backups and subscriptions. Owners should know which systems can be updated remotely, which data leaves the asset and whether loss of an online service affects core operation. A paper or offline record of critical settings is still useful when the problem being diagnosed is the network itself.

Cybersecurity does not need to become a specialist exercise for every user. Basic separation of guest and operational networks, unique credentials, prompt updates and controlled administrator access remove a large proportion of avoidable risk. The more important question for a supplier is whether security has been designed into the product and whether updates will continue throughout its realistic service life.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

None of this makes the decision difficult. It simply moves attention from presentation to evidence, which is usually where the better value sits.

Contributor: Paul Thompson / Editorial / 24Ships

04.113
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.114
Advertising page
04.115
2027 fleet planning: decisions that cannot wait for perfect regulatory certainty
Operations

2027 fleet planning: decisions that cannot wait for perfect regulatory certainty

This is one of those subjects where a little preparation is worth far more than a long list of features.

04.116
Cont.
24Ships2027 fleet planning: decisions that cannot wait for perfect regulatory certainty

2027 fleet planning: decisions that cannot wait for perfect regulatory certainty

24Ships feature image.
24Ships feature image.

This is one of those subjects where a little preparation is worth far more than a long list of features.

The starting point is use. In commercial shipping, fleets, regulation and vessel operations, two apparently similar products or services can be right for completely different owners because their operating pattern is different. Frequency of use, geography, crew or staffing, storage, servicing access and the length of time you expect to keep the asset all change the answer. Before comparing brands or quotations, write down those constraints.

It sounds basic, but it prevents a specification being chosen for a lifestyle that exists only in the sales material.

Technical claims deserve context. Range, output, capacity, speed, efficiency and performance figures are normally produced under stated conditions. Real use adds weather, load, temperature, fouling, route, operator behaviour and reserve margins. Rather than arguing over a headline number, ask what assumptions sit behind it and what happens when those assumptions change. That produces a much more useful comparison.

The regulatory backdrop is also moving. IMO work in 2026 has continued to focus on the infrastructure needed for renewable fuels and on the different levels of regulatory readiness for methanol, ammonia, hydrogen and other alternatives. That does not create one obvious fuel choice. It reinforces the need to match vessel type, route, bunkering availability, safety case and expected operating life before committing capital.

Sustainability claims are increasingly part of the decision as well. The useful question is not whether a product is described as green, but what has actually changed: energy use, fuel consumption, material choice, repairability, service life, emissions, waste or end-of-life handling. Improvements in one area can create compromises in another. Evidence and measured performance are more valuable than broad environmental language.

Finally, insist on a proper handover. Familiarisation, emergency procedures, maintenance intervals, passwords, spare parts, warranty contacts and operating limitations should all be understood before the supplier disappears over the horizon. A surprising number of early problems are not failures at all but gaps in handover. Thirty minutes spent recording the right information can save days later.

24Ships feature image.
24Ships feature image.

Documentation is another practical test. Service records, manuals, certificates, invoices, warranties, software licences and evidence of previous work are not administrative clutter; they are part of the asset. Good records make troubleshooting easier and can support resale. Missing records do not automatically mean there is a problem, but they increase uncertainty, and uncertainty should be reflected in the questions asked, the inspection undertaken and sometimes the price.

Risk is best dealt with before commitment. That means independent inspection where appropriate, clear written scope, confirmation of insurance implications and an agreed process for defects or incomplete work. In higher-value transactions, legal, tax and regulatory advice should come from qualified advisers in the relevant jurisdiction. The purpose is not to make every transaction defensive; it is to stop assumptions becoming expensive surprises.

Resale should be considered even by people who intend to keep something for years. Highly personal specifications can be perfectly sensible, but buyers should understand the trade-off. Widely supported equipment, sensible layouts, complete records and recognised maintenance tend to be easier for the next owner to understand. The objective is not to design everything for an unknown future buyer; it is simply to avoid destroying flexibility without a good reason.

24Ships feature image.
24Ships feature image.
04.117
Cont.
24Ships2027 fleet planning: decisions that cannot wait for perfect regulatory certainty

2027 fleet planning: decisions that cannot wait for perfect regulatory certainty

Connected equipment creates a second maintenance schedule: passwords, access permissions, firmware, backups and subscriptions. Owners should know which systems can be updated remotely, which data leaves the asset and whether loss of an online service affects core operation. A paper or offline record of critical settings is still useful when the problem being diagnosed is the network itself.

Cybersecurity does not need to become a specialist exercise for every user. Basic separation of guest and operational networks, unique credentials, prompt updates and controlled administrator access remove a large proportion of avoidable risk. The more important question for a supplier is whether security has been designed into the product and whether updates will continue throughout its realistic service life.

The practical test for commercial shipping, fleets, regulation and vessel operations is whether the decision still makes sense when circumstances are less than ideal. Weather changes, schedules move, components fail and people use equipment differently from the designer's neat assumptions. Building a little resilience into the choice usually costs less than trying to recover it afterwards.

That is the point worth carrying into the next conversation with a broker, builder, supplier or adviser: ask what the choice will be like to own and operate, not merely what it is like to buy.

Contributor: Paul Thompson / Editorial / 24Ships

04.118
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.119
Advertising page
04.120
The decisions reshaping commercial ships as 2027 approaches
The Big Story

The decisions reshaping commercial ships as 2027 approaches

Every quarter produces plenty of announcements in commercial ships, shipping operations, fleet technology, maintenance and regulation, but the useful story is usually not the loudest one. I am more interested in the changes that alter what somebody buys, what it costs to operate, how quickly support arrives and whether the decision still makes sense several years later.

04.121
Cont.
24ShipsThe decisions reshaping commercial ships as 2027 approaches

The decisions reshaping commercial ships as 2027 approaches

24Ships feature image.
24Ships feature image.

Every quarter produces plenty of announcements in commercial ships, shipping operations, fleet technology, maintenance and regulation, but the useful story is usually not the loudest one. I am more interested in the changes that alter what somebody buys, what it costs to operate, how quickly support arrives and whether the decision still makes sense several years later.

What is changing

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Why it matters in practice

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

What readers should watch next

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.122
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.123
Inside the details buyers and operators often discover too late in commercial ships
Exclusive

Inside the details buyers and operators often discover too late in commercial ships

The expensive mistakes in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely caused by one spectacular failure. More often they begin with a small assumption that nobody checked. That is why I would start with the detail that sits behind the brochure, quotation or listing rather than the headline promise.

04.124
Cont.
Advertising page
04.125
24ShipsInside the details buyers and operators often discover too late in commercial ships

Inside the details buyers and operators often discover too late in commercial ships

24Ships feature image.
24Ships feature image.

The expensive mistakes in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely caused by one spectacular failure. More often they begin with a small assumption that nobody checked. That is why I would start with the detail that sits behind the brochure, quotation or listing rather than the headline promise.

The overlooked detail

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Where cost and risk appear

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

Questions to ask before committing

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.126
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.127
What is genuinely worth watching now in commercial ships
New & Notable

What is genuinely worth watching now in commercial ships

New does not automatically mean better. In commercial ships, shipping operations, fleet technology, maintenance and regulation, a launch is worth attention when it removes a genuine inconvenience, reduces operating burden, improves safety or gives the buyer more useful choice. Everything else can wait until the excitement has settled.

04.128
Cont.
24ShipsWhat is genuinely worth watching now in commercial ships

What is genuinely worth watching now in commercial ships

24Ships feature image.
24Ships feature image.

New does not automatically mean better. In commercial ships, shipping operations, fleet technology, maintenance and regulation, a launch is worth attention when it removes a genuine inconvenience, reduces operating burden, improves safety or gives the buyer more useful choice. Everything else can wait until the excitement has settled.

What is actually new

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Separating substance from launch noise

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

Where it could prove useful

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.129
Cont.
Advertising page
04.130
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.131
A professional's checklist for making better decisions in commercial ships
Guest Writer

A professional's checklist for making better decisions in commercial ships

A useful professional contribution should leave the reader with something they can apply. For commercial ships, shipping operations, fleet technology, maintenance and regulation, that means concentrating on the requirement, the evidence and the consequences of the decision rather than turning the page into a sales pitch.

04.132
Cont.
24ShipsA professional's checklist for making better decisions in commercial ships

A professional's checklist for making better decisions in commercial ships

24Ships feature image.
24Ships feature image.

A useful professional contribution should leave the reader with something they can apply. For commercial ships, shipping operations, fleet technology, maintenance and regulation, that means concentrating on the requirement, the evidence and the consequences of the decision rather than turning the page into a sales pitch.

Start with the requirement

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Check the evidence

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

Keep the decision commercially grounded

24Ships feature image.
24Ships feature image.

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Editorial Desk / Guest Contributor Brief / 24Ships

24Ships feature image.
24Ships feature image.
04.133
Cont.
24ShipsReader's Voice

Ask Editorial Desk / Guest Contributor Brief a question

Be the first reader to react to this article.

Reader reaction
04.134
Advertising page
04.135
The questions I would ask anyone selling expertise in commercial ships
The Interview

The questions I would ask anyone selling expertise in commercial ships

If I had an hour with a specialist in commercial ships, shipping operations, fleet technology, maintenance and regulation, I would spend surprisingly little of it asking what they sell. The more revealing questions concern what they refuse to recommend, what commonly goes wrong, how they deal with delays and what happens after the invoice has been paid.

04.136
Cont.
24ShipsThe questions I would ask anyone selling expertise in commercial ships

The questions I would ask anyone selling expertise in commercial ships

24Ships feature image.
24Ships feature image.

If I had an hour with a specialist in commercial ships, shipping operations, fleet technology, maintenance and regulation, I would spend surprisingly little of it asking what they sell. The more revealing questions concern what they refuse to recommend, what commonly goes wrong, how they deal with delays and what happens after the invoice has been paid.

Questions about capability

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Questions about delivery

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

Questions about support after the sale

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.137
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.138
Why practical evidence matters more than fashionable claims in commercial ships
Opinion

Why practical evidence matters more than fashionable claims in commercial ships

There is no shortage of confident language around commercial ships, shipping operations, fleet technology, maintenance and regulation. The difficulty is that confidence is not evidence. Buyers and operators are better served by information that can be checked: specifications, service commitments, operating limits, references, documentation and a clear explanation of cost.

04.139
Cont.
Advertising page
04.140
24ShipsWhy practical evidence matters more than fashionable claims in commercial ships

Why practical evidence matters more than fashionable claims in commercial ships

24Ships feature image.
24Ships feature image.

There is no shortage of confident language around commercial ships, shipping operations, fleet technology, maintenance and regulation. The difficulty is that confidence is not evidence. Buyers and operators are better served by information that can be checked: specifications, service commitments, operating limits, references, documentation and a clear explanation of cost.

The problem with easy claims

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

What better evidence looks like

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

A more useful way to decide

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.141
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.142
Standard specification or bespoke solution: where should commercial ships draw the line?
The 24 Debate

Standard specification or bespoke solution: where should commercial ships draw the line?

One recurring argument in commercial ships, shipping operations, fleet technology, maintenance and regulation is whether the safest route is a proven standard package or a solution tailored closely to the individual user. Both approaches can be right, and both can become expensive when chosen for the wrong reason.

04.143
Cont.
24ShipsStandard specification or bespoke solution: where should commercial ships draw the line?

Standard specification or bespoke solution: where should commercial ships draw the line?

24Ships feature image.
24Ships feature image.

One recurring argument in commercial ships, shipping operations, fleet technology, maintenance and regulation is whether the safest route is a proven standard package or a solution tailored closely to the individual user. Both approaches can be right, and both can become expensive when chosen for the wrong reason.

The case for standardisation

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

The case for customisation

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

Where the sensible middle ground sits

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.144
Cont.
Advertising page
04.145
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.146
What experienced people check first in commercial ships
Insider

What experienced people check first in commercial ships

People who work around commercial ships, shipping operations, fleet technology, maintenance and regulation every day tend to notice different things from a first-time buyer. They look past presentation and start with the awkward details: access, records, response times, condition, exclusions, compatibility and who is actually responsible when something stops working.

04.147
Cont.
24ShipsWhat experienced people check first in commercial ships

What experienced people check first in commercial ships

24Ships feature image.
24Ships feature image.

People who work around commercial ships, shipping operations, fleet technology, maintenance and regulation every day tend to notice different things from a first-time buyer. They look past presentation and start with the awkward details: access, records, response times, condition, exclusions, compatibility and who is actually responsible when something stops working.

The first five minutes

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

The paperwork and detail

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

The clues that justify a second look

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.148
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.149
Advertising page
04.150
How to get more from the real-world experience of commercial ships
Experience

How to get more from the real-world experience of commercial ships

The best way to understand commercial ships, shipping operations, fleet technology, maintenance and regulation is to experience it under conditions that resemble real use. A polished demonstration can be useful, but it should not prevent straightforward questions about inconvenience, noise, waiting time, staffing, storage, maintenance or the parts of the experience that happen after the photograph.

04.151
Cont.
24ShipsHow to get more from the real-world experience of commercial ships

How to get more from the real-world experience of commercial ships

24Ships feature image.
24Ships feature image.

The best way to understand commercial ships, shipping operations, fleet technology, maintenance and regulation is to experience it under conditions that resemble real use. A polished demonstration can be useful, but it should not prevent straightforward questions about inconvenience, noise, waiting time, staffing, storage, maintenance or the parts of the experience that happen after the photograph.

Before you arrive

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

During the experience

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

What to assess afterwards

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.152
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.153
How to review products and services in commercial ships without being distracted by marketing
Reviews

How to review products and services in commercial ships without being distracted by marketing

A review of anything connected with commercial ships, shipping operations, fleet technology, maintenance and regulation should begin before the reviewer sees the product. Decide what matters first. Otherwise the most impressive feature in the room has a habit of becoming the most important feature in the review, whether it deserves to or not.

04.154
Cont.
24ShipsHow to review products and services in commercial ships without being distracted by marketing

How to review products and services in commercial ships without being distracted by marketing

24Ships feature image.
24Ships feature image.

A review of anything connected with commercial ships, shipping operations, fleet technology, maintenance and regulation should begin before the reviewer sees the product. Decide what matters first. Otherwise the most impressive feature in the room has a habit of becoming the most important feature in the review, whether it deserves to or not.

Set the test before the product

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Use realistic conditions

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

Judge ownership as well as performance

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.155
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.156
How to read a commercial ships listing before making the first call
Classifieds / Marketplace

How to read a commercial ships listing before making the first call

A classified advertisement in commercial ships, shipping operations, fleet technology, maintenance and regulation is an invitation to investigate, not proof of condition or value. Good listings make that investigation easier; weak ones often reveal themselves through what they omit.

04.157
Cont.
24ShipsHow to read a commercial ships listing before making the first call

How to read a commercial ships listing before making the first call

24Ships feature image.
24Ships feature image.

A classified advertisement in commercial ships, shipping operations, fleet technology, maintenance and regulation is an invitation to investigate, not proof of condition or value. Good listings make that investigation easier; weak ones often reveal themselves through what they omit.

Read between the lines

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Verify before travelling or paying

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

Compare total proposition, not asking price

24Ships feature image.
24Ships feature image.

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.158
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.159
The questions readers should be asking about commercial ships right now
Reader's Voice

The questions readers should be asking about commercial ships right now

The most useful reader questions about commercial ships, shipping operations, fleet technology, maintenance and regulation are usually practical rather than glamorous. What will it cost after purchase? Who supports it? What happens when plans change? Which claims can be verified? Those questions deserve more space than another page of adjectives.

04.160
Cont.
24ShipsThe questions readers should be asking about commercial ships right now

The questions readers should be asking about commercial ships right now

24Ships feature image.
24Ships feature image.

The most useful reader questions about commercial ships, shipping operations, fleet technology, maintenance and regulation are usually practical rather than glamorous. What will it cost after purchase? Who supports it? What happens when plans change? Which claims can be verified? Those questions deserve more space than another page of adjectives.

Cost and value

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Service and accountability

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

The questions that deserve clearer answers

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Editorial Desk / Reader Questions / 24Ships

24Ships feature image.
24Ships feature image.
04.161
Cont.
24ShipsReader's Voice

Ask Editorial Desk / Reader Questions a question

Be the first reader to react to this article.

Reader reaction
04.162
What the next five years could change in commercial ships
The Future

What the next five years could change in commercial ships

Forecasting commercial ships, shipping operations, fleet technology, maintenance and regulation is easy if the aim is to sound futuristic. It is harder, and more useful, to identify changes that have a realistic route into everyday use. Cost, infrastructure, regulation, skills and customer behaviour usually decide the pace long before technology reaches its theoretical limit.

04.163
Cont.
24ShipsWhat the next five years could change in commercial ships

What the next five years could change in commercial ships

24Ships feature image.
24Ships feature image.

Forecasting commercial ships, shipping operations, fleet technology, maintenance and regulation is easy if the aim is to sound futuristic. It is harder, and more useful, to identify changes that have a realistic route into everyday use. Cost, infrastructure, regulation, skills and customer behaviour usually decide the pace long before technology reaches its theoretical limit.

Technology with a purpose

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Infrastructure and skills

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

What is likely to remain stubbornly familiar

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.164
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.165
The unconventional ideas in commercial ships that are more practical than they first appear
24 Unusual

The unconventional ideas in commercial ships that are more practical than they first appear

Some ideas in commercial ships, shipping operations, fleet technology, maintenance and regulation sound ridiculous until the problem they are trying to solve is understood. Others remain ridiculous after closer inspection. The useful exercise is working out which is which before paying to find out.

04.166
Cont.
24ShipsThe unconventional ideas in commercial ships that are more practical than they first appear

The unconventional ideas in commercial ships that are more practical than they first appear

24Ships feature image.
24Ships feature image.

Some ideas in commercial ships, shipping operations, fleet technology, maintenance and regulation sound ridiculous until the problem they are trying to solve is understood. Others remain ridiculous after closer inspection. The useful exercise is working out which is which before paying to find out.

Why it sounds odd

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Where it can actually work

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

The limitations nobody should ignore

24Ships feature image.
24Ships feature image.

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.167
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.168
Why better connections between specialists improve outcomes in commercial ships
Industry Network

Why better connections between specialists improve outcomes in commercial ships

No single supplier, adviser or operator covers every part of commercial ships, shipping operations, fleet technology, maintenance and regulation. Outcomes improve when the right specialists can be found quickly, information moves cleanly between them and everybody understands where their responsibility starts and finishes.

04.169
Cont.
24ShipsWhy better connections between specialists improve outcomes in commercial ships

Why better connections between specialists improve outcomes in commercial ships

24Ships feature image.
24Ships feature image.

No single supplier, adviser or operator covers every part of commercial ships, shipping operations, fleet technology, maintenance and regulation. Outcomes improve when the right specialists can be found quickly, information moves cleanly between them and everybody understands where their responsibility starts and finishes.

The information gap

Start by defining the job in plain language. What does the buyer, owner, operator or guest actually need to achieve, and under what conditions? That immediately makes comparison easier. A specification that is excellent for one use can be unnecessarily expensive or actively inconvenient for another. I would write down the non-negotiables, the desirable extras and the things that merely look attractive in a sales presentation.

Then verify the basics. Ask for documents, dimensions, service intervals, exclusions, lead times, warranties, references or operating data where they are relevant. If a claim materially affects the decision, it should be capable of being explained without resorting to vague phrases. This is particularly important where two offers appear similar but include different levels of preparation, support or responsibility.

Why trusted specialists matter

Price needs context. The cheapest quotation can become the expensive option once delivery, installation, travel, consumables, finance, insurance, maintenance, downtime or replacement are included. Equally, paying more is not evidence of quality. The useful comparison is total cost against the benefit that will actually be used.

Support deserves the same scrutiny as the initial product or service. Who answers the telephone when something goes wrong? Is technical knowledge held in-house or passed elsewhere? Are parts, people or replacements readily available? A realistic response time can be more valuable than an impressive feature that becomes unusable for weeks when a minor component fails.

There is also a human factor. Complicated systems and elaborate processes are often sold on capability, but somebody has to live with them. Training, handover, documentation and ease of use should therefore be part of the buying decision, not an afterthought.

24Ships feature image.
24Ships feature image.

Turning contacts into measurable value

Before committing, I would reduce the decision to a short written comparison. What problem does each option solve, what evidence supports the claims, what is excluded, what are the likely running costs, and what happens if circumstances change? That final question is important because resale, upgrade, relocation, regulation and changing patterns of use can alter the economics surprisingly quickly.

The strongest decisions in commercial ships, shipping operations, fleet technology, maintenance and regulation are rarely the ones with the longest specification or the most fashionable name attached. They are the ones where the requirement was understood at the beginning, the evidence was checked, the inconvenient questions were asked and the owner or customer knew exactly what would happen after the deal was done.

That is also the standard I would apply to this category in the magazine. It should help a reader make a better decision, not simply give another supplier somewhere to repeat a brochure.

Contributor: Paul Thompson / Editorial / 24Ships

24Ships feature image.
24Ships feature image.
04.170
Cont.
24ShipsReader's Voice

Ask Paul Thompson / Editorial a question

Be the first reader to react to this article.

Reader reaction
04.171
When the UK port gate closes: keeping freight moving through road disruption
OPERATIONS

When the UK port gate closes: keeping freight moving through road disruption

A port can have working cranes, available berths and containers ready to leave, yet the supply chain still stops at the road outside. Felixstowe’s A14 connection and Dover’s cross-Channel traffic plans show two different kinds of vulnerability: planned works that narrow access, and sudden disruption that can fill the approach roads. The practical test is whether port, haulier, driver and receiver share the same live picture. Booking slots, lawful diversions, holding capacity and honest arrival estimates matter more than a generic promise to “keep freight moving”. Here is how to prepare a shipment for the day the familiar route is no longer usable.

04.172
Cont.
Additional Q4 editorial graphic.
Additional Q4 editorial graphic.
04.173
Cont.
24ShipsWhen the UK port gate closes: keeping freight moving through road disruption

When the UK port gate closes: keeping freight moving through road disruption

24Ships feature image.
24Ships feature image.

A port may be open and still be inaccessible. The distinction matters because the word “closure” makes people picture a locked gate or a failed crane. For road freight, the stoppage may be a lane restriction several miles inland, a queue that consumes the booked arrival window, or a traffic-control plan that sends vehicles to a holding area before they can approach the terminal. The ship keeps working. The container is ready. The lorry simply cannot reach the point where the next leg begins.

That is a familiar operational risk around Felixstowe and Dover, though their problems are different. Felixstowe depends heavily on the A14 corridor linking the port with the Midlands and wider trunk-road network. National Highways describes the A14 between Wherstead and Felixstowe as strategically important to the port and publishes planned closures and diversions as part of its road-maintenance programme.

At Dover, the central challenge is often not one section of roadworks but managing surges and service disruption across the short straits. Operation Brock provides a staged system for holding freight while keeping traffic moving in both directions on the M20.

These are not interchangeable events, and neither should be represented as a single recent terminal shutdown. They do, however, reveal the sequence a logistics team has to manage when road access is impaired: notice, dispatch, route choice, arrival control, port entry, and the decision to hold, rebook or redirect the cargo. A contingency plan that starts only when the driver calls from a queue has already lost time.

Start with the booking. A terminal appointment is a planned transfer of responsibility, not a guarantee that the road will deliver a lorry on time. The container may have a collection reference and a slot, but that slot sits inside a chain of constraints: the vessel’s discharge sequence, the terminal’s stacking plan, customs and release status, the haulier’s tractor and driver availability, and the receiving warehouse’s opening hours.

If a road closure changes the estimated arrival, those constraints do not automatically update themselves.

The first useful action is to identify who can change what. The shipping line or freight forwarder may control the release; the terminal controls gate capacity and appointment rules; the haulier controls dispatch and routing; the customer controls whether a late delivery can be received; and the road authority or police control closures and signed diversions. A single “control tower” may coordinate the conversation, but it cannot override another party’s safety or access rules.

24Ships feature image.
24Ships feature image.

Name a decision-maker for each step before the load is moving.

For the A14, a diversion is not simply a coloured alternative on a sat-nav. National Highways’ published works identify specific junction closures and prescribed routes, and warn that arrangements can change at short notice. An HGV route must be checked against the actual vehicle, load, bridge limits, local access restrictions and road signs. Drivers should follow the official diversion, not improvise through a village because a consumer mapping app predicts a shorter journey.

A shorter route that is unsuitable for the vehicle can turn a delay into a safety incident or a penalty.

A port call also needs more than an arrival estimate. At Felixstowe, a lorry can reach the general port area and still be delayed by congestion at the approach, a queue at the gate, a terminal appointment mismatch or an administrative hold. A dispatcher should distinguish “ETA near the port” from “ETA at the terminal gate” and from “container collected”. Those are different milestones.

In a disruption, the difference between them decides whether a receiving site can plan labour and whether a second tractor is sent unnecessarily.

04.174
Cont.
24ShipsWhen the UK port gate closes: keeping freight moving through road disruption

When the UK port gate closes: keeping freight moving through road disruption

Dover provides a sharper example of how a port-access plan may involve traffic management well beyond the port estate. The government’s Kent traffic guidance says Operation Brock is intended to keep roads open if services across the Channel are disrupted. When it is in force, HGVs bound for Dover or Eurotunnel must use signed routes; enforcement can turn vehicles around if they try to bypass the system.

The Kent and Medway Resilience Forum’s 2025 notices described deploying Brock ahead of expected busy holiday periods, with the M20 contraflow creating space where freight could be held if required. In 2026, Dover District Council again described Brock as a measure to reduce congestion on local roads during a busy crossing period.

The detail for operators is that a contingency system can itself change the route and timing even when the port remains open. The lorry driver needs to know whether the instruction is to proceed to the port, join a managed queue, or use a designated holding area. The customer needs to know whether a late vehicle is delayed in a controlled queue or has missed the sailing cut-off. The dispatcher needs to know whether a new departure would create a second vehicle arriving into the same constrained area.

A vague message such as “Kent is busy” does not answer any of those questions.

Good driver communication is specific, timed and acknowledged. Send the relevant route instruction, the source of the instruction, the latest valid time, the next check-in point and a number that will be answered. If the instruction comes from the port authority, road authority or police, identify it as such. Do not ask a driver to choose between an old route plan and a new message without stating which is current.

If mobile coverage drops or the driver is moving, short messages with one clear action are more useful than a long narrative.

A practical disruption message might say: “A14 eastbound closed between the stated junctions from 22:00; follow the signed National Highways diversion; do not use local roads; call at the specified point before leaving the diversion; terminal appointment being held pending confirmation.” That is a template, not a live instruction: routes and timings have to come from current authority information. The point is to state what is known, what is not known, and when the next update will come.

The same discipline applies to bookings. If a terminal appointment can be amended, the person who has access to the booking system should amend it as soon as the revised arrival becomes credible, not wait for the original slot to expire. If the system does not allow amendment, contact the terminal or agent through the approved channel and record the reference.

A dispatcher should avoid sending a second lorry simply because the first appointment appears at risk; otherwise the cure adds traffic to a constrained gate and can create a duplicate collection.

Port and terminal systems are designed to manage predictable throughput. They may offer booking windows, release checks and status updates, but operators need to understand the limits. A booking can manage demand at the gate; it cannot create road capacity or make a vessel wait indefinitely. Conversely, a terminal’s own operating hours and cut-offs may not match the road authority’s closure schedule.

Before a planned closure, check the terminal’s actual rule for late arrivals, missed appointments, pre-advice and rebooking. Record the number to call outside office hours. Do not assume a customer-service inbox will be monitored while a night closure is under way.

04.175
Cont.
24ShipsWhen the UK port gate closes: keeping freight moving through road disruption

When the UK port gate closes: keeping freight moving through road disruption

For planned A14 works, the best response begins before the affected shift. National Highways publishes closure information and travel alerts, including daily closure reporting for England’s strategic road network. The transport planner should compare the work window with the cargo’s realistic port arrival, not merely its scheduled departure from the depot. A vehicle leaving before a closure may still meet it if loading, driver hours or congestion push the run late.

Build a decision point into the plan: if the lorry has not passed a defined junction by a set time, dispatch should use the approved contingency or stop the movement and reschedule.

A diversion may add distance, but distance is only one element of cost. Driver hours, fuel, tolls, vehicle restrictions, missed terminal slots, stockout penalties and warehouse labour all belong in the comparison. The cheapest-looking route can be the most expensive if it arrives after a receiver closes. Where a delivery is time-critical, the better option may be a pre-agreed buffer at a depot, a shifted warehouse booking or a different collection day.

Such choices should be made by the party paying for the consequence, not left to the driver at the roadside.

Rail can provide resilience for some port freight, but it should not be treated as a universal substitute when a road link is blocked. Rail capacity, service patterns, terminals, container availability and onward drayage all have to align. A rail option is useful where a shipment is already planned as an intermodal movement or where a forwarder can secure capacity and a receiving terminal. It is not a switch that can be thrown after a lorry is stuck, especially for a single container with a narrow delivery window.

The contingency plan should state which cargoes are genuinely rail-capable and who will book the path and terminal handling.

The same realism is needed for rerouting to another port. A move from Felixstowe to a different gateway may change the shipping line’s service, customs arrangements, inland distance, container-release process and availability of a suitable collection slot. At Dover, a driver cannot simply divert a booked ferry crossing to another operator or terminal without reservation and vehicle documentation being accepted. Alternative ports are options only if contracts, bookings and capacity support them.

Keep a list of feasible alternatives, but distinguish those with confirmed arrangements from those that are merely imaginable.

The most useful contingency is often a carefully controlled hold. A container can remain at the terminal or a permitted inland location until the route and slot are stable, but storage charges, free-time limits, reefer power and delivery commitments must be checked. If the container is temperature-sensitive, hazardous or subject to a customs deadline, the acceptable holding time may be short. Ask who monitors the cargo during the hold, who authorises extra charges and what event triggers release.

“Wait until it clears” is not a plan unless someone owns the clock.

Commercial terms matter because road disruption exposes gaps in responsibility. The contract may allocate demurrage, detention, waiting time or failed-delivery costs, but the practical question is how quickly parties exchange the evidence needed to apply those terms. Keep timestamped records of the closure notice, the driver’s location, terminal status, appointment changes and customer instructions.

A screenshot of a traffic app may help reconstruct a decision, but official notices and the terminal’s own records are stronger evidence. Agree in advance which party will notify the consignee and which will request an extension or revised delivery slot.

04.176
Cont.
24ShipsWhen the UK port gate closes: keeping freight moving through road disruption

When the UK port gate closes: keeping freight moving through road disruption

The driver should not be made to carry the whole contingency. HGV drivers have legal limits on driving and rest, and a queue can consume time without moving the vehicle towards a safe place to stop. Dispatchers need to know the remaining hours and should not press a driver to “make the slot” after the route has become impossible. If a managed queue or holding area is activated, the driver needs clear access instructions, welfare information where available and a way to report a change.

The operations desk must account for a driver who cannot answer while driving and must not depend on constant texting.

A disruption log is not bureaucracy for its own sake. It helps distinguish a one-off road delay from a recurring failure in the plan. Capture the first notice, the decision time, the route selected, the revised port arrival, the point where the vehicle joined a queue, whether the appointment was retained, and the ultimate collection or delivery time. Compare that record with the planned route and promised slot. If the same junction or time window repeatedly causes losses, change the schedule, not just the message.

For port operators and freight forwarders, shared status is more valuable than a proliferation of alerts. The essential fields are simple: load identity, vehicle identity, current location or last confirmed milestone, appointment status, relevant closure or queue, next action, responsible person and next update time. Where systems cannot exchange that data automatically, a disciplined manual channel is better than several unconnected chats.

Every status should carry a timestamp and an origin; stale information can be more harmful than no information.

The A14 and Dover cases also show why “alternative route” and “alternative plan” are not synonyms. The former tells a driver how to get around a closure. The latter decides whether the cargo should move at all, when the terminal will accept it, how the receiver will adapt, who absorbs the cost and what happens if the first contingency fails. A route plan is necessary, but a plan that does not include the next handover is unfinished.

The practical exercise is to take one live shipment and walk it through three failures: the driver receives notice before departure; the vehicle is already en route; and the vehicle is in the port queue when the terminal slot expires. At each stage, identify who contacts whom, which system is authoritative, what the driver should do, whether cargo can be held, and what the customer is told. Use a real route and real operating hours. If the answer is “we will work it out”, the weak point is already visible.

The port gate is only the final visible point in a much longer journey. When road access tightens, resilient freight depends on the quality of decisions made upstream: timely authoritative information, sensible appointment control, legal routing, realistic driver hours, and a receiver willing to plan around uncertainty. The ship may be ready to sail. The cargo still moves at the pace of the least prepared handover.

Contributor: Paul Thompson / 24Ships

04.177
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.178
Electronic inclinometers arrive on new container ships: what the 2026 rule requires
TECHNICAL

Electronic inclinometers arrive on new container ships: what the 2026 rule requires

From 1 January 2026, new container ships and bulk carriers of 3,000 gross tonnage and above must carry an electronic inclinometer, or another means, to determine, display and record roll motion. The requirement is narrow in application but broad in its implications for design reviews, bridge integration, commissioning and the evidence available after a cargo incident. It does not retrofit the existing fleet, nor does it turn a roll reading into a prediction of safety. The useful question for owners is how the measured motion will be presented and recorded in real operation, and how to verify that the delivered installation meets the performance standard.

04.179
Cont.
24ShipsElectronic inclinometers arrive on new container ships: what the 2026 rule requires

Electronic inclinometers arrive on new container ships: what the 2026 rule requires

24Ships feature image.
24Ships feature image.

The rule begins with a date and a threshold. Under SOLAS regulation V/19.2.12, containerships and bulk carriers of 3,000 gross tonnage and upwards constructed on or after 1 January 2026 must be fitted with an electronic inclinometer, or other means, to determine, display and record the ship’s roll motion. The Maritime and Coastguard Agency’s Marine Guidance Note 712 explains how the amendment applies in UK law and points to the relevant IMO performance standard.

That sounds like a compact equipment requirement. It is also a useful test of how an owner, yard, class society and bridge team handle a safety instrument that sits between raw motion and operational judgement. An inclinometer can tell the crew what the ship is doing in roll. It cannot, by itself, tell them whether the cargo is safe, whether a lashing arrangement is adequate or whether a course and speed change will improve the situation.

The quality of the installation and the limits of its use matter as much as the presence of a display.

The first practical task is to establish whether the ship is in scope. The MCA guidance makes clear that the requirement applies to containerships and bulk carriers of 3,000 GT and above constructed on or after the relevant date. It does not apply to existing ships. Nor does it apply simply because a general cargo ship occasionally carries containers on deck, or because a cargo ship occasionally carries bulk cargo.

The definitions follow the SOLAS categories: a containership is intended primarily to carry containers, while bulk carrier has the meaning used in SOLAS chapter XII.

“Constructed on or after” is a design and contract issue, not a synonym for delivery date. The relevant construction criteria are those set by SOLAS, and owners should have their class and flag specialists confirm the ship’s status rather than relying on a yard’s casual description of the programme. A vessel ordered earlier but reaching delivery after the date may still be within scope depending on its construction status.

The applicable statutory interpretation should be settled in the project compliance matrix and recorded against keel-laying and other construction milestones.

The rule’s immediate purpose is to provide roll-motion information on ships where excessive motion can contribute to container losses or bulk-cargo damage. A vessel’s roll is influenced by loading condition, stability, wave encounter, speed, heading and the interaction between the ship and the sea. The measured value can help the bridge team understand the actual response of the vessel.

24Ships feature image.
24Ships feature image.

It should not be mistaken for a universal threshold at which the ship becomes safe or unsafe: a given roll angle has different significance in different operating and cargo conditions.

The phrase “or other means” also deserves care. It allows a compliant alternative to a dedicated electronic inclinometer, but does not mean any sensor that happens to produce motion data will suffice. The equipment or system must perform the required functions and meet the IMO performance standards in resolution MSC.363(92).

A pitch-and-roll display designed for another purpose, a voyage recorder with data that cannot be viewed by the bridge team, or a monitoring package whose output is not retained may not meet the requirement merely because it records movement somewhere on the network.

For procurement, the specification should identify the three separate functions: determine, display and record roll motion. Ask the supplier to demonstrate each, not just the visual indicator. Determine means that the system obtains roll data with the necessary performance. Display means the information is presented so the bridge team can use it. Record means the data is retained in a form and for a period consistent with the applicable standard and shipboard arrangements.

The design review should identify exactly where data is acquired, processed, shown, time-stamped, stored and retrieved.

04.180
Cont.
24ShipsElectronic inclinometers arrive on new container ships: what the 2026 rule requires

Electronic inclinometers arrive on new container ships: what the 2026 rule requires

The performance standard should shape acceptance testing. IMO resolution MSC.363(92) sets standards for electronic inclinometers, and the MCA notice directs owners to it. A yard specification should translate the standard into verifiable requirements: operating range, accuracy, response, environmental performance, power supply, interface, alarm or status indication where applicable, and any conditions for installation and operation.

The contract should identify which party demonstrates compliance, which test records are delivered and who approves any equivalent “other means”. The flag Administration and recognised organisation should be involved early enough to resolve interpretation before steelwork and cable routes are fixed.

Mounting location is not merely an ergonomic choice. The sensor must be installed in accordance with its approved design and manufacturer’s instructions, with orientation, alignment, vibration, foundation and access considered. The bridge display should be visible to the people making navigational decisions without forcing them to navigate a menu during a demanding watch.

If the data is repeated at another workstation, the project should establish which display is primary and how discrepancies or sensor faults are indicated. A sensor that is correctly specified but installed with an undocumented orientation error can produce data that appears plausible and is still wrong.

Integration is another common source of late work. A dedicated unit may be stand-alone, or it may connect to an integrated bridge system, voyage data recorder or other onboard equipment. Integration can be useful, but it creates questions about interface compatibility, time synchronisation, network segregation, data ownership and fault diagnosis. The bridge team should be able to distinguish a genuine low roll reading from a frozen value, missing data or an invalid sensor status.

The design should specify whether failure is shown locally, whether data continues to be stored during a display fault, and what happens after loss of the primary power supply.

A roll record is most useful when its time base can be matched to the ship’s other records. If the crew needs to reconstruct an event, the inclinometer’s data may be compared with course, speed, heading, loading condition, weather information, cargo alarms and actions recorded in the deck log. Inconsistent clocks turn a valuable trace into an approximate one. At commissioning, verify the system clock against the ship’s common time source and establish how the timestamps are maintained.

If data is exported, test the export before delivery and ensure the format is accessible to the operator without proprietary equipment that is unavailable on board.

Recording does not automatically mean the system is a statutory voyage data recorder. The inclinometer requirement is its own carriage requirement, and the relevant recording performance comes from its applicable standard. Owners should not assume that the VDR has captured every data point the inclinometer records, or that the inclinometer’s internal memory satisfies separate VDR obligations.

Confirm whether data is separately retained, how much history is available, how it is protected against overwrite, and how authorised staff can retrieve it. The interface between systems should be documented, but distinct compliance functions should remain clear.

The installation also needs a maintenance plan. A sensor can drift, suffer connection faults or be affected by changes to the bridge network or power system. The planned-maintenance system should include the manufacturer’s checks, software or firmware control, inspection of mounting and cabling where relevant, and a record of calibration or verification. The ship’s spare strategy should reflect the maker’s support arrangements and the consequences of failure.

04.181
Cont.
24ShipsElectronic inclinometers arrive on new container ships: what the 2026 rule requires

Electronic inclinometers arrive on new container ships: what the 2026 rule requires

A monitor that is unserviceable at sea should trigger a defined response, including how the bridge team will obtain reliable information and whether any operational limitations apply under flag or company procedures.

Commissioning should use a witnessed test plan rather than a simple power-on check. Confirm the model and serial number against approved documentation; verify the installation location and orientation; check that the display responds to vessel motion in a controlled test; prove record retention and retrieval; confirm data timestamping; test status and fault indications; and demonstrate the system after relevant power or interface interruptions.

Where a calibrated test or simulation is used, preserve the method and result. The commissioning pack should contain the approval basis, drawings, manuals, software versions, test records, training record and maintenance instructions.

Class and statutory survey implications should be addressed as part of the newbuild approval process. The MCA notice does not replace the survey and certification responsibilities established under SOLAS and UK implementation. It explains that the SOLAS amendment enters UK law through the ambulatory reference provisions in the Merchant Shipping (Safety of Navigation) Regulations 2020.

Owners should therefore obtain confirmation from the relevant Administration or recognised organisation about the documents and survey evidence required for the particular vessel, rather than assuming that a type-approval certificate alone closes the item.

The equipment will be a bridge tool, so crew familiarisation cannot be left to a manual filed in the technical library. Officers should know what is measured, what the display units mean, what conditions can affect the reading, how to recognise a fault and how to retrieve the recorded data. They should also know what the instrument does not tell them. A roll value is not a substitute for stability information, the approved loading manual, cargo securing calculations or the master’s judgement.

A display that is treated as an automatic go/no-go signal could encourage false confidence.

Operational procedures should connect the instrument to decisions without promising more than it can deliver. For example, a company may use roll trends to prompt closer monitoring, reassessment of speed and heading, or review of cargo securing arrangements in difficult conditions. The procedure should identify the responsible officer, the information to consider alongside the reading and the record to make when action is taken.

Avoid a single generic alarm limit unless it has been justified for the ship and approved operational context. A fixed threshold divorced from loading condition and sea state may produce nuisance alarms or, worse, a misleading sense of security below the number.

There is a human-factors question in the bridge layout. A chart table or central conning position may be used by different officers with differing levels of familiarity. Readability in daylight and at night, display brightness, units, trend presentation and the distinction between instantaneous values and averages all affect comprehension. The operator should test the display with the people who will use it, including during bridge simulator or familiarisation exercises where available.

If the system offers configurable views, agree the default layout and control access so that an accidental setting change does not silently remove the information the bridge expects to see.

Data governance should be settled before the first voyage. The record may be relevant to a cargo claim, a safety investigation or internal operational review. Define who can download it, how it is preserved after an incident, how long it is retained and how the chain of custody is maintained. Routine access controls should protect the record from unauthorised alteration, while allowing the master and shore safety staff to retrieve it when needed.

04.182
Cont.
24ShipsElectronic inclinometers arrive on new container ships: what the 2026 rule requires

Electronic inclinometers arrive on new container ships: what the 2026 rule requires

If the system connects to a wider vessel network, include it in the ship’s cyber and configuration management rather than treating a new sensor as an isolated box.

The broader benefit may come from accumulated experience rather than a single moment on the bridge. Recorded roll data, matched carefully with loading and voyage conditions, can help an operator understand how sister ships respond, whether particular cargo arrangements correlate with high motions, and whether existing guidance is useful. That analysis demands consistent units, accurate timestamps and disciplined data management.

It also requires caution: one ship’s measured response cannot be transferred directly to another ship with different hull form, loading and operating practice.

A new requirement can become an afterthought if it is inserted into a long equipment list late in construction. That is when the bridge display competes for space, the sensor location is awkward, interfaces become custom, and acceptance evidence is assembled under delivery pressure. Owners should place the requirement in the early design basis, check scope and construction date, identify the performance standard, and assign one person responsibility for system integration and records.

The yard, maker, class and flag need to agree how compliance will be shown while there is still time to change the design.

For ships already ordered or under construction at the transition, the owner should ask for a written applicability assessment and a traceable compliance plan. For a ship outside the rule, the same engineering questions can still be useful, but the statutory trigger should not be misrepresented as a retrofit obligation. For a ship inside it, the minimum is not simply a box on the bridge: the ship must determine, display and record roll motion through a compliant system.

The best commissioning question is not “Does the screen light up?” It is “Can the bridge team trust what it sees, understand its limits, and retrieve a reliable record when the conditions become difficult?” The answer depends on the sensor, the installation, the integration and the habits built around it. The 2026 rule supplies the trigger. Good engineering has to make the measurement usable.

Contributor: Paul Thompson / 24Ships

04.183
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.184
A port state control inspection, from arrival notice to deficiency close-out
INSIDER

A port state control inspection, from arrival notice to deficiency close-out

A port state control visit is not an ambush, although it can feel like one when a ship’s certificates, maintenance records and working equipment do not tell the same story. The 2026 UK regulations replace the previous framework while continuing the country’s Paris MoU commitments. They set out how inspections are prioritised, what can lead to detention and how deficiencies are recorded and closed. For the master and agent, the useful preparation begins before arrival: accurate notifications, an organised document trail and a crew who can explain what they do. The inspection itself is a conversation with evidence, under a timetable that the ship may not control.

04.185
Cont.
24ShipsA port state control inspection, from arrival notice to deficiency close-out

A port state control inspection, from arrival notice to deficiency close-out

24Ships feature image.
24Ships feature image.

The first sign of a port state control inspection may arrive before the inspector steps aboard. A port authority’s arrival information, the ship’s profile in the Paris Memorandum of Understanding system, its previous inspection history and the availability of inspectors all shape whether and how a foreign-flagged ship is selected. From there, the visit moves quickly through identity, certificates, condition, interviews and any deficiencies that need to be rectified or formally recorded.

The UK’s Merchant Shipping (Port State Control) Regulations 2026 replaced the 2011 regulations and came into force as the domestic framework for carrying out the UK’s Paris MoU commitments. The MCA’s MGN 711 explains the regulations for shipowners, agents, operators, masters, seafarers, pilots and port authorities. The new instrument does not mean every vessel will receive the same inspection or that every visit follows an identical script.

Risk profile and inspection history matter, and the findings determine what happens next.

Port state control is a state’s check on foreign ships calling at its ports or anchorages. It is a backstop to flag-state and company responsibilities, intended to find ships that do not meet relevant international standards for safety, pollution prevention, working conditions and related matters. A sound operator should therefore regard the inspection as one part of compliance, not an alternative compliance system that can be prepared for only when a ship is selected.

The arrival notice is the first practical handover. The 2026 regulations require information about arrivals and departures, and place reporting duties on port authorities. Agents should ensure the particulars submitted are complete and consistent: ship identity, flag, arrival details and other information required through the applicable reporting channel. A mismatch between the notice, statutory documents and what the ship says on arrival creates avoidable friction.

The agent should also establish whom the inspector can contact, where the vessel will berth or anchor, and whether operational constraints affect access.

Selection is not simply random, but neither does a favourable profile promise immunity. Under the Paris MoU regime, ships are assigned a risk profile that affects inspection priority, intervals and scope. The profile considers such matters as ship type and age, flag performance, recognised organisation performance, company performance, and deficiencies and detentions recorded over the previous period. The MCA’s guidance on expanded inspections explains that high-risk ships can receive more detailed scrutiny.

24Ships feature image.
24Ships feature image.

Port state control resources are directed towards risk, while low-risk ships are inspected less frequently.

The master can check the ship’s position through the Paris MoU information and company procedures before arrival. That check is useful for planning, not for predicting the inspector’s every move. The profile can change as new information is entered. A recent inspection elsewhere in the region may affect priority; a fresh deficiency or detention may alter the picture.

The ship’s shore team should know the current profile and the reason behind it, but should never treat a low-risk label as evidence that records or equipment need less attention.

Once aboard, the inspector usually establishes the ship’s identity and the people responsible for the visit, then examines certificates and records before moving into condition and operation. The exact order varies with the ship and the inspection, but the crew should be ready to produce statutory and class documents, crew and safe-manning information, logbooks and records relevant to the inspection. Documents should be current, accessible and internally consistent.

A certificate is not persuasive if the actual equipment, maintenance record or crew explanation points elsewhere.

04.186
Cont.
24ShipsA port state control inspection, from arrival notice to deficiency close-out

A port state control inspection, from arrival notice to deficiency close-out

A good document station saves time. The master or designated officer should know where the original or accepted electronic documents are kept, how the inspector can see them, and who will accompany the inspection. Avoid handing over a mixed folder that contains superseded certificates alongside current ones without clear status. If a document is held ashore or electronically, the responsible officer should know how to retrieve it promptly and confirm its authenticity.

The aim is not to stage-manage the ship but to make the evidence legible.

The physical inspection tests whether the ship’s condition corresponds with the paper. Inspectors may examine accessible spaces, lifesaving and firefighting arrangements, machinery and pollution-prevention equipment, working and accommodation conditions, and operational procedures. The depth depends on the inspection type and what is observed. A small defect may lead to a closer look at related systems; an apparent contradiction between a maintenance record and equipment condition can broaden the inquiry.

A crew member who understands the system and can demonstrate its operation is more helpful than one who has memorised a checklist but cannot explain the practice.

The inspector’s professional profile is a feature of the 2026 regulations. The instrument sets minimum criteria for inspectors, reflecting the technical judgement involved in assessing a ship against international standards. That does not remove the need for a clear exchange. The master should ask for clarification where a finding is not understood, provide relevant evidence, and ensure the ship’s response is accurately captured.

Disagreement should be handled through the formal process, not through argument on the gangway or an attempt to persuade the crew to conceal a defect.

The legal distinction between a deficiency and detention matters. A deficiency is a failure to meet a relevant requirement that must be corrected or otherwise addressed. Detention is a more serious intervention, used where deficiencies make the ship unsafe to proceed or present an unacceptable risk. Schedule 3 to the regulations sets out criteria for detention, including deficiencies considered sufficiently serious to warrant it and other areas where, for example, cargo operations may need to be suspended.

The inspector considers the nature and seriousness of the shortcomings, not merely the number of entries on a list.

When deficiencies are found, the inspection report should state them and the required action. The master should check that each finding is understood: what convention or requirement is implicated, which equipment or practice is affected, what correction is expected, what evidence is acceptable, and whether the ship may continue operating. If an entry appears to describe a different condition from the one observed, raise the issue promptly and calmly.

A disagreement does not erase the finding, but a precise record matters for corrective work and any later review.

Rectification can range from an immediate repair or test to a more complex shore-side intervention. The ship should assign an officer to each item, record the action taken, preserve supporting evidence and agree how the inspector or authority will verify closure. A verbal assurance that “the spare is ordered” is not the same as a repair. A temporary measure should be documented, risk-assessed and accepted by the relevant authority where required.

If a ship needs a repair yard, the regulations provide for permission in specified circumstances for a detained ship to proceed to repair, subject to the conditions imposed.

04.187
Cont.
24ShipsA port state control inspection, from arrival notice to deficiency close-out

A port state control inspection, from arrival notice to deficiency close-out

A detention changes the operating plan. The master and company must manage crew, cargo, passengers where relevant, port services, class and flag communications, commercial commitments and repair resources. The regulations also provide for refusal of access in circumstances connected with repeated non-compliance and set out appeal and compensation provisions, including for unjustified detention. Those rights are formal remedies; they should not be confused with permission to sail before a detention is lifted.

Departure is controlled by the authority’s decision and the relevant legal requirements.

Close-out needs the same discipline as the inspection. Ensure every deficiency is marked as corrected, accepted for later action under a specified deadline, or subject to an agreed restriction. Obtain written confirmation of release where detention has been imposed. Retain the report, correspondence, photographs, test records, repair invoices and evidence of any follow-up. Update the planned-maintenance system and the company’s corrective-action process.

If the cause was a poor handover, an inadequate spare, a training gap or a recurring defect, correcting only the visible item leaves the next inspection exposed.

The agent is an important link, but cannot stand in for the ship. Before arrival, the agent should understand the expected inspection arrangements and contact details, relay requests to the master, and coordinate access and port services. If an inspector needs a launch, berth access, a safe working route or a shore repair team, delays in arranging these can extend the visit. The agent can also help keep the operator informed of changing schedules.

The master retains command aboard and should make sure that the company’s designated contact can authorise decisions and expenditure without a chain of unanswered calls.

The company’s shore office should be ready to support evidence gathering and corrective work. If the inspector requests a record stored ashore, someone should be able to send the right version promptly. Technical managers need to know which service engineer or maker can attend at the port, and procurement needs to understand the urgency of a safety-critical spare. Commercial staff should not pressure the master to depart while the authority is still considering a serious issue.

Clear authority to stop operations is part of an effective compliance system.

Crew preparation is best done through normal practice. Each department should know its equipment, records and reporting route. The chief officer should be able to explain cargo securing, stability and deck safety arrangements relevant to the ship; engineers should understand machinery condition and maintenance; the safety officer should know drill, lifesaving and firefighting records; and all crew should know how to report an unsafe condition.

An inspector may ask a rating to demonstrate a task rather than ask the master to recite a policy. That is a reasonable test of whether procedures reach the working level.

A short pre-arrival review should identify known defects honestly. If a system is temporarily unavailable, the master and company should know the status, compensating measures, repair plan and any notification obligation. Concealing a fault rarely improves the outcome: an inspector who discovers it independently will question the reliability of the wider record. Early disclosure allows the ship to explain what has been done and seek guidance on the next step.

It does not guarantee that the authority will accept a proposed workaround.

04.188
Cont.
24ShipsA port state control inspection, from arrival notice to deficiency close-out

A port state control inspection, from arrival notice to deficiency close-out

Inspectors should be accompanied in a way that is safe and useful. The ship should provide access to spaces and equipment, comply with safety procedures and assign a knowledgeable person to explain the arrangements. Do not leave an inspector unattended where the work environment is hazardous, and do not obstruct examination of an area because it is untidy or inconvenient. If a space cannot be entered safely, explain why and agree a safe alternative.

A clear escort also helps the ship keep track of equipment operated or seals disturbed during testing.

There is a practical reason to treat each finding as information about the management system, not just the individual vessel. A repeated deficiency across ships may point to a fleet-wide maintenance instruction, procurement specification or training problem. The company should compare findings by type, flag, class, ship age and operational department, then decide whether a corrective notice or revised procedure is needed.

Paris MoU data and annual reporting can help operators understand broader inspection trends, but a company’s own findings are the most direct evidence of where its system is failing.

The 2026 framework also depends on information from people ashore. Pilots and port authorities have duties to report anomalies under the regulations. That provision recognises that port state control is not confined to a scheduled visit: observations made during an ordinary call can bring a concern to the authorities’ attention. Masters should therefore ensure anomalies are reported through company channels and addressed quickly.

Port and pilot reports are not a substitute for inspection, but they can influence the attention a ship receives.

A useful internal drill is to rehearse the first hour after notification. Who informs the master? Who tells the technical superintendent? Where are the certificates? Who accompanies the inspector? Who can approve a repair? Who informs the charterer if cargo operations pause? Then test the less convenient scenario: the inspector arrives during a watch change, a required document is temporarily inaccessible, and a safety system fails its demonstration.

The point is not to script answers but to ensure the ship can respond calmly and accurately.

For masters, the most important habits are plain: cooperate, keep a contemporaneous record, ask for clarification, and do not sign a description that is materially inaccurate without recording the issue. For shore teams, it is to respond quickly, make technical decisions available and let the master focus on the ship. For agents, it is to coordinate access and communications without promising an outcome that belongs to the inspector.

Each role matters because an inspection can become longer and more disruptive when handovers are confused.

Port state control is at its best when it exposes a genuine weakness before that weakness becomes an accident, pollution event or injury. It is also a controlled legal process with powers, thresholds and remedies. The arrival notice starts the administrative trail; the inspection tests evidence against the ship’s actual condition; the report defines what must happen; and close-out proves that it has happened. A tidy file helps. A ship whose crew can explain and operate its systems is better prepared.

Contributor: Paul Thompson / 24Ships

04.189
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.190
The Thames sailing barge still carrying commercial cargo
24 UNUSUAL

The Thames sailing barge still carrying commercial cargo

The Thames sailing barge is often presented as a handsome survivor, all spritsail and estuary light. Blue Mermaid offers a more practical question: can an engineless vessel with a traditional cargo hold still move goods under sail within a modern regulatory and commercial framework? The Sea-Change Sailing Trust’s barge received permission to carry cargo under sail between Lowestoft and Sandwich, including the Thames and the tidal rivers of East Anglia. Her operation depends on wind, tide, shallow-water access, loading limits and a crew capable of handling a large sailing vessel. That makes the cargo proposition intriguing, but highly specific.

04.191
Cont.
24ShipsThe Thames sailing barge still carrying commercial cargo

The Thames sailing barge still carrying commercial cargo

24Ships feature image.
24Ships feature image.

A cargo hold is a better place to begin than a photograph. On Blue Mermaid, the space beneath the deck is not a decorative reminder of an older trade. It is where cargo goes when the barge is working commercially; on a sail-training voyage, the same space can be fitted for tables, seating and bunks.

The change of use captures the bargain at the heart of the modern Thames sailing barge: a real vessel with a useful hold, operated within a business that also has to keep her maintained, crewed and moving when there is no freight to carry.

Blue Mermaid is operated by the Sea-Change Sailing Trust. The National Historic Ships register records that she was licensed in March 2023 to collect and deliver sail cargo anywhere between Lowestoft and Sandwich, entirely under sail. The trust describes her as engineless and says the cargo space becomes dedicated hold space when she carries a full load.

Those facts distinguish her from a charter barge that looks like a working vessel but does not carry goods, and from a conventional motor cargo craft that uses sail only as an auxiliary.

The route is coastal and estuarine rather than a simple line between two deep-water terminals. It encompasses the East Anglian coast, the tidal rivers of Norfolk, Suffolk, Essex and Kent, and the Thames. That geography is part of the vessel’s value and part of its limit. A shallow draught and a flat-bottomed hull can reach places inaccessible to deeper ships, but tidal windows, shoals, channel knowledge and suitable landing facilities govern where and when a barge can load or discharge.

Thames barges were shaped for that environment. The Thames Barge website describes the type as a flat-bottomed, shallow-draught sailing craft with leeboards, well adapted to the estuary and narrow tributary rivers. Historic working barges moved bulk and agricultural cargo around the East Coast, often using wind and tide to match their route. Blue Mermaid recreates the working form, but she is a modern vessel built with a modern regulatory basis.

Romance does not remove the need for load-line compliance, stability data, safe access, cargo securing and an operating plan.

The vessel’s cargo authorisation is especially instructive. National Historic Ships records that the MCA issued an exemption certificate in September 2022 and that the barge then entered service under her relevant exemptions, including the exemption applicable when carrying cargo. The registry notes that the stability data required by the MCA results in a cargo capacity of 110 tonnes, 40 tonnes below that of the original vessel.

24Ships feature image.
24Ships feature image.

That is a useful reminder of what a contemporary cargo operation costs: safe loading is based on documented stability and approved limits, not on the old barge’s historic tonnage or an appealing claim about how many lorries a voyage might replace.

The trust’s 2023 announcement of a cargo load-line permit says the vessel can collect and deliver cargo under sail between Lowestoft and Sandwich. It invites organisations interested in sending cargo around the region to make contact. It does not establish a scheduled freight service with published frequency, a fixed tariff or guaranteed capacity. That distinction is vital for a shipper considering the barge.

The operating capability exists; the logistics product still has to be matched to a real cargo, a real window and a real destination.

A useful cargo is one that tolerates the vessel’s pace and geography. It needs to be suitable for the hold, manageable within the approved load, capable of being secured, and deliverable at both ends without an expensive chain of road transfers cancelling the advantage. Goods with a fixed delivery deadline, high damage sensitivity or a requirement for frequent departures will be harder to accommodate.

04.192
Cont.
24ShipsThe Thames sailing barge still carrying commercial cargo

The Thames sailing barge still carrying commercial cargo

A locally produced, non-urgent consignment moving between accessible waterside points may fit much better, particularly if the sender values the story and the low-emission method as part of the product.

Cargo planning begins with dimensions and handling, not weight alone. A shipper should give the operator the full cargo description, gross mass, package dimensions, lifting points, handling equipment requirements, hazardous-goods status and any temperature or moisture constraints. The operator then has to assess how the load fits in the hold, its effect on stability, the sequence for loading and discharge, and how it will be secured.

An apparently light cargo can still be difficult if it is bulky, awkward to lift or difficult to stow without obstructing access or shifting in a seaway.

The loading point matters as much as the destination. The barge’s traditional shallow draft may make a tidal creek or small quay accessible, but a quay needs safe mooring, adequate depth at the planned water level, a workable transfer method and permission for the operation. If a crane is required, its reach and lifting capacity must match the vessel and cargo. If a forklift or ramp is proposed, the deck strength, load path and access have to be confirmed.

The shipper should not assume that a waterside address is a cargo terminal.

Tide is a working constraint, not atmosphere. A barge may have to arrive, load, sail or ground within particular tidal windows. Wind direction and strength can affect the route, departure time and whether a passage is prudent. The operator must plan with local knowledge and current forecasts, preserving the master’s authority to delay or change the passage. A customer’s requested delivery date has to be translated into a realistic range and contingency.

There may be no useful way to “make up time” by increasing engine speed because Blue Mermaid operates under sail and is engineless.

That engineless character is both a defining feature and a demanding operational choice. Wind and tide are the sources of propulsion, so the crew must understand sail handling, pilotage, tidal streams, local hazards and the vessel’s manoeuvring limits. Port approaches, tight turns, adverse winds and traffic require judgment; the absence of an engine removes a common fallback. The vessel’s safe operating limits and any assistance arrangements must be understood by those planning the passage.

A low-carbon voyage is not a reason to relax the margin of safety.

Crew competence is therefore a commercial input. A working Thames barge carries a substantial rig, and the operation depends on people able to set, reef and handle sails, manage lines and work the deck safely. The trust’s sail-training work can introduce participants to the vessel and its routines, but a cargo voyage still requires an appropriately qualified and experienced operating crew under the applicable arrangements.

Shippers should ask who is responsible for the cargo during the passage, what supervision applies to loading and discharge, and what insurance covers goods while they are on board.

The vessel’s work is seasonal in the broadest sense. The National Historic Ships record says the intention is to carry cargo at the beginning and end of each season and continue established sail-training work during the high summer. That is an important clue to the economics: freight does not have to be the only source of activity for the vessel to remain useful, but freight availability must fit around other work. A shipper seeking regular weekly capacity may not find it.

An organisation with a flexible consignment and a desire to support sail cargo may be better placed to use the opportunity.

04.193
Cont.
24ShipsThe Thames sailing barge still carrying commercial cargo

The Thames sailing barge still carrying commercial cargo

The central commercial calculation is not simply “sail versus lorry”. It includes the vessel’s voyage, the cargo’s collection and final delivery, handling at each end, loading and waiting time, any storage, and the cost of keeping the barge and crew ready. A road journey may be faster and easier to book but impose emissions and congestion. The sailing barge may offer a distinctive low-carbon movement, but the customer may need extra planning and road legs.

Comparisons should use the full door-to-door chain and an honest account of the service level.

There is potential for the barge to work well when cargo can be planned around a route the vessel already expects to make. A return load is especially valuable: it avoids a lightly loaded return passage and improves the use of the vessel’s time. The operator and shipper can coordinate cargo availability with a training or positioning voyage, provided the cargo operation does not compromise safety or the agreed purpose of the trip.

This is the sort of matching that a broker or cargo owner can help with: not by promising a regular liner service, but by finding compatible goods and waterside destinations.

Small-scale freight has a visibility advantage. A cargo carried under sail gives a producer a concrete account of how goods moved, and the vessel can be part of the product’s identity. That may matter to a local food business, maker or cultural organisation. But marketing value should not obscure the physical requirements. A cargo needs a manifest, loading plan, handling method, insurance terms and delivery agreement.

A beautiful photograph of sails does not resolve who bears the risk if the quay is inaccessible at the planned tide.

The regulatory pathway is one of the most difficult details to find in casual accounts of the vessel. The MCA publishes guidance, “Thames sailing barges: a standard of safety”, developed for their safe operation on categorised waters. Blue Mermaid’s recorded exemption and cargo load-line arrangements show how a historic vessel type can be accommodated through defined technical and operational conditions. They do not mean all old barges can carry cargo by default.

Each vessel has its own condition, survey history, stability information, operating limits and approvals. A would-be operator should speak to the MCA and appropriate technical specialists at the design stage, not after promising a customer a load.

For customers, the first question should be whether the proposed cargo and delivery points have already been assessed. Ask for the vessel’s permitted load, the loading location, the expected window, what can change the sailing plan, how the cargo is secured and insured, and what happens if weather or tide delays the movement. Establish whether the operator expects the shipper to provide lifting equipment or labour. Confirm the chain of custody at transfer, including who signs for the goods at each end.

These are ordinary freight questions, but they matter even more where the operation is unusual.

A booking should leave room for the master’s decision. If wind or visibility moves beyond the vessel’s safe operating limits, the voyage should wait or change. The customer can help by allowing a delivery window, keeping the cargo available and agreeing in advance what costs arise from a postponement. A contract that imposes a rigid arrival time without a realistic weather clause is not compatible with sail freight. Flexibility is not a courtesy to the barge; it is part of the service design.

The trust’s dual purpose also gives the vessel an unusual relationship with its cargo. The hold can serve as a training and residential space on one voyage and cargo space on another. That versatility may help sustain the vessel and introduce people to traditional seamanship, but conversions require proper planning. Furniture, bunks and equipment must be removed or secured before cargo loading; the cargo space must be prepared; and the programme has to allow time for the changeover.

04.194
Cont.
24ShipsThe Thames sailing barge still carrying commercial cargo

The Thames sailing barge still carrying commercial cargo

The operator’s calendar is therefore a resource with competing uses, and a cargo customer should not assume every available date is a freight date.

This is not a template for replacing mainstream freight. A 110-tonne load on a shallow-draught sail barge cannot compete with the volume, frequency and network reach of a modern coaster or lorry fleet. It can, however, perform a specific movement where the cargo, geography and schedule suit. That modest scale is not a weakness to hide. It is the condition that makes the service possible: limited tonnage, close local knowledge and the ability to reach tidal waterside locations that larger ships may not serve.

There is an ecological question too. Sailing without an engine for propulsion avoids fuel combustion during the passage, but the whole chain still has impacts: construction and maintenance, road transfers, cargo handling and the vessel’s positioning movements. The operator’s claim of low-carbon sailing is credible as a description of propulsion, yet a shipper seeking a quantified footprint should ask for the boundary and method used.

Avoid comparing a single sail passage with a lorry movement while ignoring the collection and final delivery legs. Clear accounting gives the cargo story substance.

A good pilot shipment would be deliberately unglamorous in its planning. Select a cargo that is non-hazardous, robust and not time-critical; agree an accessible load and discharge point; confirm the weight and dimensions; provide a flexible window; and document each handover. Measure actual time and cost, including road legs and handling. Record whether the vessel had a compatible return load and what work was needed to prepare the hold.

That evidence would tell a potential repeat customer far more than a general promise that sail freight is possible.

The Thames sailing barge survives commercially by being particular. Blue Mermaid is not a museum exhibit, but neither is she an everyday parcel service in canvas. She has a defined operating area, a limited approved load, a crew whose skill is central to propulsion, and a calendar shared with sail training. The right cargo will fit all of those conditions.

In that small space between a historic hull and a modern supply chain, the barge offers something rare: a working passage in which wind and tide remain part of the delivery plan.

Contributor: Paul Thompson / 24Ships

04.195
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.196
UK shipping enters the emissions trading system: how operators are reconciling voyage data
SUSTAINABILITY

UK shipping enters the emissions trading system: how operators are reconciling voyage data

The UK ETS began covering domestic maritime activity on 1 July 2026, bringing a new set of reporting and allowance obligations to operators of ships at or above 5,000 gross tonnage. The first scheme year is only six months long, but the records behind it reach across ship, voyage, port and company systems. A fuel invoice alone cannot explain which emissions fall in scope, how in-port activity is separated from a voyage, or who carries responsibility when vessel management changes. The first reporting cycle is therefore an exercise in reconciliation: align monitoring plans, operational data and verified reports before allowance exposure becomes a year-end surprise.

04.197
Cont.
24ShipsUK shipping enters the emissions trading system: how operators are reconciling voyage data

UK shipping enters the emissions trading system: how operators are reconciling voyage data

24Ships feature image.
24Ships feature image.

The first UK ETS maritime reporting period did not begin on New Year’s Day. It began on 1 July 2026. That half-year opening is easy to overlook in a fleet calendar already built around annual budgets, regulatory returns and commercial reporting. For covered operators, it is the start of a new set of records that must reconcile ship activity, fuel consumption, emissions, port calls and legal responsibility.

The scheme applies to ships of 5,000 gross tonnage and above, regardless of flag, for defined domestic maritime activity and in-port emissions at UK ports of call. The UK government’s guidance says domestic maritime emissions entered scope from 1 July 2026, while offshore vessels are due to be included from 1 January 2027. A domestic voyage is one that begins and ends at UK ports of call, including a voyage that begins and ends at the same port.

In-port activity includes emissions at berth and movements within a UK port of call.

That scope is narrower than “all emissions from every ship visiting the UK” and broader than “fuel burned on UK coastal passages”. The details decide the accounting. A port of call is tied to cargo or passenger activity; a stop solely for refuelling, supplies, crew relief in specified circumstances, dry dock, repairs, shelter or distress assistance is not treated in the same way. A voyage between two UK ports may remain in scope even if a vessel makes a non-UK stop for repairs en route.

The rules need to be applied to the facts of each itinerary, not inferred from a route label.

The first task for an operator is to determine who is responsible for each ship under the scheme. The legal “maritime operator” is not necessarily the registered owner or the company named on the vessel’s side. Government guidance explains that responsibility can be delegated through a legally binding written agreement. If responsibility changes, the emissions monitoring plan and relevant declarations need to be updated.

A management change, charter structure or transfer between companies can therefore affect reporting even if the ship, route and engine remain exactly the same.

Operators should begin by constructing a fleet responsibility register. For each vessel, record gross tonnage, activity, flag, owner, technical manager, commercial operator, responsible UK ETS operator, the effective dates of responsibility, and the agreement or evidence that supports the allocation. Reconcile that register against the fleet management system, charter records and emissions monitoring plan.

A spreadsheet assembled from several departments can be useful, but it needs a named owner and controlled version. The aim is to detect the ship listed under one entity in the monitoring plan and another in the company’s voyage or fuel system.

24Ships feature image.
24Ships feature image.

The monitoring plan is the operational backbone. An operator that carries out its first maritime activity under the scheme must apply for an emissions monitoring plan within 42 days. The plan sets out methods for monitoring and calculating emissions, including supporting procedures. It must reflect how the ships actually operate, the monitoring methods used and the operator’s internal risk assessment.

Changes that count as significant, such as adding a ship, adding a fuel or emissions source, or changing a monitoring method, have to be submitted in line with the guidance and statutory requirements.

This is where data reconciliation becomes real work. The scheme requires information for each ship on total fuel consumed by type, aggregated greenhouse-gas emissions from in-port activity, and emissions from relevant voyages between UK ports. The operator must also report certain company-level information, including eligible-fuel reduction claims and any surrender deduction. Those figures need to emerge from records that can be reproduced by a verifier and regulator.

The legal requirement is not satisfied by a single annual total copied from a fuel-management dashboard.

04.198
Cont.
24ShipsUK shipping enters the emissions trading system: how operators are reconciling voyage data

UK shipping enters the emissions trading system: how operators are reconciling voyage data

Fuel data usually sits in several places: bunker delivery notes, tank soundings, noon reports, engine logs, flow meters, purchasing systems and vessel performance tools. These records can use different units, time periods and definitions. One system may show fuel delivered; another shows consumption; a third estimates usage from engine load. Operators need an agreed hierarchy for data sources and a method for resolving discrepancies.

A bunker delivery is not the same thing as fuel consumed during a scheme activity, and a tank balance that crosses the reporting boundary must be handled consistently.

The boundary date deserves particular attention in the inaugural year. The first period runs from 1 July through 31 December 2026. Fuel consumed before 1 July is not part of that first scheme year merely because the invoice was received later. Equally, fuel bought in the final weeks of December may be consumed after the period or retained in tanks. The operator must apply the approved monitoring method, document its assumptions and avoid treating procurement records as activity data.

Where an inventory balance is needed, opening and closing quantities, deliveries, transfers and measurement uncertainty should be traceable.

A voyage ledger should identify each movement that may meet the definition of a domestic voyage. The record should include departure and arrival times, ports of call, cargo or passenger activity, any intermediate stop, and the reason for that stop. The port-call definition matters: a vessel’s presence at a place does not automatically mean a port call for ETS purposes.

For example, a stop only to obtain repairs may be excluded as a port of call, while the guidance explains that a voyage between two UK ports can still fall within scope if the ship stops outside the UK for repairs. The operator needs enough evidence to apply the rule accurately.

In-port emissions are another reconciliation challenge. Ships can burn fuel at berth, manoeuvre within port limits, operate auxiliary engines, use boilers and run other combustion sources. The UK ETS guidance includes in-port activity at UK ports of call, so the operator must distinguish that activity from the voyage segment and avoid double counting. Port call timestamps, engine logs and fuel monitoring can be matched to a defined port boundary and activity period.

Where a vessel shifts berth or moves within port waters, the monitoring method needs to explain how those emissions are categorised.

The practical method will vary by ship and available data. Some operators may rely on fuel consumption records; others may use direct measurement, calculations based on fuel and engine data, or approved combinations under their monitoring plan. The scheme covers carbon dioxide, nitrous oxide and methane from maritime activities. Reporting in carbon-dioxide equivalent means emission factors and global-warming conversion values have to be applied consistently.

The plan should specify the source of each factor, the fuel type, the calculation and the person responsible for validating inputs.

Fuel names create a particular risk. A commercial invoice may use a grade or trade description that does not map neatly to the emissions-factor categories in the guidance. Blends and eligible sustainable fuels add certification requirements. The government permits eligible fuels to be assigned an emission factor of zero following a successful emissions reduction claim, but that is not an automatic consequence of a supplier’s marketing description.

The operator must have the required certification and meet the relevant sustainability and greenhouse-gas saving criteria specified by the UK authorities.

04.199
Cont.
24ShipsUK shipping enters the emissions trading system: how operators are reconciling voyage data

UK shipping enters the emissions trading system: how operators are reconciling voyage data

A fuel claim should be supported by a chain of evidence from supplier certification through delivery and onboard use. Confirm that the certificate relates to the quantity, batch and period claimed; that the vessel consumed the fuel within the relevant scheme scope; and that any allocation method in the monitoring plan is applied consistently. If the fuel is blended or mixed in tanks, record the calculation and assumptions.

A zero factor applied to an unsupported volume is a compliance error, and an eligible-fuel claim should not be used to mask gaps in ordinary fuel records.

Operators also need to deal with the gap between verified emissions and allowance surrender. The scheme requires a verified annual emissions report by 31 March after the scheme year. Allowances equal to the emissions figure for surrender must then be surrendered by the statutory deadline. For both the 2026 and 2027 scheme years, the surrender deadline is 30 April 2028; the 2026 report is due by 31 March 2027.

This double-surrender arrangement gives operators more time before the first surrender, but it does not defer the need to measure and report the first half-year’s emissions accurately.

That schedule can create a false sense of distance. A report due in March 2027 is only months away from the end of the first scheme year, and verification needs time. A verifier may request supporting records, explain anomalies, review the monitoring plan and sample calculations, and require corrections.

Operators should close the 2026 data set soon after year-end, reconcile it against ship and company records, and resolve exceptions while the crew and shore staff who produced the data still remember the circumstances. Waiting until the submission window invites rushed corrections and weak audit trails.

A well-designed reconciliation process uses exception reports rather than manual inspection of every line as the first control. Flag fuel consumption with missing noon reports; port calls without a clear cargo or passenger purpose; UK-to-UK voyages with unexplained third-country stops; periods when the responsible operator changed; zero or negative tank balances; and emission totals that differ materially from the expected range. Each exception needs an owner and a resolution record.

The final report should be generated from controlled data, not patched by hand at the last minute.

The operator should also test the joins between systems. Ship identifiers can differ: IMO number, company vessel code, registry name and accounting asset number. Port names may appear under local spelling, UN/LOCODE or terminal names. Timestamps can be recorded in local time or UTC. A reconciliation model should use stable identifiers and make timezone conversion explicit.

An apparently small mismatch can shift activity across the 1 July or 31 December boundary, change the classification of a port call or make a voyage appear to begin or end in the wrong jurisdiction.

Voyage data often sits with a ship manager while fuel procurement sits with the owner or charterer. A written responsibility agreement may allocate UK ETS obligations to a maritime operator, but the data needed to comply may remain elsewhere. Contract terms should require timely provision of fuel, voyage and port-activity information; identify the format and deadline; allow reasonable audit access; and provide for correction if records are incomplete.

The party legally responsible needs contractual access to the evidence, not just a promise that another party is “tracking carbon”.

A ship transfer or operator change within the year needs a clean cutover. The scheme guidance addresses the maritime operator responsible for compliance and requires changes to delegated responsibility to be reflected through the appropriate plan and declarations. The handover should identify the effective date and time, the vessel’s fuel inventory, open voyages, in-port periods, data records and monitoring method.

04.200
Cont.
24ShipsUK shipping enters the emissions trading system: how operators are reconciling voyage data

UK shipping enters the emissions trading system: how operators are reconciling voyage data

If a voyage crosses the transition, the operator should use the applicable rules and plan to allocate emissions correctly. A date in a management contract is not enough if operational responsibility or statutory accountability differs.

The same care applies to vessels operating between Great Britain and Northern Ireland. The UK ETS guidance identifies aggregated emissions for relevant voyages between those locations separately in the reporting information. Operators should not assume that every domestic-looking route is treated identically in every calculation. The monitoring plan and the current official guidance should be checked for the applicable treatment, with route data kept sufficiently detailed to support the categorisation.

If the rule is unclear for a specific itinerary, obtain a written response from the regulator or specialist adviser and retain it with the method record.

Verification is an independent check, but it cannot build the operator’s data system from scratch. The operator is responsible for complete monitoring, consistent methods and documented evidence. The verifier’s job is to test the report and its supporting basis against the scheme requirements.

A good internal pre-verification review asks whether another competent person can reproduce the calculation from the retained records; whether every source and emission factor is identified; whether missing data has been handled under the approved method; and whether the result is consistent with the ship’s operational profile.

The Environment Agency is the regulator for many operators, while devolved regulators have responsibilities for activities under their jurisdictions. Operators should confirm the appropriate regulator and reporting route through current government guidance and METS, the Manage your Emissions Trading Scheme reporting service. The maritime operator account, monitoring-plan application, annual report and related communications need secure access and designated representatives.

Account access should not depend on a single employee, especially when a deadline falls during leave or a staff change.

The data set can also improve operational decisions, but its first purpose is compliance. Once a company has trustworthy fuel and activity data, it can compare ship performance, port time and route patterns. That analysis can help identify where fuel use is concentrated and whether an operational change altered emissions. Yet the operator should keep regulatory calculations distinct from voluntary estimates or commercial carbon claims.

A customer-facing footprint may use a different boundary; if so, document that method and avoid presenting it as the UK ETS figure.

The cost exposure has to be understood at fleet level. The emissions figure for surrender is the maritime emissions figure adjusted for any applicable surrender deduction. One allowance is required for each tonne of CO2 equivalent in the figure for surrender. Operators should forecast likely emissions, understand allowance purchasing and registry arrangements, and assign authority for acquisition and surrender.

A valid report does not itself put allowances in the holding account, and a budget estimate cannot replace the verified emissions figure.

For the first scheme year, the immediate work is modest in calendar length and substantial in data discipline. Confirm which ships are in scope; identify the responsible operator; ensure the monitoring plan covers real operations; capture fuel, voyage and in-port records from 1 July; resolve ambiguous calls and fuel claims; and prepare the data for verification before the March deadline.

The process should be tested against a vessel with a management change, a voyage involving an unusual stop and a fuel record that does not reconcile at first glance.

The new obligation is not solved by hiring a carbon consultant at year-end. It sits at the junction of fleet management, voyage planning, fuel procurement, port records, legal responsibility and finance. Operators that join those records early will find mismatches while they can still be corrected. Those that wait will discover them in a verifier’s query, when the clock is already running.

The first UK maritime ETS cycle is a short reporting period with a long operational memory: every figure needs a ship, a time, a method and a responsible person behind it.

Contributor: Paul Thompson / 24Ships

04.201
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.202
North Sea wind farms and commercial traffic: who gets priority in a crowded sea?
OPERATIONS

North Sea wind farms and commercial traffic: who gets priority in a crowded sea?

A wind farm is not a wall at sea, and a shipping lane is not an empty line on a chart. Around the Dutch sector, cargo ships, service craft, construction vessels, fishing boats and emergency responders work within a patchwork of permanent routes and temporary activity. The Netherlands Coastguard’s permit system offers a revealing view of how these encounters are managed: guard vessels, buoyage, pilotage and sometimes a pause in work. The practical question for a bridge team is not simply whether a vessel may pass a wind farm, but what activity is happening there today, who is controlling it and how much room remains for a safe decision.

04.203
Cont.
Additional Q4 editorial graphic.
Additional Q4 editorial graphic.
04.204
Cont.
24ShipsNorth Sea wind farms and commercial traffic: who gets priority in a crowded sea?

North Sea wind farms and commercial traffic: who gets priority in a crowded sea?

24Ships feature image.
24Ships feature image.

The North Sea looks spacious on a small-scale chart. At bridge level, that impression disappears quickly. Traffic separates into streams, offshore installations occupy large working areas, and the vessels supporting them move on schedules of their own. A merchant ship may be making for a deep-water port; a crew transfer vessel is trying to reach a turbine before the weather closes in; a construction ship is holding position over a cable route.

Each has a different speed, manoeuvring envelope and reason for being there. The question of priority is therefore less about who has the right to the sea than about how risks are kept legible when several operations overlap.

The Dutch sector provides a useful case. Offshore wind development has brought fixed infrastructure into a sea already used by shipping, fishing, search and rescue, and energy industries. The wind farm itself is only part of the operational picture. Survey vessels, installation ships, guard vessels, cable-laying craft and maintenance crews create activity that moves over time.

A site that appears quiet on a general chart may be busy in practice, while a construction corridor or a work area can shift as a project advances.

That distinction matters to the officer planning a passage. A wind farm boundary is a durable charted feature; the day’s construction activity may be temporary and described through notices, permits or coastguard information. Treating both as the same kind of obstacle can lead either to unnecessary avoidance or to an overconfident route through a live work area. Passage planning must join the fixed geography to the current operating picture.

The Netherlands Coastguard’s North Sea Activity application makes that temporary layer unusually concrete. Planned activities in the Dutch part of the North Sea must be reported, except for activities in approach areas. The application process can result in conditions such as a guard vessel to warn nearby shipping, buoyage marking the work site, suspension of work in poor visibility, or a North Sea pilot to guide traffic, sometimes alongside one or more guard vessels.

The Coastguard asks for an application at least five working days before the proposed start. That lead time is a reminder that the safety arrangements begin before the work ship reaches the field.

A permit does not create a private sea. It creates a managed activity with conditions attached. A guard vessel’s job is not simply to stand watch over a project: it can provide a warning to passing ships, clarify the working footprint and relay information between the work site and traffic. Buoyage makes the limits more visible, but visibility alone does not solve the problem of a large vessel’s stopping distance or a small service craft’s limited sea room.

24Ships feature image.
24Ships feature image.

The value lies in giving other users time to understand what is happening and to choose a response.

This is why the Dutch Coastguard’s system is operational rather than ceremonial. Some tasks can be performed with a guard vessel and marks. Others may justify pilotage to guide traffic around a work area. Poor visibility may stop an activity altogether. Those are different mitigations for different conditions, not boxes to tick in a uniform procedure. A bridge team approaching the area needs to know which measure applies, whether it is active, and what communications have been established.

A second change comes from the north of the Dutch coast. Rijkswaterstaat announced that the Off Texel Vessel Traffic Service area became operational on 3 November 2025, introducing active traffic guidance on the northern and southern routes above the Wadden Islands. The decision gives a formal VTS layer to a part of the North Sea where commercial routes, island traffic and offshore activity sit close together.

VTS is not a substitute for the master’s judgement or the collision regulations; it is a means of building and sharing a clearer traffic picture.

04.205
Cont.
24ShipsNorth Sea wind farms and commercial traffic: who gets priority in a crowded sea?

North Sea wind farms and commercial traffic: who gets priority in a crowded sea?

The practical benefit is often modest in appearance and substantial in consequence. A call from a traffic centre may confirm a vessel’s intended track, identify an approaching crossing movement or alert a ship to activity that is not obvious from its own radar picture. In a region with multiple working vessels, a common reference point reduces the chance that different parties are making incompatible assumptions.

It can also help direct questions to the right authority rather than leaving a bridge team to infer the status of a work site from incomplete signals.

The arrangement reflects a broader reality: offshore wind has made the North Sea more intensively managed, not merely more crowded. Project operators organise their work, coastal authorities assess and permit activities, coastguards disseminate information and VTS centres manage traffic in defined areas. Shipping companies still own the quality of their passage plans. The system works when these responsibilities meet before a close-quarters situation, rather than after it.

The phrase “safety zone” can mislead if it suggests a single, permanent exclusion area around every wind farm. The legal and operational arrangements vary by country, project phase and activity. A project-specific safety zone may restrict entry, while a corridor can permit transit under stated rules; temporary operations can establish additional controls.

The Dutch Hydrographic Service’s annual Notices to Mariners set out restrictions and conditions for wind farms, including rules for fishing and activities that might extend from a vessel, such as lines or floats. The detail is location-specific, which is exactly why a generic assumption is unsafe.

For the navigators, the necessary habit is to separate “wind farm” into three questions. What fixed structures or prohibited areas are charted? What current works or restrictions are in force? What traffic-management service covers the route and what are its reporting requirements? Answering the first from the chart alone is straightforward. The second and third need current notices and information from the relevant authority.

If a route is close to an active site, a bridge team should have a clear plan for calling the Coastguard or VTS, not wait until it is already manoeuvring around a work vessel.

That preparation begins with the voyage plan. The route should include wind farm boundaries, designated corridors, cable areas and applicable approach routes, but it should also identify where temporary information will be checked and who will verify it. The company’s voyage-planning procedure can assign responsibility for checking notices, reviewing them at the pre-arrival conference and updating the bridge if the operation changes.

On a vessel with a long passage, a notice reviewed at departure may be stale by the time the ship reaches the relevant sector.

A useful bridge brief should focus on decisions, not a recital of chart symbols. Which side of the field offers the best sea room? At what point will the ship be able to alter course safely? Is there a speed restriction or a reporting call? What is the contingency if a service vessel crosses the intended track? Where does the master want the officer to call if the traffic picture changes? These questions translate a regulatory picture into a watchkeeping plan.

The bridge team should also resist the temptation to interpret a guard vessel as a traffic policeman with authority over every ship. Its presence marks an activity and provides a communication point; it does not relieve other vessels of their own collision-avoidance duties. A warning from a guard vessel should be treated as timely information. If the message is ambiguous, ask for the nature and limits of the work area, the intended manoeuvre of the project vessel and the authority managing the activity.

Short, specific radio calls are more useful than a general exchange of intentions.

04.206
Cont.
24ShipsNorth Sea wind farms and commercial traffic: who gets priority in a crowded sea?

North Sea wind farms and commercial traffic: who gets priority in a crowded sea?

The operational pressure is not evenly distributed. Construction work is expensive to interrupt, but a work schedule cannot override safe navigation. The project may have weather windows and charter commitments; a cargo vessel may be constrained by draught, tide, traffic separation or a pilot boarding time. Service craft may be small and fast, but their speed does not make them predictable to a deep-draught ship. Fair coordination recognises these differences without pretending they disappear.

In poor visibility, for example, the Coastguard’s ability to require work to stop is significant precisely because one party’s productivity target cannot be allowed to impose an unmanageable risk on passing traffic.

The larger commercial issue is predictability. Wind farm construction and maintenance are planned months ahead, and the movements of installation vessels can be anticipated. Shipping patterns are also visible to planners. The difficult part is synchronising information between actors whose systems and planning cycles differ. A ship agent may have the latest arrival estimate, a project controller the planned lifting window, and the Coastguard the permit conditions.

The master needs an operational summary, not a collection of disconnected messages.

The Off Texel VTS area offers one model for dealing with that information gap. Active traffic guidance means that ships in the area have a service intended to support safe and efficient movement. The precise service provided depends on the local VTS arrangement, so mariners should consult the published procedures and communication channels.

The important point is that offshore traffic management is increasingly a network: a coastguard centre for activity permits, VTS for traffic, hydrographic notices for restrictions, and project-side communications for the moving work site.

For operators, this network should be reflected in company procedures. Route checks must include offshore activity notices and national publications, not only electronic chart updates. If the ship is due to pass close to a wind farm, the bridge should confirm the latest information before the relevant watch begins. Masters should be encouraged to raise unclear restrictions early through the agent or company operations desk.

This is particularly useful for ships with limited manoeuvring room or cargoes that make an unplanned speed change costly.

There is also a case for better feedback. When a route is altered, a project vessel’s work is paused or a close encounter occurs, the information should travel back to the planning organisations. A near miss may reveal that a marked boundary is difficult to distinguish, a radio channel is poorly understood or the notice did not reach the vessels most affected. Safety management improves when this feedback produces changes to the next operation rather than being filed as an isolated event.

Wind farm operators and shipowners share an interest in avoiding disruption. An installation vessel waiting for a safe traffic gap loses time; a merchant vessel forced into an unexpected deviation burns fuel and may miss a berth window. There is a commercial argument for early coordination, especially for construction campaigns involving repeated heavy-lift or cable operations. The Coastguard’s application deadline is an administrative minimum, not an ideal time for all parties to start talking.

The project developer, contractor, port and affected shipping interests can often identify conflicts earlier through route and schedule review.

The same principle applies to emergency response. Offshore installations introduce fixed hazards and specialised rescue needs, while their supporting vessels may carry people far from shore. A serious incident can bring rescue craft, tugs and response teams into an already busy area. The published Dutch safety material for wind farm projects includes arrangements around vessel traffic, marking and response.

04.207
Cont.
24ShipsNorth Sea wind farms and commercial traffic: who gets priority in a crowded sea?

North Sea wind farms and commercial traffic: who gets priority in a crowded sea?

From the bridge, the practical lesson is to preserve room and avoid becoming so committed to a narrow route that a sudden response movement leaves no safe option.

Should commercial traffic get priority over offshore work? In the daily conduct of navigation, the answer is that no single user should assume an automatic right to obstruct the others. The hierarchy comes from the law, the local rules and the immediate circumstances. The more useful question is how a ship can recognise a developing conflict early enough that priority never has to be argued at close range.

Clear information, defined activity areas, sensible routing, working communications and the authority to pause hazardous work are the tools.

That answer is less dramatic than a contest between ships and turbines, but it is closer to the way the sea is actually managed. A wind farm’s footprint is fixed; its work is not. A vessel can be outside a designated zone and still be affected by cable work, a guard vessel or traffic moving to and from the installation. A corridor can look open and become operationally constrained for a few hours.

The bridge team needs to treat the offshore sector as a changing workplace and keep checking the conditions that make the planned passage safe.

Before the next North Sea transit, the useful checklist is simple: establish the charted restrictions, check current Coastguard and VTS information, identify the right call points, brief a specific response to changing traffic and leave enough margin to act. The question of priority is ultimately answered in advance, in the route plan and the information exchange, rather than in the last few minutes before two ships meet.

Contributor: Paul Thompson / 24Ships

04.208
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.209
Cable-damage investigations put anchor handling under scrutiny in the Baltic
TECHNICAL

Cable-damage investigations put anchor handling under scrutiny in the Baltic

When a cable fails beneath a busy sea, the first technical problem is reconstructing a short interval of ship operations from evidence spread across several places: the bridge, the anchor gear, the seabed and the vessel’s electronic record. Finland’s investigations into the Eagle S and Fitburg incidents show the range of material that can matter, from device data and crew interviews to anchor recovery and underwater surveys. They also show why a track on a screen is only a starting point. For ship operators, the practical lesson is to make anchor status, alarms, bridge decisions and data retention clear enough to withstand close reconstruction after an incident.

04.210
Cont.
24ShipsCable-damage investigations put anchor handling under scrutiny in the Baltic

Cable-damage investigations put anchor handling under scrutiny in the Baltic

24Ships feature image.
24Ships feature image.

A ship’s anchor can leave a long signature. In the Gulf of Finland, investigators have mapped drag traces across the seabed, examined the vessel that passed above them, and recovered an anchor for forensic work. The visible cable break is only one part of the record. To understand how a ship and its equipment produced it, investigators have to connect positions, machinery, bridge actions and physical marks, often gathered by different authorities over days or weeks.

Two Finnish cases demonstrate how that reconstruction works. The Eagle S case followed damage to power and telecommunications infrastructure in December 2024. A year later, investigators examined the Fitburg after two telecommunications cables were damaged in the Gulf of Finland on 31 December 2025.

The cases are at different procedural stages and should not be conflated: Finnish police said in June 2025 that the Eagle S criminal investigation had concluded and referred the case for consideration of charges; the Fitburg investigation concluded in June 2026, also referring the matter to prosecution authorities. In neither case does the existence of a damaged cable by itself establish intent or criminal responsibility.

The Fitburg case is particularly instructive as a sequence of evidence collection. Finnish police reported that information was gathered from the damage site, the vessel and devices belonging to crew members. The work included interviews, underwater surveys, technical and tactical investigative measures, and cooperation with Estonian authorities. The Finnish Border Guard identified the ship, directed it to a safe anchorage and later supported underwater investigation.

The vessel was taken to Kantvik for extensive investigative measures and was seized by the National Bureau of Investigation from 7 to 12 January 2026 to secure the investigation.

This sequence is a reminder that an investigation does not start with a neat AIS replay. It starts with a hypothesis about a casualty, then tests it against independent evidence. A position track may show that a vessel passed near a cable route. It cannot, by itself, show whether an anchor was deployed, whether it dragged, when the crew first knew, or whether the displayed position is precise enough to match a particular seabed trace. Those questions require corroboration.

AIS remains valuable. It can show the vessel’s reported position, course and speed, and when combined with other sources it helps locate periods where the track changes unexpectedly. But AIS should not be treated as a recorder of every bridge action. Its transmission intervals, reception gaps, sensor inputs and the integrity of its time stamps all matter.

24Ships feature image.
24Ships feature image.

A ship’s own AIS display is not a substitute for the wider record held by shore stations or satellites, and neither is a substitute for the vessel’s voyage data recorder or engine and deck logs.

The route from track to movement reconstruction includes data that commercial operators may not routinely place side by side. VDR audio and sensor records can establish what was said on the bridge and what indications were visible to the watch. ECDIS history, radar recordings if retained, engine orders and speed logs can clarify the vessel’s response. The bridge’s bell book, deck log and planned maintenance records can show how the ship was being operated and whether relevant equipment had a known defect.

Investigators may also obtain electronic records from crew devices, as the NBI said it did in the Fitburg investigation. The more these records use consistent times and are preserved without overwriting, the easier it becomes to test competing accounts.

Time discipline is a technical issue with operational consequences. If the VDR, ECDIS, engine control system and crew logs are not synchronised, an apparent sequence can become ambiguous by minutes or more. Near a cable route, a few minutes can represent a significant distance for a ship making way.

04.211
Cont.
24ShipsCable-damage investigations put anchor handling under scrutiny in the Baltic

Cable-damage investigations put anchor handling under scrutiny in the Baltic

Owners should confirm the time source and synchronisation procedure for bridge electronics, verify that the VDR is operating and that required recordings are retained, and train the crew to record unusual anchor events promptly. Good records are not an admission of fault; they are the best means of distinguishing a fault from an assumption.

Anchor status deserves particular attention because it is not always as simple as “up” or “down”. A vessel may have an anchor secured for sea, walked out to a brake, hanging in a hawse, or held by a chain stopper. The bridge should know what indication is available, who is responsible for confirming it and how the status is communicated after manoeuvres. A windlass control position is not necessarily proof that the anchor is physically secure.

The chain may be under tension, a brake may slip, or a connection may be damaged. A physical inspection and a clear deck-to-bridge report close the gap between a control command and the condition of the gear.

Finland’s earlier investigation of the Eagle S shows the importance of the physical anchor. In January 2025, the NBI reported that an anchor recovered from the end of a seabed drag trace had been examined. Investigators said its features and the place where it was found led them to believe it belonged to Eagle S; they suspected it had come loose from the chain when authorities asked the crew to lift the hanging anchor.

In June 2025, the NBI said the investigation had assessed the officers’ responsibility for the vessel’s condition and whether they should have observed the anchor falling into the sea. Those were investigative findings and suspicions, not a final judicial determination of liability.

The technical examination of an anchor is more than checking its identity. Investigators can compare its markings, shape, wear, damage and fittings with the vessel’s equipment records. Chain length and condition, windlass operation, brake setting and securing arrangements may all be relevant. A broken or damaged component may tell a different story from an anchor that remained attached.

The exact inference depends on the scene, the trail, the vessel’s design and the handling sequence; there is no universal forensic shortcut.

Underwater surveying provides the other half of the physical picture. In the Eagle S case, Finnish police described seabed examination and recovery of the anchor; in the Fitburg operation, the patrol vessel Turva helped map a drag trail over several tens of kilometres. For the later case, police said the investigation included underwater surveys.

Side-scan sonar can identify linear disturbance and objects on the seabed; multibeam echo sounders give bathymetric context; remotely operated vehicles can inspect a suspected trace or cable fault more closely. The tools answer different questions. A sonar image may reveal a mark, but investigators must establish its relation to the ship’s path, anchor and cable damage.

That work is inherently collaborative. The cable operator knows the cable’s route and fault location. Hydrographic and survey teams can map the seabed. The coastguard and border guard have immediate operational awareness. Police lead the criminal investigation, while transport regulators can inspect the ship’s compliance. Finland’s Fitburg inquiry involved the NBI, Border Guard, Defence Forces, Customs and Traficom, with a joint investigation team involving Estonian police.

The point is not bureaucratic complexity for its own sake. No single organisation has all the data or technical expertise needed to assemble the event.

04.212
Cont.
24ShipsCable-damage investigations put anchor handling under scrutiny in the Baltic

Cable-damage investigations put anchor handling under scrutiny in the Baltic

A shipowner can make that assembly easier through disciplined recordkeeping. The first task is to ensure that planned maintenance for anchoring equipment is current and traceable. Records should identify inspection dates, repairs, defects and tests, with the relevant part numbers and work descriptions. If a brake or stopper is adjusted, the record should say what was found and how the test was carried out. “Checked” is not a useful description after a casualty.

A technician’s report that records measured wear, adjustment and function provides a much firmer technical basis.

The second task is to make procedures specific to the vessel. The bridge and deck teams should know the company’s limits for anchor deployment, the checks required before and after use, how to report an unexpected movement of chain, and what action to take if an anchor is not secure. Ships operating in confined waters or areas with submarine infrastructure should review anchoring plans and no-anchor information before arrival.

A route plan should not depend on the officer noticing a cable warning at the last moment; it should put the relevant restriction where it can be acted upon.

An anchor alarm can support that process but cannot replace it. A bridge alarm based on GPS position may show that the ship has moved outside a defined radius while at anchor. It does not necessarily show whether the chain is dragging, whether the anchor has been lost, or whether the vessel’s reference position is correct. The radius has to reflect the vessel’s swing circle, depth, chain scope and local conditions. An alarm set too tight can become noise; one set too wide may arrive too late.

At sea, the useful alarm is one that is configured for the operation, heard by the responsible watchkeeper and followed by a defined response.

For vessels with electronic anchor-handling monitoring, operators should understand what the system actually measures. Chain counter, load, windlass speed, brake status and deck video may provide important clues, but only if the sensors are maintained and the data is retained. A screen reading without a time-stamped record is less useful in an investigation. If the system allows export, the company should know the format, location and retention period before an incident creates pressure to find them.

The bridge team also needs a common language for abnormal events. If an anchor is seen down, a chain is unexpectedly paid out or a warning indicates movement, the master should be informed without delay. The event should be entered in the log with time, position, course, speed, relevant equipment status and action taken. If the anchor is recovered, its condition should be recorded before cleaning or repair alters evidence.

Photographs taken safely and in context can preserve details that are otherwise lost during routine maintenance.

The same care applies to evidence preservation after a suspected contact. The master should follow the company’s incident procedure, maintain the VDR and related records, preserve logs and avoid resetting equipment or deleting data. The ship should report the event to the appropriate authorities and company channels. A cable outage may not be visible from the bridge, and a ship may not immediately know that an anchor has touched infrastructure.

A later notice or enquiry is not a reason to reconstruct records from memory when original data may still be available.

There is a commercial dimension too. A vessel held while authorities inspect it may lose a cargo window and incur delay, even where the investigation ultimately does not establish wrongdoing. Owners need an evidence-response plan that identifies who can retrieve electronic data, who can communicate with investigators and how technical specialists will be engaged. Crew should be supported in preserving evidence and giving accurate accounts.

04.213
Cont.
24ShipsCable-damage investigations put anchor handling under scrutiny in the Baltic

Cable-damage investigations put anchor handling under scrutiny in the Baltic

The plan should not coach testimony; it should prevent avoidable loss of the record and help the company respond quickly to legitimate requests.

Investigators, for their part, have to resist a simple narrative built around a striking seabed mark. A drag trace can connect the seabed to an anchor path, but it does not alone establish the sequence of deployment, the crew’s knowledge or intention. A vessel track can narrow the likely period, but it cannot substitute for bridge data and physical findings.

The analytical task is to test consistency: does the track match the trace; do anchor and chain condition support the proposed movement; do electronic records show an alarm or change in status; do interviews align with the equipment record? Each source limits the others.

The Fitburg investigation’s public account is deliberately concise. Finnish police said the inquiry collected evidence from the site, the vessel and crew devices and included interviews and underwater surveys. They concluded the criminal investigation with four suspects and referred the case for consideration of charges. That is enough to show the breadth of the evidence chain, but not to publish technical conclusions the authorities have not released.

For operators, the value is methodological: multiple sources, an international team and a preserved physical scene.

In the Baltic, infrastructure density and intense traffic make good anchor discipline a routine navigation concern. The relevant cables and pipelines are marked on charts and supported by notices and national information, but markings do not absolve a ship from keeping anchors secured at sea or verifying their condition. Passage planning should identify sensitive routes, and anchoring plans should account for weather, depth, holding ground, swing room and infrastructure.

If an emergency requires anchoring near a restricted area, the master’s decision and the circumstances should be carefully recorded and reported.

The strongest protection is layered. Reliable gear reduces the chance of an unintended deployment. Clear bridge-deck communication catches an abnormal condition. A well-set alarm can provide warning. Time-synchronised systems and robust records make reconstruction possible. Chart and notice discipline prevents avoidable exposure. None is perfect alone. Together, they turn a difficult investigation from a contest of recollections into a technical account that can be checked.

A cable incident begins below the waterline, but the evidence often begins on deck: a pin, a brake, a chain counter, a voice on the bridge or a position fixed at the right time. Good operators cannot control what a court or investigator ultimately concludes. They can make sure that when the question is asked—where was the ship, what was the anchor doing, and who knew?—the answer does not have to be guessed.

Contributor: Paul Thompson / 24Ships

04.214
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.215
How a Hamburg terminal plans berth windows around river constraints
INSIDER

How a Hamburg terminal plans berth windows around river constraints

At Hamburg, a berth window is only useful if a ship can reach it. The port’s tidal Elbe, variable water levels, draught limits and dense river traffic make the run upriver part of the scheduling problem, not a prelude to it. Hamburg’s Nautical Control Centre receives vessel details and requested berths in advance, then coordinates movements with pilots and traffic systems. The result is a sequence of linked decisions: which tide permits the passage, what draught is available, whether another vessel can meet or pass, and how a changed arrival alters the plan. For operators, useful schedule discipline starts well before the estuary.

04.216
Cont.
24ShipsHow a Hamburg terminal plans berth windows around river constraints

How a Hamburg terminal plans berth windows around river constraints

24Ships feature image.
24Ships feature image.

A berth window in Hamburg begins well before a ship sees the cranes. The vessel may be hours from the terminal, still outside the Elbe approaches, when its draught, arrival estimate and requested berth begin to shape decisions on the river. If the tide is wrong, the ship may wait. If a passing movement conflicts with a deep-draught arrival, the sequence may change. If cargo is added or a late departure pushes the ETA, a carefully assembled plan can lose its value before the pilot boards.

Hamburg’s Nautical Control Centre sits at the heart of that choreography. In the Port of Hamburg’s account of the river passage, the centre is described as the traffic control hub of the Waterways Authority, responsible for vessel movements within the port’s jurisdiction. Quay operators, brokers, shipping companies and masters report vessels at least 24 hours in advance, including identification, draught, structural details and requested berth.

The information gives planners a working picture, not a guarantee: tides, water levels, traffic and ship readiness continue to change.

The Elbe is a tidal river, and the port’s own description notes that the tidal range in Hamburg is almost four metres, varying further downstream. Many vessels have to navigate in accordance with the tide. For a large container ship or bulk carrier, the available water is not a static number printed beside a charted depth. It is a calculation involving the fairway, predicted tide, actual water level, under-keel clearance policy, ship’s draught and the required passage time.

That is why the term “berth window” can be misleading if it is understood as a terminal appointment. The terminal may have a quay available from a particular time, but the vessel has to be capable of reaching it safely and being admitted to the port. The nautical plan and the cargo plan overlap. A vessel’s arrival is not operationally useful if the river passage cannot be made at the relevant water level or if another movement occupies the route.

A master’s draught report is therefore more than a formality. It feeds into a system of permitted access and movement. Hamburg’s maritime shipping rules require a seagoing vessel’s berth permit application at least 24 hours before arrival, with the vessel’s name, call sign, flag, size and draught, agent, and arrival date and time. Ships also report passages at designated points.

For a ship planning Hamburg, early and accurate information gives the control centre a chance to coordinate; late or inaccurate figures compress the margin available to everyone.

24Ships feature image.
24Ships feature image.

The constraint can be physical. A loaded ship may need a favourable tide to pass a shallow reach, while its berth may be available only after another vessel sails. The combination can create a narrow sequence: inbound vessel waits for water, outbound vessel clears, pilot and tugs are ready, and the arriving ship proceeds at the agreed time. A small change in actual draught or tide can alter the calculation.

A late cargo amendment, ballast change or freshwater density adjustment should therefore travel promptly through the master, agent and terminal rather than emerge at the pilot boarding station.

Hamburg’s river information systems support that coordination. The port authority has described PRISE, the Port River Information System Elbe, as an IT platform tailored to Hamburg’s requirements, alongside modernisation of the Vessel Traffic Service Centre. The operational value of a shared river picture is straightforward: the parties can work from the same planned movements and update them as circumstances change.

It does not remove the need for pilotage or the master’s assessment, but it can reduce the number of incompatible assumptions travelling up the river.

04.217
Cont.
24ShipsHow a Hamburg terminal plans berth windows around river constraints

How a Hamburg terminal plans berth windows around river constraints

Pilots and traffic controllers have different jobs. A pilot advises the master on local navigation, manoeuvring and conditions. The Nautical Control Centre manages traffic movements and port jurisdiction. The Port of Hamburg describes close radio coordination and observation between pilots and control centres, particularly for large vessels that can pass only at certain water levels.

For the master, the important point is not to blur responsibility: local knowledge and traffic sequencing complement the command relationship on the bridge.

A late arrival is where those roles become visible. Suppose a ship’s ETA slips because of weather, a port delay or a machinery issue. The berth may still be free, but the available tide may have narrowed or another ship may now be committed to the channel. The agent must update the port’s arrival information; the terminal may reassign labour or crane plans; the control centre may need a revised movement sequence; the pilot and tug resources may be affected.

A change that looks like a single ETA adjustment on the ship’s schedule can therefore propagate through the system.

The worst response is to hold an old ETA as if it were a promise. Schedules are most useful when they are credible and updated early. A master or operator should report uncertainty as soon as it becomes material, with a realistic range and the reason for the change. That allows the terminal and port planners to protect the next workable slot instead of keeping resources committed to an arrival that is no longer plausible.

On a tide-dependent river, a delayed ship may not simply arrive an hour late; it may miss the water window and lose a full sequence.

The relationship between arrival time and draught is equally sensitive. Hamburg’s tidal Elbe fairway was deepened and adjusted, and the Port of Hamburg reported that new target depths became effective on 23 September 2025, allowing greater draught for container ships after a period of restrictions. The adjustment increased navigable depth by up to 50 centimetres according to the port’s publication. Such changes are significant, but they do not make draught planning obsolete.

The permitted figure depends on the applicable section and conditions, while actual water levels can still differ from prediction.

For an operator, the right question is not “What is the maximum draught into Hamburg?” but “What draught is available for this ship, on this route, at this time, under the current water-level and traffic conditions?” That question belongs in the voyage planning exchange well before arrival. The ship should provide accurate forward and aft draughts, trim and relevant dimensions. The agent should confirm the current local requirements.

The master should avoid making a commercial loading decision on the basis of a headline depth alone.

River traffic adds another layer. The Elbe is not exclusively a deep-sea approach. Inland vessels, ferries, tugs, service craft and ships serving ports upstream use the waterway. A large ship may have limited room to manoeuvre and cannot freely alter speed or course. The control centre’s sequencing and passing rules are therefore a safety mechanism as well as a scheduling tool.

A vessel’s position in the queue is not simply first-come, first-served; draught, direction, tide, visibility and the movements of other ships can change the order.

The terminal’s berth plan must take account of the arrival sequence, but its planners are not the river traffic authority. Terminal planners schedule cranes, labour, cargo operations and quay availability. Ship agents manage information and services. Pilots guide the vessel. The control centre organises traffic. A reliable call depends on these functions sharing usable data, each within its own remit.

04.218
Cont.
24ShipsHow a Hamburg terminal plans berth windows around river constraints

How a Hamburg terminal plans berth windows around river constraints

Confusion begins when a ship assumes that a confirmed berth means an unconditional river transit, or when a terminal assumes that a vessel’s advertised ETA equals a viable pilot time.

The 24-hour reporting requirement should be treated as a floor, not a target for communications. A ship sailing from the previous port should send an initial estimate and update it as the voyage develops. The closer it gets to the Elbe, the more important it is to report changes in speed, weather, draught and readiness. Agents can then confirm pilot orders, tug needs, berth instructions and documentation.

If a cargo plan changes, the master should ensure the declared draught remains accurate and any revised arrival is distributed through the proper channel.

There is a particular discipline around the estimate of arrival. A useful ETA incorporates the ship’s actual speed capability, weather routing, traffic, passage restrictions and any expected slowdowns. An ETA calculated at an ideal service speed and left unchanged through a head sea is not an operational forecast. At Hamburg, where access may be tied to tide, even a modest prediction error can have consequences.

Operators should agree a common ETA process between bridge, office, agent and terminal, with explicit triggers for updates.

The control centre’s river picture is only as good as the inputs it receives. Correct vessel identity and dimensions matter. So do accurate draught figures and clear reporting at the prescribed points. If a ship’s loading condition changes after reporting, the revised values must be shared. Masters should be wary of treating a data submission as a clerical task delegated entirely ashore; the information is nautical, and the bridge team remains responsible for its accuracy.

A useful pre-arrival conference for Hamburg should address more than pilot boarding time. It should confirm the current draught plan, tide dependence, any restrictions on passing or meeting, reporting points and channels, tug arrangements, berth assignment and the contingency if the ship misses its window. The master should know who will communicate a revised slot and how quickly an instruction must be acknowledged.

For a large vessel, the bridge team should understand whether the passage is expected to proceed in a particular tidal phase and what conditions could delay it.

The river’s sediment regime is another reason access cannot be reduced to a single depth number. The Elbe carries material from upstream and receives sediment from the North Sea, and Hamburg’s waterway strategy describes continuous movement and deposition. Maintaining navigable depth is an ongoing task involving dredging and sediment management.

The operational consequence is that waterway access is maintained through a combination of infrastructure, monitoring and planning, rather than being a permanent physical guarantee.

This context matters when stakeholders discuss deeper access as a solution to all constraints. A deeper fairway can increase the options available to larger ships, but it does not eliminate tides, river traffic, berth availability or environmental and maintenance considerations. Nor does it automatically make a ship’s existing loading plan feasible on a particular day. The ship still has to comply with the current rules, and the port still has to fit the movement into a shared waterway.

When a ship’s load condition changes, the commercial temptation can be to protect cargo intake until the final possible moment. The operational risk is that the draught information used for passage planning no longer reflects the ship. A modest increase can matter near a limiting reach; an unexpected trim can affect handling. The master should insist that loading decisions are checked against the current access calculation, with the agent and terminal informed before departure from the loading port if possible.

A small cargo gain that causes a missed tidal window may be a false economy.

04.219
Cont.
24ShipsHow a Hamburg terminal plans berth windows around river constraints

How a Hamburg terminal plans berth windows around river constraints

The same logic applies to ballast. Ballast operations change draught and trim, but they also take time and can affect arrival readiness. The plan should identify whether the ship will arrive at its declared condition or whether a change is expected before the relevant river section. If a ship must alter ballast to comply with access requirements, the sequence and time needed should be understood. The bridge should not be left to reconcile a new draught with a stale berth slot while approaching the pilot station.

From the shore side, berth planners gain most from a ship that communicates early and consistently. A terminal can sometimes move labour or equipment around a revised arrival, but there is a limit to flexibility when another vessel, tide or cargo sequence is fixed. Port traffic management can optimise movements, but it cannot manufacture extra water or passing room. The system is resilient when everyone knows which constraint is binding and when it will change.

For a late ship, the first call should be the agent and the relevant port contact, with the revised ETA and reason. The master should avoid assuming that a pilot booking automatically moves with the ship. The agent should confirm whether the pilot station, tug plan, berth and traffic sequence still stand. If the ship’s draught or trim has changed, that needs to be reported at the same time. A new ETA without new particulars can leave the port planning on a false picture.

For planners, a more robust berth window is built around ranges and decision points rather than a single clock time. The plan can state the earliest credible arrival, the expected tidal opportunity, the latest time at which a safe passage remains feasible and the next available alternative if it is missed. That approach makes risk visible to the commercial team. A firm but unrealistic ETA gives the appearance of certainty while hiding the cost of a missed tide.

Hamburg’s system shows why the pilot and the planner are not separate from the schedule. The pilot’s local assessment, the control centre’s traffic sequence and the terminal’s quay plan have to converge on a ship in a particular condition. A vessel can be technically ready and still be unable to proceed because the river is not. A berth can be free and still not be reachable. Good planning makes those dependencies explicit before they become delay.

The river does not negotiate with a timetable. It offers a set of conditions that can be used well or poorly: depth, tide, current, traffic and visibility. The ship and port can improve the information around those conditions, align their decisions and preserve alternatives. The most valuable berth window is not the one that looks precise on a spreadsheet. It is the one the ship can safely reach, at its actual draught, through a sequence that the river and the rest of its traffic can accommodate.

Contributor: Paul Thompson / 24Ships

04.220
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.221
The Netherlands’ historic coaster that still works the Wadden Sea
24 UNUSUAL

The Netherlands’ historic coaster that still works the Wadden Sea

On Spiekeroog, the delivery timetable belongs to the tide. The island’s freight service has to fit cargo into a low-water landscape where road transport ends at the mainland and the last stretch depends on a vessel suited to the landing and the harbour. Since February 2026, the Spiekeroog IV has been used exclusively as a landing craft for freight, giving the operator more flexibility in departure times and shorter rotations. Its booking rules reveal the practical machinery behind a small island’s supply chain: bulky loads need advance notice, cargo has a cut-off before sailing, and a missed tide can mean waiting for the next run.

04.222
Cont.
24ShipsThe Netherlands’ historic coaster that still works the Wadden Sea

The Netherlands’ historic coaster that still works the Wadden Sea

24Ships feature image.
24Ships feature image.

A pallet of building material cannot argue with the tide. On Spiekeroog, its journey ends with a landing craft and a schedule shaped by water depth, cargo handling and the capacity of a small island network. The road vehicle that brought it to the mainland port cannot simply continue across the Wadden Sea. The freight has to be registered, delivered before the ship’s cut-off and carried on a vessel that can work the island’s harbour conditions.

The ship in that role is the Spiekeroog IV. The island’s official logistics information says that since February 2026 it has been used exclusively as a landing boat for freight, rather than for regular passenger traffic. The change, the operator says, gives it more flexibility in departure times, shorter rotations and the opportunity to carry freight reliably at earlier times. It is a modest operational adjustment with an outsized effect on a supply chain where a missed sailing can become a missed day.

Spiekeroog is one of Germany’s East Frisian islands, separated from the mainland by tidal waters and protected landscapes. The island’s own freight guidance puts the basic constraint plainly: ebb and flood determine who or what can be carried from one place to another. It is not just a matter of waiting for a ferry. The service has to fit the conditions of the route, the landing arrangement and the destination’s limited infrastructure.

The assignment calls this a historic coaster, but the verifiable current vessel is more specifically described by its operator as a cargo and passenger ferry that has now shifted to freight-only use. That distinction matters. The attraction of the story is not a romantic label; it is the survival of a specialised small-vessel supply service, adjusted to the working realities of an island. Its value lies in what the vessel can carry, when it can sail and how the cargo reaches its final user.

The route begins well before the gangway or loading ramp. Freight must be declared through the freight office at Neuharlingersiel or through the island’s freight agent, Lüders Logistik. The operator says that scheduled goods, construction materials, larger freight or empty shipments, and bulky items must be registered at least 48 hours ahead so that delivery can be planned on time.

Cargo should arrive at the freight acceptance point no later than an hour before the Spiekeroog IV’s departure if carriage on the same day is wanted. Goods arriving after the cut-off may not sail until the next day.

These rules are not administrative fuss. They reflect a vessel doing more than transporting a passenger vehicle on a predictable road-like route. Cargo must be accepted, marshalled, loaded and delivered through a chain of limited spaces and tidal opportunities. A freight list that changes at the last moment can disrupt the loading sequence or exceed what the vessel can handle. Advance notice turns the sailing from a hopeful delivery into a planned operation.

24Ships feature image.
24Ships feature image.

The Spiekeroog IV’s dedicated freight role since February 2026 suggests a practical response to demand. A mixed passenger and freight vessel has to divide its schedule, loading arrangements and operational attention between different kinds of traffic. An exclusively freight-focused landing craft can be deployed around cargo requirements. The operator identifies shorter rotations and earlier freight departures as benefits.

Those are useful advantages on an island where bulky deliveries and time-sensitive supplies need to fit the same narrow transport chain.

There is no road bridge to the island and no truck arriving at an island warehouse from a motorway. The transfer across water is the critical link between mainland supply and local distribution. Once cargo is landed, Lüders Logistik handles delivery on the island, according to the official freight page. The maritime leg is therefore one part of a joined-up operation: booking, mainland acceptance, vessel loading, landing and last-mile distribution.

If any link slips, the cargo may sit at the mainland port or wait on the island for another delivery cycle.

04.223
Cont.
24ShipsThe Netherlands’ historic coaster that still works the Wadden Sea

The Netherlands’ historic coaster that still works the Wadden Sea

This is a service where vessel dimensions and landing arrangements shape the economics. A large ship with more capacity might look efficient per tonne, but only if the harbour, approach, berth and shore-side handling can accept it. A smaller vessel can be a better fit if it can get closer to the landing point, operate in shallower water or complete a rotation with less infrastructure.

The useful measure is not tonnes per voyage in isolation; it is reliable delivery per available tide and the total cost of moving goods from the mainland supplier to the island user.

The Spiekeroog IV is part of the island’s transport system, but it is not a general coaster carrying cargo from port to port in the conventional short-sea sense. It is a dedicated link in a local service, and that makes the term “coaster” a poor guide to its work. The vessel’s assignment is shaped by a specific island, landing point and freight regime.

It is precisely this specialisation that makes the operation resilient: the ship and shore system are arranged around the island’s needs rather than assuming the island can adapt to ordinary mainland logistics.

The cargo itself is varied. The freight operator’s guidance explicitly mentions construction materials, scheduled consignments, larger shipments, empty loads and bulky items. A small island has to receive goods for building, maintenance, commerce and daily life, but its transport capacity is finite. The logistics company must plan what can be moved on a particular sailing and how it will be distributed after arrival.

Oversized freight may need special handling; vehicle transport must be booked; goods must be delivered before the cut-off. Each category changes the practical loading plan.

For the shipper, the useful lesson is to treat freight acceptance as part of the sailing, not as a warehouse drop-off. A booking should establish the cargo’s dimensions, weight, handling needs and delivery urgency. The 48-hour lead time is particularly important for bulky or construction loads because the operator needs room to plan them into the service. A cargo owner who assumes that a vehicle can turn up at the port and be accepted like a parcel risks leaving material behind.

A missed cut-off has a clear consequence: cargo arriving after acceptance closes is carried no earlier than the following day, according to the island’s published guidance. That detail tells the reader more about the operation than a fleet list would. The vessel’s capacity is only useful if the cargo reaches it at the right time. The island supply chain has little slack at the final transfer point, so punctuality on the road and at the freight office matters as much as the vessel’s sailing time.

Tidal scheduling also affects the meaning of “on time”. A published departure may be adjusted to fit conditions, and the first available sailing may not be the most useful for every cargo type. The freight page provides an up-to-date schedule and acceptance times, with separate period files. That is the source shippers should consult before dispatching goods. A supplier’s own delivery estimate or a previous week’s timetable cannot replace the current freight schedule.

The operator’s switch to a freight-only Spiekeroog IV changes the way capacity is allocated. The vessel can concentrate on cargo handling, shorten rotations and take freight at earlier times. These are operational benefits rather than a promise that every cargo can travel immediately. Capacity, loading sequence, water conditions and the receiving side still matter. The change gives the service more flexibility; it does not abolish the Wadden Sea’s physical limits.

04.224
Cont.
24ShipsThe Netherlands’ historic coaster that still works the Wadden Sea

The Netherlands’ historic coaster that still works the Wadden Sea

The island’s tourism economy can make the freight service easy to overlook. Passenger ferries attract attention because their schedules are public and their customers are visible. Freight moves in a quieter system of bookings, vehicle spaces and delivery windows. Yet building work, maintenance and daily commerce depend on the ability to carry goods across the water. A dedicated cargo sailing may be less visible than a passenger departure, but the island’s practical autonomy rests on both.

The Wadden Sea setting puts a premium on local knowledge. Water levels and tidal windows are not abstract values; they govern the route and the landing. Crews must understand the limits of the vessel and the conditions at the receiving point. Shore staff must align cargo readiness with departure. The relevant expertise sits across the whole service, from the master’s judgement to the freight office’s cut-off time. A ship can be seaworthy and still be the wrong choice for a particular landing or load.

That is why the island ferry’s operational identity should be read from its task, not its appearance. A landing craft may look simple beside a modern ro-pax ship, but it works within a demanding environment where the route is constrained by tide and shore infrastructure. Its productivity depends on quick loading, a suitable draft, access at the right water level and an efficient transfer ashore. Those requirements are no less technical because the vessel is small.

For a cargo owner, planning should begin with the island destination, not with the mainland supplier’s dispatch date. Confirm the required delivery day with the island freight operator. Register bulky cargo at least 48 hours ahead. Check the current acceptance time and sailing schedule. Allow enough time for the goods to arrive at Neuharlingersiel before the one-hour cut-off. Make clear whether the shipment is scheduled freight, a vehicle, construction material or an empty return load.

If the cargo is oversized or unusual, resolve handling before sending it to the port.

For logistics planners, the key risk is a chain of small delays. A late lorry misses the freight acceptance time; the cargo waits overnight; the island’s work crew loses a shift; another shipment is pushed back to a later rotation. An inland delay that would be absorbed by a frequent road service can be more consequential when the final leg depends on a dedicated vessel and a tide. Contingency should be measured in available sailings, not just kilometres.

A useful operational change would be shared visibility of the cargo cut-off, vessel schedule and island delivery plan. The public freight page already provides booking information and timetables, while the ferry operator and logistics company handle separate stages. Shippers should ensure that each party has the same delivery expectation. A note on the bill of lading saying “urgent” cannot create a sailing slot if cargo has not been booked or accepted in time.

There is an environmental dimension to this small-scale transport, though it should not be romanticised. Consolidating goods onto a vessel avoids some individual trips by smaller craft and can be more efficient than moving every item independently. But the precise emissions benefit depends on load factor, vessel fuel, route and the mainland and island transport legs.

Public sources for the Spiekeroog IV do not publish a route-level emissions figure, so the defensible claim is operational: one planned freight service carries goods that would otherwise still need to reach the island by water.

The Wadden Sea’s protected status also makes low-impact logistics important. Transport cannot simply be expanded without considering the surrounding environment, and the vessel’s service has to work within local rules and infrastructure. The island’s reliance on the tide is both a constraint and a reminder that this is a living maritime landscape, not an empty shortcut between two terminals. Reliable freight planning is valuable partly because it reduces the pressure to improvise extra movements.

What makes the Spiekeroog IV unusual is not that it is old or quaint; the available official material does not establish either description. It is that a vessel has been assigned a sharply defined role in a modern supply chain: a freight-only link from the mainland to an island where tide, landing conditions and limited infrastructure dictate the rhythm. In a logistics industry that often celebrates scale, this service demonstrates a different kind of efficiency, built around fit.

The shipper who wants to use it well should respect the clock on shore as much as the tide offshore. Book early, describe the load accurately, check the current sailing and meet the acceptance cut-off. The island’s delivery system can work with the constraints it knows about. It cannot make a late pallet arrive before the water does.

Contributor: Paul Thompson / 24Ships

04.225
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.226
Can shore power pay on the Baltic’s short-sea ferry routes?
SUSTAINABILITY

Can shore power pay on the Baltic’s short-sea ferry routes?

A ferry spending most of a day at sea may still make a strong case for shore power: what matters is the amount of time it spends alongside, the load it needs there and whether both ports can supply it reliably. The Helsinki–Travemünde route offers a working example, with compatible Finnlines vessels and shore connections installed at Vuosaari and Travemünde. Yet public sources describe capability and environmental aims more readily than connection rates, energy bills or payback. The commercial test is therefore specific: measure actual use, compare delivered electricity with onboard generation, and agree how grid, terminal and vessel costs are divided before calling the investment profitable.

04.227
Cont.
24ShipsCan shore power pay on the Baltic’s short-sea ferry routes?

Can shore power pay on the Baltic’s short-sea ferry routes?

24Ships feature image.
24Ships feature image.

A shore-power cable is easy to photograph and harder to make pay. The ferry has to be compatible, the quay connection available, the arrival predictable, the electricity competitively priced and the vessel’s hotel and cargo systems able to take supply without disrupting the call. On a short-sea route with frequent port visits, the repeated hours alongside can add up to a substantial opportunity. But the cable only delivers value when it is used.

The Helsinki–Travemünde service gives the Baltic a practical case to examine. The Port of Helsinki says its first onshore power connection at Vuosaari Harbour entered use in 2024. It serves Finnlines’ ro-pax vessels Finnmaid, Finnstar and Finnlady on the cargo and passenger route to Travemünde. The Helsinki system was completed towards the end of 2023, and a similar system in Travemünde was completed early in 2024.

A ship on this route can therefore connect at both ends rather than reaching a shore-power port and then returning to onboard generation at the other.

That symmetry is commercially significant. Shore power is often discussed as a port project, but it is a ship-and-port system. A compatible vessel at one end and an incompatible or unprepared quay at the other leaves only part of the route available. The port needs electrical capacity, connection equipment and staff procedures; the ship needs matching voltage and frequency arrangements, switchboard integration, protection systems, trained crew and a reliable way to handle the cable.

The timetable must leave enough time for the connection and disconnection sequence.

The basic environmental mechanism is clear. Instead of running auxiliary engines to generate electricity at berth, a ship takes power from shore. The Port of Helsinki says the arrangement can significantly reduce climate emissions in the harbour area, giving a possible range of 50 to 80 per cent. That is a port’s published estimate, not a universal result. The actual reduction depends on the electricity source, the ship’s demand, the engines displaced, the connection period and the way emissions are counted.

The phrase “can pay” needs the same precision. Payback is not a single number for a Baltic ferry. It depends on capital cost and financing; connection and energy charges; fuel price; the value assigned to avoided emissions and local pollution; maintenance; and how often the vessel connects. A port may own the shore installation while the operator pays for electricity. A public grant may reduce the port’s capital burden without changing the ship’s operating cost.

24Ships feature image.
24Ships feature image.

A business case that counts port-side benefits against ship-side expenditure will fail unless those benefits are shared through the tariff or contract.

The first calculation is energy, not emissions. An operator should measure the ship’s electrical demand at berth over representative calls, including seasonal variation. Passenger services have hotel loads, ventilation, galley equipment, lighting, pumps and cargo-related systems. In colder months, heating demand may rise; during hot periods, cooling can matter. A ro-pax vessel also has operational requirements linked to loading and turnaround.

The shore connection must meet the peak demand and power quality requirements, not just an average figure.

The comparison is between shore-supplied electricity and the fuel the ship would otherwise consume to produce the same service. The calculation needs the auxiliary engines’ specific fuel consumption at the actual load, not a nominal rated figure. Engines running lightly may operate less efficiently than at a better load point. The ship’s energy management system can show how many kilowatt-hours were used during the call and which generators were stopped.

Meter data should be aligned with fuel records, berth times and connection status to establish a credible baseline.

04.228
Cont.
24ShipsCan shore power pay on the Baltic’s short-sea ferry routes?

Can shore power pay on the Baltic’s short-sea ferry routes?

A repeatable measurement protocol should distinguish “connection available” from “connection used”. A ship may arrive at a shore-power berth but remain on its generators because the quay point is occupied, the connector is incompatible, a system is under maintenance, the schedule is too tight or the ship has a technical issue. Each failure has a different remedy. Counting all compatible calls as shore-power calls exaggerates performance and obscures the reasons for non-use.

Connection rate should be reported with a defined denominator. Is it the percentage of eligible port calls, the percentage of time at berth, the percentage of compatible vessels, or the percentage of calls where infrastructure was available? These measures answer different questions. For commercial analysis, the useful figure is the share of eligible calls that actually took shore power, supplemented by average connection duration and energy delivered.

Operators should record cancellations and partial calls, and identify whether the cause sat with the ship, port, grid or schedule.

The Helsinki example also intersects with the changing regulatory framework. Under the EU Alternative Fuels Infrastructure Regulation, qualifying TEN-T maritime ports with sufficient numbers of calls by passenger and container ships must provide shore-side electricity for a share of eligible port calls by 2030. The regulation includes thresholds and exclusions; it is not a blanket requirement for every ferry berth.

FuelEU Maritime, which began applying in 2025, requires covered passenger and container ships at berth in relevant ports to use shore power or another zero-emission technology from 2030, with wider application in ports offering shore power from 2035, subject to exceptions. Operators should verify the exact scope for each vessel and port rather than treating all Baltic ferry calls alike.

These rules improve the investment outlook by making future use more predictable for covered vessels, but they do not settle the tariff. A port can be required to provide infrastructure while a ship still compares electricity with fuel on a voyage-by-voyage basis. The price signal depends on grid charges, taxes, energy contracts and the fuel displaced. Regulation may create demand; it does not guarantee that every connection is commercially attractive at every price.

The sequence at the berth deserves closer attention than it often gets. The ship arrives, secures, establishes safe access, connects, confirms electrical parameters, transfers load and stops the relevant generators. Before sailing, it reverses the sequence and disconnects with enough time to complete checks. A high-voltage system needs trained personnel and clear responsibilities.

If a ferry’s turnaround is short, a late arrival can compress the window and make the crew reluctant to add a procedure that jeopardises departure. The design must make connection routine and predictable.

Shore-side equipment must be available when a ship arrives, not merely installed in the port. The port needs a maintenance plan, spare parts, competent technicians, a clear booking process and a way to manage faults. Cable management matters where ro-ro ramps, vehicles, passengers and terminal equipment move around the quay. Connection points must not obstruct loading or create trip and vehicle hazards.

The shore cable should be positioned and protected for the actual berth geometry, including water-level changes and the vessel’s movements alongside.

Grid capacity is the quiet constraint. A ferry berth may require several megawatts, and multiple ships can call at the same port at overlapping times. The local distribution network may need reinforcement, transformers and switching equipment. The port should understand both its peak load and the power quality requirements of the vessel. A shore installation sized only for today’s ship may limit future use; one designed around a theoretical maximum may be unnecessarily expensive.

04.229
Cont.
24ShipsCan shore power pay on the Baltic’s short-sea ferry routes?

Can shore power pay on the Baltic’s short-sea ferry routes?

The right design follows measured operating profiles and a credible fleet plan.

For a route operator, the first practical step is to build a call-by-call energy model. For each vessel, record berth duration, electrical demand, generator fuel use and likely shore-power connection time. Do this across seasons and include delays. Then compare the modeled energy cost with the fuel cost at the relevant engine load, adding maintenance and emissions effects only where they can be quantified. The model should include the possibility that the ship will not connect on some calls.

An optimistic utilisation assumption can turn a sound engineering project into a weak investment.

The second step is to agree who pays and who saves. The port has capital and maintenance costs. The shipowner may save fuel and reduce engine running hours. The terminal and local community may receive cleaner air and less noise, while the cargo customer may value lower-emission transport. A tariff that passes all fixed infrastructure costs to the vessel can discourage use even when the route-wide benefits are substantial.

Conversely, a heavily subsidised connection rate may hide a cost that will return when grant funding ends.

There are several ways to allocate costs. A per-kilowatt-hour charge aligns the bill with use, but may not recover fixed costs when utilisation is low. A connection fee can cover some operational costs but penalise short calls. A capacity reservation charge can help the port finance infrastructure, though it may be difficult for an operator to accept if the ship’s call pattern varies. Long-term route agreements can give the port predictable demand and the operator a stable price.

Whatever the structure, the contract should make availability, maintenance downtime, energy metering and fault responsibility explicit.

Electricity sourcing changes the environmental result. Shore power eliminates exhaust emissions at the ship while connected, but lifecycle greenhouse gas performance depends on the grid mix or the specific electricity contract. A port may procure renewable electricity, but the accounting method and contractual evidence need to be clear. Operators should distinguish local air-quality benefits from total greenhouse-gas reductions.

Nitrogen oxides, sulphur oxides and particulate emissions avoided at berth can be important to nearby communities even where the electricity mix still contains fossil generation.

The ship’s own technology can improve the business case. Finnlines says its newer hybrid vessels Finnsirius and Finncanopus have 5 MWh battery systems charged from shore power in port, with stored energy used for onboard systems at sea. That is a different shore-power use case from simply replacing auxiliary generation at berth: electricity is stored for later propulsion or hotel loads, and the vessel’s design makes the connection part of its energy strategy.

The Helsinki–Travemünde Star-class connection remains a useful example of conventional shore supply to ro-pax ships. Both models depend on the port interface but produce value in different parts of the operating cycle.

The battery example also shows why route-level analysis matters. A vessel with storage may draw a high charging load over a shorter port call, requiring a different grid and tariff arrangement. A conventional vessel may need steady hotel power over the entire berth period. If a port designs for one profile and receives the other, infrastructure may be underused or constrained. Port engineers need fleet information; operators need realistic commissioning and connection schedules.

04.230
Cont.
24ShipsCan shore power pay on the Baltic’s short-sea ferry routes?

Can shore power pay on the Baltic’s short-sea ferry routes?

For the crew, reliability and training decide whether the system becomes routine. Connection procedures should be incorporated into port-call checklists, with clear allocation of tasks between ship and shore. Crew should know the emergency release arrangements, interlocks, earthing and isolation steps, and communication points. A shore-power system that is used only occasionally is harder to manage safely than one integrated into standard calls.

Frequent routes have an advantage here: repetition builds competence and exposes design flaws early.

Yet frequent calls do not automatically mean high utilisation. A ship may spend only a few hours alongside; connection and transfer may consume a meaningful part of that time. Some ports have overlapping vessel calls; a cable set at one berth cannot serve another simultaneously. If two ships call at once, the operator may have to prioritise one vessel. Utilisation should therefore be assessed against the actual timetable and berth occupancy, not the theoretical number of calls in a year.

A port should calculate the number of full-load equivalent hours it expects from the equipment. Dividing annual energy delivered by rated capacity gives a straightforward utilisation measure. That should be supplemented by the share of eligible calls served. A connection used for a short fraction of each call may produce a high call-based utilisation figure but modest energy throughput. Conversely, a smaller number of long calls may deliver substantial energy.

The right metric depends on the investment question, but it should be published consistently.

There is a useful distinction between a route that is technically ready and one that is commercially mature. Helsinki and Travemünde have installed connections, and Finnlines’ named Star-class vessels can use them at both ends. That establishes route compatibility. Public material does not provide audited connection rates, average energy per call, electricity tariffs or an investment payback period.

It would be wrong to infer profitability from the existence of the infrastructure or from an estimate of emission reductions. The next phase of evidence should be operational: how often ships connect, how much power they take and what it costs to maintain the service.

A sensible pilot report would disclose those figures without turning them into marketing claims. For each vessel and port, it would report eligible calls, successful connections, energy supplied, average duration, fuel displaced, system outages and reasons for non-connection. It would state the electricity mix and emissions method. It would also distinguish costs paid by the port from those paid by the operator. That evidence would help other Baltic ports decide whether to build, extend or share capacity.

Operators should ask for the same detail before committing to a retrofit or a long-term route contract. Is the ship’s connection standard compatible with the shore system? Can the berth supply the required frequency, voltage and peak load? What is the expected connection sequence and who provides shore staff? How often is the equipment unavailable? What is the energy tariff, and does it change with peak demand? Are charges per call, per hour, per kilowatt-hour or a blend?

The answers often matter more than the headline capital cost.

The port should, in turn, ask the shipowner for a credible demand profile and a commitment level. How many calls will be made by compatible vessels? Which ships will be upgraded and when? What is the minimum expected connection time? Can calls be adjusted to avoid simultaneous peaks? Will the operator accept a long-term energy purchase or a reservation charge? These details can reduce financing uncertainty and avoid installing a cable that sits idle because the vessel programme changed.

04.231
Cont.
24ShipsCan shore power pay on the Baltic’s short-sea ferry routes?

Can shore power pay on the Baltic’s short-sea ferry routes?

The Baltic is well suited to this kind of route-based coordination. Repeated calls create predictable patterns, and short-sea operators can use the same quays many times. A fixed route gives ports and ships a chance to align equipment, procedures and tariffs. But route stability does not erase differences between ports. Grid strength, quay layout, terminal ownership and electricity prices vary. A connection designed for one vessel class may not serve another without modification.

The environmental case should also be tied to where people live and work. Auxiliary engine exhaust at berth affects terminal staff and nearby urban areas. Shore power moves generation away from the immediate quay, which can reduce local exposure and noise. For Helsinki and Travemünde, the local benefit can be material even if the lifecycle greenhouse calculation is more modest. Decision makers should report both kinds of benefit, because they are not interchangeable.

A final complication is the alternative of onboard batteries or other zero-emission technologies at berth. FuelEU recognises shore power and alternative zero-emission technologies under its berth requirements. A vessel may be able to supply hotel loads from batteries for part of a call, particularly if storage is recharged at sea or at another port. The comparison should include capital, fuel savings, battery life, charging capability and operational resilience. Shore power is a system choice, not an end in itself.

So can shore power pay on Baltic short-sea ferry routes? It can, where vessels call frequently, remain alongside long enough, have compatible systems and can buy electricity at a price that competes with onboard generation after capital and operating costs are properly allocated. The Helsinki–Travemünde example has crossed the important first threshold: equipment and compatible ships are in place at both ends. The public record still leaves the commercial arithmetic open.

The next answer will come from meters and invoices. Operators need to share connection rates, energy volumes and fuel displaced; ports need to report availability and maintenance; both need to agree a tariff that rewards real use while recovering infrastructure costs. Until those figures are visible, “payback” is a question, not a claim. The good news is that a repeated ferry route provides the right conditions to answer it with evidence rather than assumption.

Contributor: Paul Thompson / 24Ships

04.232
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.233
Rijeka’s new Far East link: what a direct Adriatic mainline call changes
OPERATIONS

Rijeka’s new Far East link: what a direct Adriatic mainline call changes

MSC’s Phoenix service puts Rijeka on a scheduled Far East rotation, calling at Trieste and Koper before Croatia’s main container gateway. The change is real, but a direct call is only the beginning of a routing decision: cargo owners still have to weigh frequency, cut-off times, feeder connections, rail capacity and the reliability of the inland leg. Rijeka is also entering a more competitive phase, with a second deep-water terminal and established rivals already tied into European distribution networks. The useful question is not whether the map looks shorter, but for which cargo, destination and service pattern the new call makes a measurable difference.

04.234
Cont.
Additional Q4 editorial graphic.
Additional Q4 editorial graphic.
04.235
Cont.
24ShipsRijeka’s new Far East link: what a direct Adriatic mainline call changes

Rijeka’s new Far East link: what a direct Adriatic mainline call changes

24Ships feature image.
24Ships feature image.

A direct service is easy to draw on a map. A box moves from Shanghai to Rijeka without a transfer at an intermediate hub, and the line looks satisfyingly straight. The harder question begins after the ship reaches the quay: does the container reach its consignee sooner, with fewer handling steps and less uncertainty, or has one kind of connection simply been exchanged for another?

That is the test facing Rijeka’s new Phoenix service. Adriatic Gate Container Terminal (AGCT) says MSC’s first Phoenix vessel, MSC Agamemnon VII, called at the terminal on 2 June 2026, establishing a scheduled link between the Far East, the eastern Mediterranean and the northern Adriatic. The published rotation runs from Busan through Ningbo, Shanghai, Shekou and Singapore to Ashdod, Haifa, Trieste, Koper and Rijeka, then back through Ashdod and Singapore to Busan.

It is a direct call within a multi-port service, not a point-to-point express route. That distinction matters when estimating transit time, weekly availability and the chance of a missed connection.

Rijeka is not starting from a blank sheet. Its Adriatic position has long offered a credible alternative for cargo serving Croatia and parts of central and south-eastern Europe. What has changed is the combination of service pattern and infrastructure. Rijeka Gateway, the new deep-water terminal, began operations in September 2025. The first phase is reported as 400 metres of quay, 20 metres of depth and capacity of 650,000 TEU a year, with expansion designed to lift that figure beyond one million.

AGCT, the older terminal, has also handled large ships: in 2025 it received CMA CGM Adonis, a 15,536-TEU vessel, on the Ocean Alliance Asia-Med service. The port’s proposition is therefore not simply “a new terminal”; it is a more substantial container gateway with multiple terminal operators and changing service options.

The two-terminal picture is important for shippers. AGCT is operated by ICTSI and serves Phoenix. Rijeka Gateway is a separate operation backed by APM Terminals and ENNA, and has entered Maersk and Hapag-Lloyd’s Gemini network. Cargo owners should check the actual terminal named on the booking, rather than assume a vessel call at Rijeka can be handled interchangeably. Gate hours, rail sidings, local operating arrangements and commercial contacts are specific to the terminal.

For a forwarder arranging a tight onward movement, that distinction belongs in the routing conversation at the start, not in the correction email after the booking is confirmed.

24Ships feature image.
24Ships feature image.

The ship’s rotation also puts Rijeka in direct comparison with Trieste and Koper. They are close together on a chart, but proximity does not make them interchangeable. Each has its own balance of ocean calls, feeder services, terminal capacity, rail routes, customs processes and inland customer base. Koper remains a major container port, with Slovenia’s statistical office reporting that containerised cargo accounted for 10 million tonnes in 2025 and that TEU traffic rose 12 per cent year on year.

Rijeka’s port statistics and terminal results should be read with care: published totals can cover different terminal scopes and cargo categories, and container throughput is not the same thing as the number of boxes available for a particular inland destination.

The right comparison is a lane-by-lane one. A cargo owner moving parts into Zagreb may see a different result from an importer serving Budapest, Belgrade or northern Italy. The relevant question is not which port is geographically nearest in a straight line, but what happens from vessel discharge to delivery. A route worksheet should start with the origin and destination pair, required arrival date, weekly volume and the cargo’s tolerance for schedule variation.

Then compare the complete service: ocean frequency; published and observed transit time; number of transhipments; terminal dwell; customs release; rail or truck departure; and the time required to recover if one leg is missed.

04.236
Cont.
24ShipsRijeka’s new Far East link: what a direct Adriatic mainline call changes

Rijeka’s new Far East link: what a direct Adriatic mainline call changes

“Direct” deserves a precise definition. In liner shipping it usually means that a vessel in the service rotation calls at the port without the container being unloaded and transferred to another ship en route. It does not mean the cargo has no intermediate port calls, nor that it travels on the same vessel for every leg after the named port. Phoenix includes several Asian and eastern Mediterranean stops.

A box loaded at Shanghai and discharged at Rijeka may stay on the same ship, but a box booked to a smaller Adriatic destination may still be transferred to a feeder or moved inland after discharge. The shipping line’s routing confirmation, not the marketing label, establishes the cargo’s actual path.

That direct call can still be valuable. Every transhipment creates a handover: a discharge from one ship, temporary storage, a connection to another service and a reloading operation. Fewer handovers can reduce exposure to missed connections and shorten the route, particularly where the alternative depends on a busy hub or a less frequent feeder. But the benefit is only as robust as the calling vessel’s schedule.

If a mainline ship arrives late, downstream rail bookings and warehouse slots can be lost just as surely as a feeder connection can be missed. Shippers should compare schedule reliability and recovery options, not only the advertised transit time.

The published Phoenix sequence provides useful evidence about network intent, but it is not a complete service-quality record. A new service’s first months are a period in which cargo owners should monitor actual performance against the booking promise. Record vessel arrival, discharge completion, customs release, gate-out, rail departure and final delivery. Separate delay at sea from delay at the terminal and delay inland.

Without that breakdown, a shipper can blame the port for a late delivery caused by a missed train, or blame the line for a container held pending documentation.

Rijeka’s inland proposition will decide how much of the ocean advantage survives. The port has rail connections into Croatia and the wider European network, and its operators and public agencies have described improved railway links as a strategic part of development. A rail connection on a map, however, is not the same thing as a reliable, commercially usable train path.

Capacity, frequency, locomotive availability, border procedures, terminal handling windows and the possibility of assembling a full train all shape the offer. For a small importer, the service may be a scheduled intermodal product with a published cut-off. For a large shipper, it may be a dedicated train or a negotiated block. The operating model should be confirmed with the forwarder and rail provider before changing a major flow.

There is also a difference between a port’s theoretical hinterland and the origin-destination pairs it serves economically. The port may be capable of handling a box bound for a landlocked market, but the route can still lose to another gateway if the rail service is infrequent or the inland leg costs more. Compare door-to-door price, not port handling charges in isolation. Include drayage, rail, transit-time buffers, storage, customs brokerage and the expected cost of exceptions.

A cheaper ocean rate can be overtaken by a longer or less predictable inland journey.

Rijeka Gateway’s entry has raised the capacity and competition stakes. Its initial quay is deep enough to accommodate very large vessels, and its 2025 opening made Rijeka part of a broader reshaping of northern Adriatic container infrastructure. But installed capacity does not guarantee throughput. A terminal needs regular vessel calls, cargo commitments, labour, equipment, landside evacuation and sufficient network density.

Four ship-to-shore cranes or a 20-metre berth are assets; they do not by themselves create a weekly connection to a consignee’s warehouse.

04.237
Cont.
24ShipsRijeka’s new Far East link: what a direct Adriatic mainline call changes

Rijeka’s new Far East link: what a direct Adriatic mainline call changes

The commercial response from established ports is equally relevant. Koper’s growth in 2025, reported by Slovenia’s official statistics, shows that the new capacity is entering a market where a neighbouring port already has scale and an established logistics base. Trieste, meanwhile, has its own strengths in rail links and access to Italian, Austrian and central European markets. Any fair comparison should use the same year and definitions.

One authority may report port-wide container tonnage, another TEU, another terminal-only throughput. A useful decision model uses each port’s official annual figures for context, then tests actual booking and delivery performance for the shipper’s own route.

The operating details around a call can be decisive. Ask what time the terminal begins accepting export containers, how early the vessel cut-off falls, whether the line uses a single or multiple documentation cut-off, and how it treats hazardous or temperature-controlled cargo. For imports, establish the process for customs release, demurrage-free time, rail booking and empty-container return.

If the cargo requires a particular reefer plug, inspection, security or handling arrangement, obtain confirmation for the terminal handling the booked service. These questions are routine, but they reveal whether a new route fits an existing supply chain or requires a new set of workarounds.

For forwarders, the risk is to sell the headline rather than the operating plan. A direct ocean call is a useful sales point, but a responsible quote should identify the scheduled vessel, expected transhipment status, planned discharge terminal, inland mode, cut-offs and the fallback if the vessel omits or delays a call. A customer whose stock policy depends on a narrow arrival window needs a realistic buffer.

An alternative routing via Koper or Trieste can remain valuable as a contingency even if Rijeka becomes the preferred route in normal conditions.

A practical trial is more informative than a wholesale conversion. Move a controlled share of a flow through Phoenix, with cargoes selected to represent typical equipment and destinations. Capture actual departure and arrival milestones over several sailings. Compare total landed cost and variability with the incumbent route. Include the cost of disruption: a late delivery of a low-value replenishment carton may be tolerable, while a delayed production component can stop a line.

The best gateway is not necessarily the one with the lowest average transit time; for some supply chains it is the one that delivers an acceptable time consistently and offers a workable alternative when it does not.

The service could also influence inventory policy. If a shipper currently protects against transhipment uncertainty by holding extra stock, a more direct connection may permit a smaller buffer—but only after the data support that change. Review performance through a complete seasonal cycle. Weather, peak demand, blank sailings, port congestion and rail capacity all affect observed reliability.

A few smooth voyages do not prove that a service has become dependable, just as one delayed call does not prove it has failed.

There are environmental and operational considerations, too. A route that shortens sea distance or avoids a feeder transfer may reduce some transport activity, but the effect depends on vessel utilisation, vessel size, inland mode and the complete route. A container moved farther by road after discharge could offset a gain at sea. A direct call is not a sustainability claim in itself.

Shippers with emissions reporting obligations should request route-specific emissions data and check the calculation boundary, allocation method and inland leg coverage before comparing options.

The most useful way to think about Rijeka’s new link is as an expansion of choice. The port now has another scheduled ocean connection and a modern deep-water terminal alongside AGCT’s established operation. Phoenix gives Rijeka a direct place in MSC’s Far East rotation. Whether that changes cargo owners’ choices depends on the details beyond the berth: service frequency, actual transit performance, terminal execution and the quality of the inland connection.

For a shipper, the first move is not to declare a new gateway. It is to identify a lane where the current routing has a clear weakness, ask for the full Phoenix itinerary and terminal details, and test the door-to-door result against Trieste and Koper using the same assumptions. If the new service removes a handover, improves schedule fit and connects to a dependable rail or road leg, Rijeka earns more cargo.

If those pieces do not line up, the ship’s appearance on a route map will remain just that: a promising line on a map.

Contributor: Paul Thompson / 24Ships

04.238
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.239
Can Mediterranean ports measure a ship’s real air emissions at berth?
TECHNICAL

Can Mediterranean ports measure a ship’s real air emissions at berth?

A plume at a quay wall is easy to see; proving which ship made it, and whether it breached a rule, is harder. Mediterranean ports are combining fixed air-quality stations, ship-movement data, emissions inventories and targeted measurements to separate vessel pollution from traffic, industry and regional background. Marseille offers a particularly instructive field study, while Barcelona has trialled airborne sensing for compliance checks. The technologies can reveal patterns and direct inspections, but they do not all measure the same thing, and a sensor reading is not automatically evidence fit for enforcement. The central engineering challenge is attribution: linking a pollutant to a vessel with defensible uncertainty.

04.240
Cont.
24ShipsCan Mediterranean ports measure a ship’s real air emissions at berth?

Can Mediterranean ports measure a ship’s real air emissions at berth?

24Ships feature image.
24Ships feature image.

The plume reaches shore before the paperwork does. At a busy berth, exhaust drifts across a terminal, mixes with road traffic and industrial emissions, then passes a monitoring station that may be serving a city-wide air-quality network. The public question is simple: what is the ship putting into the air? The technical answer depends on where the instrument sits, what it measures, how wind is behaving, and whether the observation can be tied to a particular vessel rather than the port’s whole atmosphere.

That problem is becoming more operational as ports face pressure to reduce harmful air pollution and verify compliance. The Mediterranean became a sulphur emission control area in May 2025, bringing a 0.10 per cent sulphur limit in fuel oil for ships operating in the area under MARPOL Annex VI. At berth, EU rules already require ships to use fuel with sulphur content no greater than 0.10 per cent after the applicable time alongside, subject to defined exceptions.

These are rules that can be checked through fuel documentation and inspections. Ambient monitoring answers a different question: what pollutants are present in the air around the port, and can the contribution of a specific vessel be distinguished?

The distinction between measuring ambient concentration and measuring a ship’s emissions is the first thing a port authority must make clear. A station measuring nitrogen dioxide, particulate matter or sulphur dioxide records what passes its inlet. It does not directly report the mass of pollutant emitted by a ship.

To estimate emissions, analysts need information about the source and the plume: wind direction and speed, vessel position, engine load or operating mode, stack characteristics, pollutant ratios and the way the plume disperses. A station may show a local pollution episode; it cannot, by itself, prove that one vessel caused it.

The European Environment Agency’s technical assessment of air quality around European ports makes this point indirectly through its method: it evaluates fixed monitoring data alongside port activity and other evidence to assess shipping’s contribution. Ports are not clean laboratories. They are industrial, transport and urban environments where ships, trucks, cargo equipment, power generation, road traffic and background pollution overlap.

Weather can carry a ship plume away from a sensor one hour and push it across the same sensor the next. Even where a ship is the nearest visible source, attribution requires more than proximity.

24Ships feature image.
24Ships feature image.

Marseille provides a useful example of a measurement campaign designed around that reality. A 2025 peer-reviewed study published in Atmospheric Chemistry and Physics characterised ship emissions during operations in the port. Researchers installed two measurement stations along berths and selected locations using historical wind information and preliminary observations.

Their criteria included proximity to shipping activity, limiting interference from other sources, increasing the chance of sampling downwind plumes and representing vessels accessing different parts of the port. This is careful field design, not simply placing a sensor at the water’s edge and hoping the wind cooperates.

That study also illustrates why different monitoring approaches can yield different answers. A fixed station can capture a plume continuously when the wind carries it to the instrument. It can support long-term trend analysis and link exposure to local conditions. But the sensor samples only one point in a complex air field.

A mobile platform, such as a drone or aircraft, can approach a plume or scan several vessels, but the reading is sensitive to sampling distance, flight path, wind, plume dilution and the timing of a ship’s operating mode. Remote optical systems can screen exhaust from a passing vessel, but are generally most useful for identifying likely high emitters or fuel-compliance concerns, followed by an inspection.

04.241
Cont.
24ShipsCan Mediterranean ports measure a ship’s real air emissions at berth?

Can Mediterranean ports measure a ship’s real air emissions at berth?

Barcelona has tested that targeted approach. The Port of Barcelona and Spain’s transport ministry introduced a drone-based pilot in 2024 to monitor pollutants and possible discharges from vessels within the port area. The reported scope included sulphur oxides and nitrogen dioxide, with the drone intended to monitor ships at berth, at anchor, in transit through access channels and during manoeuvres.

The concept is practical: use a mobile sensor platform to identify an apparent anomaly, then have inspectors check the vessel and its fuel records, take samples where appropriate, and proceed through the competent enforcement process. A remote reading can direct an inspection; the distinction between a screening signal and formal proof remains essential.

Ports therefore need to be precise about what “real emissions” means. Carbon dioxide is a greenhouse gas, and ship fuel consumption can support a relatively direct estimate of CO₂ emissions using fuel-specific factors. Sulphur dioxide, nitrogen oxides and particles have different source and measurement characteristics. A fuel-compliance check may focus on sulphur-related signals. A health-risk assessment may focus on particulate matter and nitrogen dioxide at a receptor location.

An inventory may estimate total emissions over a year from vessel movements, engine assumptions and fuel data. These are related but not interchangeable products.

An emissions inventory is usually built from activity data rather than direct measurement of every plume. Analysts combine AIS vessel movements, ship particulars, speed, time at sea or berth, engine power, load assumptions and emission factors. The result can be spatially and temporally detailed, but it remains a model. Its strength is coverage: a port can estimate emissions from many vessels and compare years or scenarios. Its weakness is dependence on assumptions.

Auxiliary engines may run at different loads, hotel demand varies by ship, a vessel may use shore power, and real-world maintenance affects exhaust. Missing AIS data or inaccurate ship characteristics can also introduce error.

Direct measurements answer a narrower question with greater immediacy. If a plume is captured and identified, the analyst can estimate pollutant ratios or emission factors for the sampled operating condition. A measurement campaign can compare classes of ships, evaluate a control measure or validate an inventory. But a few sampled plumes cannot represent every call. The vessels sampled may be those with favourable wind geometry or those available during a short campaign.

A valid paper must state its sample, uncertainty and operating context; a port dashboard should do the same.

The location of monitors matters at least as much as the instrument. A station placed for human exposure assessment should represent where people breathe, not necessarily sit directly beside a stack. A station intended to capture ship plumes needs visibility of relevant berths and common wind directions while avoiding major confounders. In a port with berths on both sides of a basin, one prevailing wind may place the station upwind for one group of ships and downwind for another.

Terrain, buildings, cranes and ship superstructures can change airflow. The monitoring plan should be mapped against berth layout, approach channels, road corridors and industrial stacks.

Meteorology turns measurement into attribution. Wind sensors should record direction and speed at a suitable height and at a frequency that captures plume movement. If a station uses wind data from a distant weather site, local conditions may be poorly represented. Sea breezes and land breezes can reverse direction within a day, while buildings create local turbulence. The data system needs reliable timestamps across air sensors, AIS tracks, berth records and meteorological instruments.

Even small time offsets can make the wrong vessel appear responsible when several ships are alongside.

04.242
Cont.
24ShipsCan Mediterranean ports measure a ship’s real air emissions at berth?

Can Mediterranean ports measure a ship’s real air emissions at berth?

A ship-by-ship attribution method often begins with AIS. The vessel’s position and identity can be compared with the timing of a pollutant peak and the wind direction from source to monitor. Analysts may rule out candidates whose stack is upwind or too distant. They can also consult engine and vessel data, berth assignment, shore-power status, cargo activity and port calls.

For mobile plume sensing, an instrument may pair gas concentration readings with a camera or AIS receiver to identify a vessel as the platform crosses its exhaust. Each method has failure modes: AIS may be missing or unreliable; a ship may be obscured; several exhaust plumes can overlap; a monitor may capture a distant industrial source on the same bearing.

For sulphur compliance, ship plume screening can compare sulphur dioxide with carbon dioxide in exhaust. The ratio can indicate whether fuel sulphur content is likely above a regulatory threshold. It is a useful enforcement lead, but investigators still need a documented chain from screening to inspection and any sample analysis. Fuel samples must be collected under an accepted process, sealed, recorded and analysed by a competent laboratory.

Paperwork, bunker delivery notes and logbooks provide corroborating evidence. A port should explain publicly how it escalates a suspicious reading, so an alert is not confused with a final legal finding.

The institutional chain can be complicated. Port authorities may operate environmental monitors and supply movement data, while national maritime administrations conduct vessel inspections and issue penalties. Local or regional air-quality agencies may be responsible for ambient standards and public exposure. Researchers can design campaigns and analyse data but do not automatically have enforcement powers.

A monitoring system becomes useful when responsibilities are agreed in advance: who receives an alert, who verifies vessel identity, who boards, who samples, who preserves records and who communicates the outcome.

A robust programme also needs a baseline. Without a pre-intervention record, it is hard to show whether a new shore-power connection, speed limit, fuel rule or operational change has improved local air. Baseline data should include seasons, wind conditions, different vessel types and varied port activity. A short summer campaign may capture cruise operations and sea-breeze patterns but miss winter heating demand, different winds or cargo peaks.

Repeated measurements over comparable periods help distinguish a durable trend from weather-driven variation.

Ports should be cautious about using a single pollutant as a proxy for all ship impacts. Sulphur controls can reduce SOx and particles but do not necessarily reduce nitrogen oxides or carbon dioxide. A ship that switches to compliant fuel may still emit substantial NOx. Shore power can eliminate combustion emissions from a ship’s auxiliary engines at berth when connected and used, but it shifts electricity generation emissions elsewhere in the system.

A battery-electric harbour craft, a cleaner truck fleet and a change in ship fuel affect different sources. Monitoring should match the intervention being evaluated.

The data architecture is often less visible than the sensors, but it determines whether results can be trusted. Ports need calibration schedules, maintenance logs, quality assurance, flagged periods, documented detection limits and procedures for sensor drift. A low-cost sensor network may provide useful spatial coverage, but each instrument must be compared with reference-grade equipment and corrected under local conditions. Data should preserve raw observations as well as corrected values.

If a result is challenged, the authority needs to reconstruct how the measurement was made and processed.

04.243
Cont.
24ShipsCan Mediterranean ports measure a ship’s real air emissions at berth?

Can Mediterranean ports measure a ship’s real air emissions at berth?

Transparency matters because pollution data are politically sensitive. A port that publishes only a coloured map can create false certainty. Better reporting identifies the measurement method, period, locations, pollutant, units, data completeness, meteorology and limits on source attribution. It should separate ambient air-quality results from estimated vessel emissions and from individual compliance findings. Where data are provisional or modelled, label them.

Where a vessel has been referred for inspection, do not present a suspicion as an infringement before the process concludes.

For ship operators, the monitoring trend has practical implications even when a programme is not yet tied to a penalty. Operators should ensure bunker delivery documentation is complete, fuel changeover procedures are correctly recorded, auxiliary engine maintenance is current and shore-power capability is used when available and required. A call may be subject to observation from shore or air; crew should understand that a compliance check can begin with a remote signal and move into a conventional inspection.

Good records help distinguish a genuine technical issue from an erroneous inference.

Port planners can make the information more useful by treating it as an operations tool. If monitoring finds recurring high concentrations near a particular berth under specific wind conditions, the port can test whether berth allocation, shore power, engine use, truck scheduling or equipment electrification affects exposure. The answer may be a targeted operational change rather than an expensive port-wide project.

But any before-and-after comparison must account for changes in vessel mix, cargo volume and weather.

Can Mediterranean ports measure a ship’s real air emissions at berth? They can measure concentrations, capture plumes, estimate emissions and identify vessels for further checking. What they cannot do is make attribution automatic. Each result has a measurement boundary and a level of confidence. The best systems combine fixed monitoring, vessel data, weather, inventories and targeted inspection, with clear rules about how one piece of evidence informs the next.

Marseille’s berth-side research shows the value of careful placement and atmospheric context. Barcelona’s drone pilot shows how mobile sensing can focus attention on a particular vessel. Neither turns the port atmosphere into a simple ledger. The practical gain is more modest and more useful: authorities can see patterns, test interventions and target enforcement with better evidence than occasional complaints or generic emission models alone.

A reading becomes actionable when the sensor, the ship identity, the operating context and the enforcement process line up.

Contributor: Paul Thompson / 24Ships

04.244
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.245
Inside the pilot station: how Suez Canal transits are coordinated
INSIDER

Inside the pilot station: how Suez Canal transits are coordinated

A canal passage is not a single pilot boarding and a long spell of watching the banks slide past. It is a scheduled operation built from advance booking, vessel information, convoy order, pilot changes and continuous coordination between the bridge and the Suez Canal Authority. The master remains responsible for the ship, while local pilots bring detailed knowledge of the channel and its operating rules. Current Authority procedures reveal how much is decided before the vessel reaches the entrance: arrival timing, draught, dimensions, equipment, defects and traffic conditions all shape the transit plan.

04.246
Cont.
24ShipsInside the pilot station: how Suez Canal transits are coordinated

Inside the pilot station: how Suez Canal transits are coordinated

24Ships feature image.
24Ships feature image.

The first critical handover may happen days before the pilot steps aboard. A Suez Canal transit is a carefully ordered movement through a constrained waterway, and the ship’s arrival at the entrance is only the visible end of a chain of planning that begins with the booking, the vessel particulars and the condition of its equipment. By the time the bridge team sees the pilot boat, much of the operating frame has already been set.

The Suez Canal Authority’s Rules of Navigation are the starting point for any current account of the process. The Authority permits transit to vessels that comply with the rules, and it maintains navigation circulars that amend or clarify requirements. The published circular register changes over time; a practical transit plan should use the latest rules and applicable circulars rather than rely on an old agent’s guide or a previous voyage file.

In September 2026, the Authority’s page listed a series of current circulars, including a notice extending the provisions of Periodical No. 1 of 2026 through 31 January 2027. The rulebook is therefore not a static manual.

The pre-arrival stage is administrative, technical and operational at once. Under Article 12 in the Rules, the booking notice is to reach the relevant Canal Port Office no later than four days before transit and must include particulars such as name, nationality, type, draught, length overall, beam, tonnage and deadweight. Those fields are not clerical trivia.

They help the Authority assess the vessel’s place in the traffic sequence, its suitability for the canal and any handling needs that could affect the movement of other ships.

A ship’s dimensions and condition have consequences beyond whether it technically fits. Draught affects under-keel clearance; beam and length shape passing and manoeuvring margins; propulsion and steering condition affect the vessel’s response; visibility from the bridge and the state of navigation equipment affect the bridge team’s ability to act on information. The relevant rules and forms require vessel details and certificates, with requirements varying by type and circumstance.

A correct data submission protects the ship from last-minute surprises and gives the Authority and agent time to resolve discrepancies before the convoy forms.

The word “convoy” can suggest a rigid line of ships moving as a single unit. In practice, it is a managed sequence of vessels with different sizes, speeds, handling characteristics and priorities. The Authority’s traffic plan groups ships according to criteria in its regulations. Larger or more demanding vessels may be placed differently from ordinary ships. Timing depends on arrival and readiness, and an eligible ship that misses its planned window cannot assume it will simply slot into the next gap.

24Ships feature image.
24Ships feature image.

A vessel’s position is part of the system’s capacity and safety management.

The coordination work involves several actors. The owner or operator supplies vessel information and ensures the ship is prepared. The local shipping agent handles submissions, customs and port formalities and communicates with the relevant Authority offices. The Canal Port Office and traffic services manage the movement. Pilots embark under the Authority’s arrangements and advise on the passage. Tugs and mooring craft may be assigned according to the vessel and circumstances.

On board, the master, officers and engine department prepare the ship, keep the bridge informed and maintain the machinery needed to respond. The chain is only as reliable as the information passed between these parties.

The master’s responsibility is a central point, and the Authority’s rules state it plainly. The master or a qualified representative is to be present on the bridge during transit and remains responsible for the control and management of the vessel. The pilot contributes local knowledge and advice on manoeuvring, course and canal conditions. The rules say that the pilot’s advice does not transfer responsibility from the master.

04.247
Cont.
24ShipsInside the pilot station: how Suez Canal transits are coordinated

Inside the pilot station: how Suez Canal transits are coordinated

The practical implication is that bridge and pilot must build a working exchange, not a ceremonial one. The pilot needs to know how the individual ship responds; the bridge needs to understand the local advice and translate it into orders under the ship’s command structure.

Before arrival, the bridge team should make an honest assessment of the vessel’s actual handling rather than assume that the pilot can compensate for a latent defect. The rules require the master to keep the pilot informed of individual peculiarities in handling so the pilot can give better advice. A known delay in engine response, steering limitation, thruster restriction, unusual windage or equipment failure can change the safe way to conduct a movement.

Concealing or minimising such a condition wastes the most useful moment for discussing it: before the ship is committed to the channel.

The pilot boarding itself is an operation that calls for planning. Boarding arrangements, ladder condition, lighting, communications and weather are standard bridge concerns, but canal traffic gives them a tight context: the ship has to be ready to enter when authorised, and the pilot’s arrival must fit that readiness. The bridge team should prepare the pilot ladder under applicable SOLAS and pilot-transfer standards, make the access safe, and maintain a clear lookout.

It should also have the current passage information available in a form the incoming pilot can use immediately. The person boarding needs more than a welcome and a chart screen: they need a concise picture of the ship’s status, propulsion, steering, bridge team, planned speed and any unusual constraints.

Pilot changes mean the bridge has to repeat, refine and preserve that shared picture. The Authority’s rules describe pilots being relieved at points along the canal. The published rules identify Ismailia as a pilot-relief point for certain transits between the canal entrances. That makes the passage a series of connected segments rather than one continuous episode with one local adviser. The incoming pilot needs a proper handover from the outgoing pilot and a clear briefing from the bridge team.

The watch should not assume that information shared with one pilot has automatically reached the next.

The underlying work is a balance of local knowledge and ship-specific control. A canal pilot knows the route, bends, banks, traffic arrangements and local procedures. The master and officers know the ship’s response, bridge equipment, machinery status and crew capability. The best outcome depends on combining those two forms of knowledge with precise communication. The bridge should keep the pilot informed of relevant changes and repeat back critical instructions when needed.

The pilot should understand how a recommendation will be executed on that vessel. The language of command must stay unambiguous, especially when visibility, wind, bank effects or traffic create additional demands.

The Suez route is not a uniform trench. The canal passes through different reaches, including the northern approach, the main canal, the Bitter Lakes and the southern approaches. The waterway’s dimensions, local regulations and traffic arrangements have changed as the Authority has expanded and modified the channel. In 2025, the Authority issued a circular noting completion of double-lane work in a section of the Little Bitter Lakes between kilometre 122 and 132 and updated associated charts.

That sort of notice is operationally consequential: paper charts must be current, and electronic charts must be corrected to reflect the change. A bridge team should verify that the chart system used for the passage reflects current official information rather than presume the standard electronic update cycle has captured every local notice.

04.248
Cont.
24ShipsInside the pilot station: how Suez Canal transits are coordinated

Inside the pilot station: how Suez Canal transits are coordinated

The channel’s bank effects and confined-water behaviour are central seamanship concerns. In shallow or restricted water, a ship’s movement can be affected by interaction with the bottom and banks, particularly when speed, draught and passing distance combine unfavourably. The vessel’s response to helm and engine orders may differ from open-water expectations. The bridge team should understand squat, stopping distance, steering response and the effect of speed on control.

This is not a reason to second-guess local pilot advice; it is why the master and officers must know their own vessel and monitor its response continuously.

Speed control is a traffic-control tool as much as a shiphandling choice. The canal’s rules set operating requirements and the Authority issues transit instructions. A ship cannot treat its preferred speed as an independent commercial variable once it is in the managed traffic sequence. The bridge should be ready to adjust to instructions while preserving safe control, and the engine department should maintain prompt, reliable response.

Main-engine readiness is a precondition, not an item to troubleshoot after entering a narrow reach. Steering gear, control systems, navigational aids, communication equipment and emergency arrangements all need to be checked in advance.

Communication with the Authority and between ships matters at several levels. The ship’s agent passes booking and arrival information. The bridge maintains required radio watch and responds to port and canal instructions. The pilot and master exchange the ship’s operating information and local decisions. The watch officer needs to keep the rest of the bridge team in the loop so that radar, ECDIS, visual lookout and engine control are aligned.

A simple closed-loop discipline—repeat a critical instruction, confirm it has been understood, and report execution—reduces ambiguity in a setting where several people may be speaking across different roles.

The bridge team should also have a deliberate workload plan. Canal transit compresses attention: close navigation, radio communications, traffic awareness, pilot exchange, engine readiness, chart monitoring and record keeping all compete for the same minutes. The master should allocate tasks clearly, including who monitors position, who handles radio traffic, who records key times and who maintains external lookout.

If the ship’s bridge resource management routines are strong, the presence of a pilot adds local expertise without displacing the team’s own monitoring. The pilot should be treated as an additional professional voice, not as a replacement for the ship’s navigation watch.

The technical readiness checklist should be tailored to the vessel but typically includes steering gear, main engine, generators, bow thruster if fitted, rudder indicators, telegraph and bridge control, radars, ECDIS and charts, echo sounder, communications, searchlights where applicable, anchors and emergency controls. Any defect that affects movement or navigation needs timely declaration through the agent and Authority process.

A defect can influence eligibility, pilotage planning, convoy placement or whether the vessel should proceed. A last-minute revelation is likely to create delay and commercial cost, and may compromise safety if the ship is already committed.

The documentation burden is part of the operational story. Certificates, tonnage particulars, cargo declarations and vessel-specific documents need to be current and available to the agent and relevant office. Inaccuracies between the submitted booking and onboard records can trigger a correction process at the worst time. The master should ensure that the details transmitted ashore match the actual vessel and voyage, including draught and cargo state.

If the vessel changes condition during the approach, that change should be reported rather than silently absorbed into the plan.

04.249
Cont.
24ShipsInside the pilot station: how Suez Canal transits are coordinated

Inside the pilot station: how Suez Canal transits are coordinated

The canal’s transit process also has a commercial clock. Canal dues, pilotage costs, tug or mooring services and waiting time all affect voyage economics. A missed convoy can mean more than a few hours on the anchor: it may disturb a berth window at the next port, a cargo operation or a crew change. Charter parties and voyage instructions should make clear who handles particular costs and notifications when transit is delayed.

Operators should leave realistic schedule margin around the canal rather than build a voyage plan that treats the published window as guaranteed arrival time.

Recent disruption in the Red Sea and changes to carrier routing have made the canal’s traffic and commercial significance especially visible, but those market conditions can change quickly. A magazine account written for operators should avoid treating current flow as permanent. The relevant operational principle is steady: the Authority’s actual traffic notices and current security, commercial and navigational information govern the voyage.

Ship operators should not infer future congestion or availability from a single month’s traffic pattern or a carrier’s public route announcement.

Emergency preparedness is not separate from routine coordination. The bridge team should review the ship’s response to loss of propulsion, steering problems, contact or grounding, and understand the communication route to the Authority and agent. The ship should have clear responsibilities for engine response, bridge command, emergency anchoring and notification. The canal’s confined setting makes early reporting important; the Authority needs accurate information to coordinate nearby traffic and assistance.

A culture that reports a developing problem promptly is safer than one that waits for certainty while the situation deteriorates.

A master preparing for a transit can make the operation more useful by holding a short, structured pre-arrival meeting. Confirm the current rule and circular set; booking status and expected convoy; pilot boarding arrangements; charts and updates; machinery condition; communication plan; route and speed expectations; pilot-relief points; team duties; and contingencies. Ensure the crew understands who has the con and how the master will monitor the pilot’s advice. This is not an argument about authority.

It is a practical way to ensure the bridge and pilot can work from the same understanding.

For a first-time transit, the passage plan should include more than the charted track. The ship needs a timetable, contact details, weather and visibility contingencies, navigation checkpoints, engine and steering readiness, pilot exchange protocol, and a record of key events. The plan should account for the canal’s latest notices and make clear how the team will handle an instruction that conflicts with an expected movement.

In the briefing, officers should identify the vessel-specific characteristics the pilot needs to know and agree who will communicate them.

The pilot station is often imagined as a place where a local expert joins the bridge and takes over. The Suez system is more exacting. The transit is booked and assessed in advance, the vessel is organised into an Authority-managed traffic plan, and a succession of pilots provides local knowledge at the relevant stages. The master remains responsible for the vessel, with the bridge team expected to maintain active control and communication.

The canal’s traffic coordination is not a substitute for competent ship operation; it is the framework within which that operation must work.

The most useful lesson for an operator is that preparation is visible in the handover. Current documents, an accurately described ship, working machinery, up-to-date charts and a bridge team that can give a concise, candid briefing allow the pilot and Authority to make better decisions. A vessel that arrives ready is easier to integrate into the canal’s planned movement. A vessel that arrives with unresolved defects, old chart corrections or conflicting particulars makes every subsequent decision harder.

For the bridge, the passage succeeds through disciplined attention to the small interfaces: booking to arrival, agent to Authority, pilot to master, one pilot to the next, bridge to engine room, and chart notice to actual navigation. The canal may be a single line between two seas, but the safe transit depends on a chain of precise exchanges. That is where coordination is built.

Contributor: Paul Thompson / 24Ships

04.250
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.251
The floating dry dock that gives island ferries a lifeline
24 UNUSUAL

The floating dry dock that gives island ferries a lifeline

For an island ferry, a repair berth is part of the transport system. When a vessel must leave service for underwater work, the nearest suitable dock may be a long tow or sailing away, and the cost is measured in lost crossings as well as invoices. A floating dock offers a different kind of access: the ship enters a basin that can be submerged and raised around it, bringing dry-work capability to a working harbour. Its limits are equally important. Lift capacity, dimensions, weather, class requirements, skilled labour and parts supply determine what can be done afloat and whether a repair can genuinely return a ferry to service.

04.252
Cont.
24ShipsThe floating dry dock that gives island ferries a lifeline

The floating dry dock that gives island ferries a lifeline

24Ships feature image.
24Ships feature image.

A ferry can be out of service before anyone has decided where to repair it. A defect below the waterline, a propeller problem or a scheduled survey may demand a dry inspection, but the vessel belongs to a timetable that cannot simply pause. On an island route, the repair question quickly becomes a transport question: how long can the community manage with the remaining ships, what relief capacity exists, and where is the nearest dock with the right dimensions and lifting capacity?

A floating dry dock offers one answer, though not a universal one. It is a vessel-like structure with buoyancy chambers. The dock is submerged to admit the ship, the vessel is positioned over blocks, and the dock is deballasted so that the ship rises clear of the water. Workers can then inspect and repair the hull, appendages, sea chests, propellers and other underwater components.

Unlike a fixed dry dock, a floating unit can be positioned in a suitable harbour and can potentially be relocated, though such a move is itself a major marine operation. It brings dry access to a port; it does not turn every island quay into a full-service shipyard.

The distinction is particularly useful in Greece, where passenger services link a large archipelago and mainland ports, while the major ship repair facilities are concentrated in specific locations. The ship repair area at Perama, near Piraeus, contains several floating docks as well as permanent docks. Hellenic Shipbuilding Industry, working with Piraeus Port Authority, lists three floating facilities: Piraeus I, Piraeus II and Piraeus III, with capacities and dimensions that suit different vessel classes.

The largest listed dock is 240 metres long, 35 metres internal width and has a lifting capacity of 22,000 tonnes. These are not small craft facilities; they illustrate the scale at which a floating dock can support substantial commercial tonnage.

The important editorial caution is that public evidence does not establish one named Greek island ferry being repaired in a particular floating dock as a “lifeline” case study. The operating lessons can be examined through the real repair infrastructure and ferry maintenance requirements, but a vessel-by-vessel narrative would need records from the ferry operator, class society or yard.

What is clear from the technical and port information is how a floating dock changes access to repair and what an operator has to establish before relying on one.

24Ships feature image.
24Ships feature image.

Start with the defect. A report that a ferry is leaking, vibrating or showing abnormal temperature is not yet a repair scope. The master and chief engineer need to establish the symptom, its severity, when it appears, whether it is worsening and whether the vessel can continue safely. A vibration that changes with shaft speed may point towards propeller or shafting issues; a rise in bilge water may require immediate investigation; a coating failure may be a planned maintenance item.

The operator should gather alarm histories, vibration readings, photographs, oil analysis, underwater inspection results and maintenance records. The quality of this diagnosis determines whether a short docking will suffice or whether the ferry needs a longer yard period.

For a scheduled docking, the case is clearer but no less demanding. Statutory survey, class requirements, hull cleaning, coating renewal, propeller inspection, sea-valve overhaul and machinery maintenance compete for the same access window. The operator should assemble survey recommendations, defect lists, drawings, equipment manuals and a proposed work scope before the vessel approaches the dock.

A floating dock’s capacity may be sufficient, but that does not mean it can provide every workshop, crane, specialist contractor or material the job will require. Dock capacity and yard capability are separate questions.

04.253
Cont.
24ShipsThe floating dry dock that gives island ferries a lifeline

The floating dry dock that gives island ferries a lifeline

The first screening is physical compatibility. The yard needs the vessel’s length overall, beam, docking displacement, draught, keel profile, hull form and docking plan. The dock’s internal dimensions and lifting capacity must be checked against the vessel’s actual condition, not merely its registry particulars. The blocking arrangement must support the ship without damaging hull structure, stabilisers, sonar domes, thrusters or other projections. The vessel’s loading condition affects the lift.

If the ferry arrives with residual fuel, stores, water or cargo, those weights and their distribution matter. A ferry with an unusual appendage or damage near a docking block position can require a revised docking plan and approval.

A floating dock has operating limits shaped by stability and weather. It needs adequate water depth to submerge, suitable moorings, enough sheltered water to conduct the operation safely and enough room for the vessel to enter and align. Wind, swell and current can restrict a lift or delay the vessel’s approach. A harbour with a dock cannot necessarily accept the operation in all conditions.

Before committing the ferry, the operator and yard should agree who controls movement, which tug or line-handling assistance is required, what weather limits apply and what contingency exists if the lift cannot proceed as planned.

The docking plan is one of the most important documents in the transaction. It shows the positions of blocks and supports, the vessel’s keel and hull geometry, and any special requirements to protect appendages. The plan must be understood by the yard, dock master, vessel’s technical team and class representative. If drawings are out of date because the hull has been modified, the plan can create an unsafe or costly surprise.

Operators should verify that the dock’s team has a current general arrangement, lines plan and docking plan, and should identify any equipment that must be removed or retracted before docking.

Once the ship is safely on blocks, scope discipline determines whether the dock period stays useful. A ferry operator should rank jobs by safety, statutory or class urgency, operational impact and opportunity cost. Planned tasks such as coating renewal may be combined with underwater repairs, but only if the extra work can be completed without pushing the return date beyond the route’s tolerable interruption.

The temptation to add every visible defect once the hull is dry is understandable; it can turn a controlled docking into a prolonged outage. A change-control process should record additional work, parts availability, labour requirements and revised completion time before the operator approves it.

For a defect-driven docking, the diagnosis and parts plan are tightly linked. A propeller may need specialist balancing or replacement; a shaft may require measurement and alignment; a sea chest may need extensive steel work; a stabiliser or bow thruster can require a specialist technician and specific lifting arrangements. If components must be sent away for machining, a dock close to an island route may not shorten the repair.

The operator should identify critical-path parts in advance, confirm who will source them, and check customs, transport and delivery timing. A floating dock can place the hull above water; it cannot manufacture a replacement shaft or create a qualified service engineer on demand.

Class and statutory oversight need to be integrated into the repair plan. The operator should identify which work requires surveyor attendance, which tests need witnessing and what evidence will close out recommendations. Underwater hull repairs, structural changes and machinery alterations can require drawings, procedures, material certificates and test records.

04.254
Cont.
24ShipsThe floating dry dock that gives island ferries a lifeline

The floating dry dock that gives island ferries a lifeline

If the ferry is to return to passenger service, the operator must also complete safety checks, crew familiarisation where equipment has changed and any regulatory notifications. A repair is not finished because the steel has been welded or the coating has dried; it is finished when the required inspection and operational evidence are complete.

The practical benefit of a floating dock lies in reducing the distance between the vessel’s route and its repair access. For island fleets, distance affects everything: deadheading, fuel, crew scheduling, berth availability and the time the ferry is absent from service. A dock located within a region can reduce the voyage to and from repair compared with sending a ship to a distant yard. But the savings must be weighed against the yard’s labour availability, specialist capability and schedule.

A nearby dock with a long queue may be less useful than a farther facility with a confirmed slot and a complete supply chain.

There is an important difference between dock availability and ferry resilience. A route’s resilience comes from the number of serviceable vessels, spare capacity, relief arrangements, maintenance planning, dock access and the ability to respond to failures. If one ferry is removed from a two-vessel route, the remaining ship may operate a reduced timetable or longer turnarounds. If the route has only one vessel, the operator may need a substitute ship, a temporary schedule, or a passenger and cargo contingency.

The island community feels the consequences of the maintenance decision; the operator has to plan service continuity alongside the engineering work.

A robust maintenance strategy therefore avoids treating dry-docking as an emergency purchase. The operator should maintain a rolling docking plan tied to class cycles, statutory surveys and known equipment life. Identify which vessels can use which docks, which are constrained by dimensions or appendages, and which yards have approved capability for the likely work. Reserve a slot early enough to obtain parts and survey attendance. Build time for hull preparation, coating cure, inspection and trials.

The date a ship is lifted is not the date it is ready to sail.

The time alongside in a floating dock can be more productive if long-lead tasks are prepared while the ferry is still trading. Coating systems, steel renewals, valve spares, shaft seals and machinery kits can be ordered against the proposed scope. The yard can pre-fabricate pipe sections or steel inserts from verified measurements. The vessel’s technical team can prepare permits, isolation plans and risk assessments. Contractors can schedule specialists around the planned work.

Every task that is made ready before docking protects the limited time when the hull is accessible.

There are also environmental controls to consider. Hull cleaning and coating work can generate debris, paint particles and contaminated wash water. The yard should have procedures for containment and waste handling, and the operator should confirm the coating system and surface preparation method are appropriate for the vessel and the environmental rules in force. Repairs involving fuel, sewage or ballast systems require containment and monitoring.

A floating dock does not eliminate environmental risk because it is afloat; it concentrates work over water, so the worksite’s controls matter.

Operators often focus on the quoted dock price, but total cost includes the tug and transit, pilotage or port charges, berth services, labour, materials, survey, accommodation, lost revenue and substitute-service arrangements. A closer dock can save passage time while charging more for a specialist job. A less expensive yard can create more cost if it lacks the right contractor or parts logistics. The comparison should use a repair plan and schedule, not just a dock-rate sheet.

04.255
Cont.
24ShipsThe floating dry dock that gives island ferries a lifeline

The floating dry dock that gives island ferries a lifeline

Before confirming a floating-dock slot, a ferry operator should ask practical questions. What are the limits on length, beam, displacement, draught and keel shape? Is the dock available for the full required period or only for the lift? What repair shops and equipment are on site? Which contractors can attend, and which need to travel? How are parts and waste handled? What weather limits govern docking and undocking? Which class and flag inspections can be supported?

What is the plan if the ferry arrives with a defect different from the one reported? These questions expose gaps while there is still time to change the plan.

The dock itself needs maintenance and certification. The operator should confirm that the facility’s structure, ballast systems, pumps, moorings and safety arrangements are maintained under the applicable requirements. The dock master should be able to provide the operating limits and lift procedure. The ferry’s team should understand the emergency arrangements during the lift and the responsibilities of the dock crew.

As with any complex interface, a joint pre-docking meeting is valuable: review the plan, walk through the sequence, confirm communications and agree stop-work authority if conditions depart from the safe envelope.

Trials after undocking matter. The vessel should complete checks of sea valves, propeller and shafting, steering, thrusters, machinery, alarms and any repaired systems. A sea trial may be needed to verify vibration, temperature, speed or handling. Defects discovered during trials can affect the planned return to service, so the schedule should leave room for them.

The master and chief engineer should receive a clear handover, including the work completed, outstanding recommendations, test results, new settings and operating restrictions. Maintenance history needs to capture the repair in a form that supports future diagnosis.

The central lesson is that a floating dry dock is a tool for access, not an answer by itself. It can bring a ferry’s underwater structure within reach of inspection and repair, and the region’s repair infrastructure includes docks large enough to handle substantial commercial vessels. The usefulness for island transport depends on compatibility, location, skilled labour, spares, weather and how well the repair is prepared.

For ferry operators, the best time to solve the docking problem is before a defect appears. Map each vessel to suitable facilities, keep its technical particulars and docking plan current, reserve capacity for scheduled work and establish a contingency for an unplanned outage. When a repair is needed, define the scope, line up class oversight and secure critical parts before the vessel leaves its route. A dock can lift a ferry out of the sea. Only planning can get it back into service on time.

Contributor: Paul Thompson / 24Ships

04.256
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.257
Algerian seagrass and ship anchoring: making Posidonia protection operational
SUSTAINABILITY

Algerian seagrass and ship anchoring: making Posidonia protection operational

Posidonia oceanica is not a decorative patch of green on a chart. Its slow-growing meadows stabilise seabeds and support coastal ecosystems, yet anchoring can tear shoots and leave damage that persists long after a vessel has sailed. Algeria’s western and central coasts are gaining research attention, but public mapping and management information remain uneven. That makes protection an operational task as much as a conservation policy: masters need credible no-anchor areas and alternatives, ports need usable seabed data, and authorities need ways to manage waiting vessels without shifting pressure to another sensitive patch.

04.258
Cont.
24ShipsAlgerian seagrass and ship anchoring: making Posidonia protection operational

Algerian seagrass and ship anchoring: making Posidonia protection operational

24Ships feature image.
24Ships feature image.

An anchor is designed to bite. In a seagrass meadow, that same quality makes it a blunt instrument. The anchor descends, cuts through leaves and rhizomes, settles into the seabed, then drags or tears as the vessel swings or retrieves it. A single manoeuvre can leave a scar; repeated anchoring can fragment a meadow and make recovery difficult. For masters and port planners, the practical question is not whether Posidonia oceanica is valuable.

It is how to keep a vessel off the habitat when the chart, the weather and the waiting plan all demand a safe place to stop.

Posidonia oceanica is an endemic Mediterranean seagrass, not a seaweed. It forms dense meadows on shallow coastal seabeds and provides habitat and nursery function for marine life, contributes to sediment stability and stores carbon in long-lived deposits. Its rhizomes grow slowly, and established meadow structure can take decades to develop. Damage is therefore not readily repaired by waiting for a new season of growth.

The loss of a patch can alter the seabed structure and expose the remaining meadow to further erosion and fragmentation.

Research has repeatedly connected anchoring pressure with damage to Posidonia. A study at Port-Cros National Park in France found that an anchoring cycle destroyed an average of 34 shoots in the experimental conditions. Later research examining heavily anchored meadows reported physical damage and changes in substrate conditions, including bare patches that were not easily recolonised.

Those results concern particular sites and methods; they should not be transferred as a universal damage figure for every ship and seabed. They do establish the mechanism: anchor deployment and retrieval can inflict direct injury, and repeated disturbance can have longer-term consequences.

The challenge in Algeria is compounded by incomplete knowledge of where the meadows lie and how healthy they are. A 2024 study of Rachgoun Island off the western Algerian coast describes Posidonia around the island and reports meadow cover between 70 and 88.32 per cent at the studied locations. It also notes that the island is protected under the Ramsar Convention and that a marine protected area was in the process of classification.

The study’s findings are important precisely because they are local: they provide field observations from a coast where the distribution and condition of seagrass has historically received less research attention than in parts of the northern Mediterranean.

24Ships feature image.
24Ships feature image.

A central Algerian coast assessment published through the National School of Marine Science and Coastal Management in 2024 examined anthropogenic pressures on Posidonia meadows, including urbanisation, industrial activity, proximity to ports, fishing, wastewater discharges and invasive species. Its approach combined visual and quantitative methods, including satellite imagery and collected data.

It points to a practical management need: habitat condition cannot be separated from the pressures around it, and anchoring is one pressure among several. A protection plan that bans anchoring but ignores wastewater, coastal construction or fishing pressure will not resolve the broader condition of the meadow.

For navigation, however, anchoring is the pressure a master can often control immediately. That control depends on information. A no-anchor rule is useful only if the prohibited area is clearly described, promulgated and available in the charts and digital systems used on the bridge. A polygon shown on a conservation brochure may not be enough for a vessel operating under time pressure.

Port authorities and hydrographic offices need to translate ecological mapping into navigationally usable boundaries, with coordinates, datum, effective date and status. Where mapping is preliminary, the chart or notice should say so rather than suggest a precision the survey does not support.

04.259
Cont.
24ShipsAlgerian seagrass and ship anchoring: making Posidonia protection operational

Algerian seagrass and ship anchoring: making Posidonia protection operational

Posidonia detection itself has technical limits. In clear water and shallow conditions, diver surveys and underwater video can establish species presence and meadow condition. Acoustic methods can map seabed type over larger areas, while satellite imagery can help identify shallow-water meadow extent where water clarity, depth and resolution permit. Each method has uncertainty. Optical methods lose visibility with depth, turbidity and surface conditions.

Acoustic classification may distinguish habitat types without identifying species confidently unless validated by ground-truth surveys. Satellite maps can confuse seagrass with other vegetation or dark substrate. A charted boundary must be understood as the best available representation, not an invisible wall with exact ecological edges.

That does not justify delay. It argues for an operational buffer where uncertainty is material, especially around known or likely habitat and in areas where anchoring pressure is recurrent. Port planners can designate anchoring areas on confirmed sand or mud, away from mapped meadows, while preserving safe depth and swing room. Where data are weak, targeted surveys can improve confidence.

The allocation should be designed for the vessels expected to wait: a single small service craft and a deep-draught tanker need different depths, holding ground and separation. A general “anchor elsewhere” instruction is inadequate if no safe alternative exists.

Commercial vessels do not anchor in the same way as recreational yachts. A large ship may need to anchor because it is waiting for a berth, sheltering from weather, awaiting instructions or adjusting its arrival time. Its anchor and chain exert greater forces, and its swing circle is larger. Tugs, bunkering craft and service vessels can also anchor or hold position in coastal waters.

The management plan should therefore be based on actual vessel types, traffic patterns and reasons for waiting, not simply assume all pressure comes from leisure boats. AIS data can help identify anchoring events and vessel size, but it will not capture every small craft or explain why a ship stopped.

AIS analysis is a useful first screen. Researchers and port authorities can compare vessel positions with seabed habitat layers and identify repeated anchoring in or near meadows. The data can reveal seasonal patterns, locations where ships regularly wait and anchor drag or swing. But AIS alone is not a complete compliance record. Smaller craft may not transmit, positions can be inaccurate or delayed, and a ship’s AIS status may not correctly describe what its anchor is doing.

A vessel may stop without anchoring or anchor outside a meadow and swing over it. For enforcement, AIS needs to be combined with patrol observation, imagery, port records and a clear rule defining the prohibited action and boundary.

The regulatory structure differs around the Mediterranean. In the European Union, the Habitats Directive protects Posidonia oceanica through designated sites and conservation obligations, while individual states and regions apply anchoring restrictions and create mooring systems. Algeria is not an EU member, so the EU directive does not itself establish an Algerian no-anchor zone. Algerian conservation designations, fisheries rules, maritime law and local port measures are the relevant instruments.

International conventions and regional Mediterranean commitments supply broader context, but the practical rule for a master is the one promulgated by the competent Algerian authority and communicated through navigational information.

This distinction matters when a vessel is close to a protected island or proposed marine protected area. A Ramsar designation recognises the importance of a wetland site; it does not automatically tell a ship where it may anchor or create an immediately enforceable prohibition for every activity. A marine protected area in process of classification is a conservation signal, but its legal boundaries, management measures and enforcement responsibilities must be confirmed.

04.260
Cont.
24ShipsAlgerian seagrass and ship anchoring: making Posidonia protection operational

Algerian seagrass and ship anchoring: making Posidonia protection operational

Port agents and operators should not treat a descriptive map as a substitute for checking notices to mariners, port instructions and current national rules.

For Algeria, the operational opportunity lies in connecting research to navigation. Field studies can identify meadow extent and condition; port authorities can overlay that information with waiting areas, approaches and anchoring records; the hydrographic service can publish boundaries; and the maritime administration can set restrictions and enforcement procedures. These are distinct roles.

A university map may be scientifically valuable, but the bridge needs an authoritative source that can be used in the passage plan. A port rule can be enforceable, but it needs adequate ecological data and a viable alternative anchorage.

Port approaches deserve special attention. Ships are often constrained by traffic separation, depth, pilot boarding grounds, turning basins and restricted visibility. A meadow near a port may overlap with the space where a vessel naturally waits for its berth or pilot. The answer cannot simply be to push the anchorage farther offshore if the new location is exposed, too deep, unsafe in prevailing weather or outside the pilotage plan.

A site assessment must examine bottom type, depth, holding power, exposure, manoeuvring room, traffic crossing and proximity to habitat. Ecological protection works when the alternative is safe enough to use.

Mooring buoys are one possible alternative in heavily used areas. A properly designed mooring can allow a vessel to remain in place without repeatedly dropping an anchor into the meadow. But installing buoys is not impact-free. Foundations can damage habitat during construction; buoy spacing must suit the vessels; mooring lines need maintenance; and the system needs a fair access and booking arrangement. A field of small-craft moorings will not accept a commercial ship.

The responsible authority should identify which vessel classes the installation serves and how users obtain a position.

For commercial waiting, the alternative may be a designated anchorage over suitable sediment, an assigned berth, a managed holding area outside habitat or an arrival-management scheme that reduces early anchoring. Just-in-time arrival can lower waiting time when ship, terminal and port coordination are reliable. It cannot be treated as a universal solution: weather, congestion, cargo readiness and security may require a ship to wait.

Port control should provide clear instructions and update vessels when the planned anchorage or berth changes, rather than rely on masters to improvise from incomplete ecological information.

A ship operator can make the risk manageable through a few disciplined steps. Before arrival, review the latest official chart and notices, identify designated anchorages and protected areas, and check the agent’s written instructions. If the vessel is waiting, confirm the authorised position and holding ground rather than selecting a convenient spot from a general chart. The bridge team should use a suitable scale, account for position uncertainty, and monitor the vessel’s swing and anchor position.

If the vessel drags or must leave the assigned area, notify port control and move according to its advice. The passage plan should include a safe alternative anchorage if the first choice is unavailable.

A company procedure should distinguish between an emergency anchoring decision and routine waiting. The master may need to anchor promptly to protect the ship or crew. Environmental rules should not discourage a safety action in an emergency, but the operator should define the notification and reporting process after the immediate danger is controlled. For routine waiting, the operator can require confirmation of the approved anchorage and a check against habitat layers.

04.261
Cont.
24ShipsAlgerian seagrass and ship anchoring: making Posidonia protection operational

Algerian seagrass and ship anchoring: making Posidonia protection operational

Voyage instructions should include current local restrictions, not rely on a generic environmental policy prepared for a different coast.

Port authorities also need a practical enforcement design. A restriction is harder to apply if boundary coordinates are ambiguous, if no alternative is designated or if the responsible authority is unclear. Enforcement tools can include patrols, AIS monitoring, vessel call records, remote sensing and inspection of anchor damage, but they should be proportionate and transparent.

The authority should publish what constitutes an infringement, how an emergency is treated, how a ship can contest an erroneous position record and what penalties apply. Clear rules improve compliance and protect the credibility of conservation measures.

Damage assessment should be planned as well. If an anchoring event occurs in a meadow, the response can include recording the vessel’s position and manoeuvre, inspecting the seabed, documenting the extent of disturbance and determining whether recovery monitoring is needed. A simple incident log containing coordinates, time, vessel particulars, weather and source evidence can support later ecological evaluation.

Where repeated incidents occur, that information should feed back into the anchorage design and charting. Enforcement without learning may punish individual cases while leaving the same operational trap in place.

The case for careful mapping is not limited to conservation organisations. For a ship operator, a reliable habitat layer reduces the risk of damage, penalties, delay and reputational harm. For a port, it protects the credibility of its environmental plan and reduces conflict between traffic management and conservation. For coastal communities, it helps preserve the ecological functions that support fisheries, water quality and shore stability. An accurate charted restriction is a piece of operating infrastructure.

Algeria’s research base is growing, but the sources available publicly still point to gaps in distribution and consistent monitoring. The Rachgoun work offers a local picture of a meadow with substantial cover and a conservation context; the central coast assessment demonstrates a method for assessing multiple pressures. Those findings should inform surveys and management, not be stretched into a claim that the entire Algerian coast is mapped or protected.

Ports and authorities need a phased programme: map high-use approaches and anchorages first, then expand coverage to sites with ecological significance and known vessel pressure.

That programme should be updated. Seagrass boundaries can shift with coastal works, storms, water quality and other disturbances. A chart layer from several years ago may remain useful, but management should know its survey date and confidence. New port infrastructure, dredging, anchorages or changes in traffic should trigger a review. If a port plans a new waiting area, habitat mapping belongs early in the design process, before the engineering footprint and operating pattern are fixed.

The answer to making Posidonia protection operational is not a slogan asking ships to avoid seagrass. It is a usable chain of information and decisions: locate the habitat; define legally meaningful boundaries; publish them in navigational products; designate safe alternatives; instruct vessels clearly; observe anchoring behaviour; and investigate damage in a way that improves management.

In a region where the meadow distribution is still being documented, uncertainty should be shown honestly and addressed through survey and sensible buffers.

For the master, the immediate rule is straightforward: use the authority’s current anchorage instructions, check the chart and notices, and do not let routine waiting drift into an unauthorised location. For the port, the obligation is harder: provide a safe place to wait and make the protected seabed visible in the systems ships actually use. The anchor can be lifted in minutes. A damaged meadow may take far longer to recover.

Contributor: Paul Thompson / 24Ships

04.262
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.263
Mississippi low water, Gulf cargo: the dispatch choices behind a barge delay
OPERATIONS

Mississippi low water, Gulf cargo: the dispatch choices behind a barge delay

When the lower Mississippi loses depth, the first visible sign may be a reduced tow or a delayed sailing. The commercial consequences start earlier, in the decisions made between river gauges, soundings, fleeting areas and customer schedules. The Army Corps’ response to the prolonged 2022–24 low-water episode shows why a single “river level” cannot tell a dispatcher what to do: controlling depth varies by reach, dredging takes time to position, and a barge’s safe load depends on more than its nominal draft. This feature follows the chain of choices that can turn a shoal into a queue at Gulf terminals, and offers a practical way to plan for the next low-water notice.

04.264
Cont.
Additional Q4 editorial graphic.
Additional Q4 editorial graphic.
04.265
Cont.
24ShipsMississippi low water, Gulf cargo: the dispatch choices behind a barge delay

Mississippi low water, Gulf cargo: the dispatch choices behind a barge delay

24Ships feature image.
24Ships feature image.

A barge delay on the Mississippi rarely begins at the dock where a customer notices it. It begins upstream, in the gap between the depth a dispatcher expected and the depth that a survey, a gauge or a notice says is available now. By the time a tow is visibly waiting below a shoal, decisions about load, configuration, fleeting and cargo timing have already been made — or missed.

That distinction matters because low water is not a single event with a single response. A river can be low in one reach and navigable in another; a channel can have an adequate nominal depth but a narrow, awkwardly placed controlling section; and a dredge can be working while the usable channel remains constrained. Dispatchers are not simply asking whether a tow can pass. They are deciding what combination of barges, draft, route, timing and downstream capacity offers the least damaging answer.

The prolonged low-water episode that began in 2022 provides a useful public record. In February 2024, the US Army Corps of Engineers’ Mississippi Valley Division announced that the drought that had affected the basin since September 2022 was over. The Corps said there had been no draft restrictions on the Mississippi for three weeks and that its low-water dredges had completed work, while remaining on short notice in case they were needed again.

The wording is revealing: the end of a restriction is a condition on a particular stretch at a particular time, not proof that the system has become immune to shoaling.

For dispatch, the working map has several layers. Gauge height is the broadest. It indicates the river’s stage at a measuring point, but it does not directly state the depth over every bar or tell a captain how much water is under a particular tow. Hydrographic surveys give a more local view of the channel bed. Coast Guard and Corps navigation notices translate hazards and work into instructions for mariners.

The vessel’s draft, the tow’s width and length, river current, visibility, bend geometry and traffic all affect whether a passage is prudent.

A notice can therefore matter more than a headline about “record low water”. The relevant details are often a mile marker, a reach, a surveyed controlling depth, a requested draft reduction, a width limitation or an instruction to contact a lock or vessel traffic service before proceeding. A dispatch office that records only the headline has lost the information needed to make a movement decision.

24Ships feature image.
24Ships feature image.

The Corps’ low-water work is an operational intervention, not a tap that can be turned on instantly. Surveying identifies where the channel has become problematic; dredging then has to be mobilised, work planned and spoil managed under local conditions. The 2024 Corps release named the dredges Potter, Hurley and Jadwin as having completed work and remaining on 72-hour response.

That is a reminder of the logistics behind the response: a dredge fleet is positioned and deployed across a large river system, and the window between identifying a restriction and restoring a preferred channel can still be commercially consequential.

A dispatcher has to decide what to do in that interval. The most obvious lever is draft. Take cargo off, load less deeply or split the tow, and the vessel may gain clearance. But lightening cargo is not a free adjustment. It requires a place to transfer or store it, labour and equipment, paperwork, and a second movement to recover the intended load.

If cargo is already committed to a particular Gulf terminal or an export slot, a lighter barge may preserve the sailing while creating a second problem at the receiving end.

Tow configuration is the next lever. A wide tow presents a different problem from a deep tow. Depending on the restriction, the answer may be fewer barges across, fewer in length, or a smaller formation that can manoeuvre within a narrow channel.

04.266
Cont.
24ShipsMississippi low water, Gulf cargo: the dispatch choices behind a barge delay

Mississippi low water, Gulf cargo: the dispatch choices behind a barge delay

The Corps’ 2023 navigation notice for the McClellan-Kerr Arkansas River Navigation System, near its connection to the Mississippi, illustrates how specific these constraints can become: after a survey found less than nine feet in areas beside a narrow, non-straight channel, mariners with drafts greater than seven feet were advised to wait for guidance, and tows were given limits on both width and length. That notice concerned a particular reach and should not be treated as a rule for the lower river.

Its value is as an example of how a low-water instruction can turn tow geometry into a dispatch variable.

Breaking up a tow may mean fleeting barges while one or more sections transit. Fleeting areas are the system’s pressure valves: they allow barges to be held, rearranged, assembled or handed between towboats. Yet they are finite spaces with their own traffic, labour and navigation constraints. When multiple operators seek room near a constrained reach, the delay migrates from the channel into the fleeting area.

A plan that looks sound on a chart can fail if there is no suitable place to stage the barges, if a fleeting service is congested, or if the towboat needed for the split is committed elsewhere.

The practical question is not simply “Where can we wait?” It is “Where can we wait without losing control of the next move?” A staging point should be assessed for access, current, available fleeting capacity, distance from the controlling reach, the time needed to reassemble, and whether the cargo’s onward movement depends on a particular berth or rail connection. Waiting too close to a bottleneck can make a tow part of the obstruction. Waiting too far away can consume the time saved by a later release.

Cargo planning is the third lever, and often the one that customers see last. A terminal may be able to change berth sequence or receive a different parcel first; a shipper may accept a revised loading window; an export programme may have some tolerance for a shifted arrival. Each accommodation has a limit. Grain, petroleum products, fertiliser, coal and other bulk cargoes do not all share the same storage, handling or market timetable.

A dispatcher who treats the cargo as interchangeable tonnage risks moving the delay from the river to a tank, elevator, vessel or customer’s production line.

That is why a low-water decision should be linked to downstream capacity rather than made in isolation. Before ordering a tow to split or a barge to be lightened, the office needs to know whether the intended Gulf terminal can accept the revised parcel, whether storage is available, whether the receiving vessel can wait, and whether an alternative destination is genuinely usable.

A nominally available berth is not necessarily a workable alternative if the commodity cannot be blended, the terminal lacks the right equipment, or a later customer is already committed to the same inventory.

A good dispatcher therefore works with scenarios. The first is the planned movement under the latest verified channel information. The second assumes a further reduction in controlling depth or a fresh restriction before the tow reaches the affected reach. The third asks what happens if the tow is delayed after it has already been split or lightened.

Each scenario should identify the decision point, the person authorised to call it, and the last time at which the choice can be made without creating a more expensive failure downstream.

This is not a demand for elaborate software. A disciplined operating sheet can show the barge’s loaded draft, the tow configuration, the relevant notices and surveys, the expected passage window, the nearest viable fleeting options, and the cargo commitments that constrain a change. The record should distinguish observed facts from assumptions: a survey’s reported depth is not a forecast; a gauge trend is not a soundings report; an estimated arrival time is not a guaranteed berth window.

04.267
Cont.
24ShipsMississippi low water, Gulf cargo: the dispatch choices behind a barge delay

Mississippi low water, Gulf cargo: the dispatch choices behind a barge delay

The information should also have an owner. A dispatcher needs a named person or role responsible for checking updated Coast Guard bulletins, Corps notices, vessel traffic information and relevant surveys before a movement decision. Copies should be timestamped. A restriction can be revised, a dredge can move, and a new survey can change the picture. “We checked yesterday” is not a reliable basis for sending a deep tow into a constrained reach today.

The river’s geometry makes local knowledge valuable, but experience is not a substitute for current information. The Mississippi has long bends, strong currents and changing shoals. A tow that has made a reach many times can still encounter a new controlling point. Experienced pilots and towboat crews can describe handling margins and local tendencies; formal notices and current surveys establish the available navigation information. The dispatch office needs both, and should know which question each answers.

There is also a human-factors issue in the pressure to preserve a schedule. A tow that has already lost hours, a customer asking for a firm arrival and a terminal expecting a delivery create incentives to keep moving. Yet the value of a time estimate depends on its assumptions. A plan that assumes a normal tow, normal draft and uninterrupted passage should not be relabelled “confirmed” after one of those conditions changes.

A revised estimate is useful when it exposes the uncertainty; false precision merely moves the argument to a later, more crowded point in the chain.

Operators can reduce that pressure by agreeing in advance how they will communicate a delay. The customer needs to know whether the estimate reflects a known restriction, a queue, a tow configuration change or a berth issue. Those causes have different implications. A depth constraint may improve after dredging or a rise in stage; a fleeting queue may clear with towboat availability; a berth conflict may require a separate rescheduling decision.

One generic “river delay” message hides the useful distinction and makes it harder for cargo interests to choose their own response.

The public record is particularly helpful in showing that low-water management is a partnership of authorities and commercial operators. The Corps surveys and maintains federal navigation channels, including dredging where needed. The Coast Guard communicates navigation safety information and manages traffic and safety measures in its jurisdiction. Towboat operators make vessel-level decisions, and terminals and cargo owners absorb the effects of changed arrival patterns.

No single party controls the whole chain, which is why clear hand-offs matter.

For operators planning seasonal resilience, historical episodes should be used carefully. The 2022–24 drought is evidence of how long a low-water period can persist and how dredging and restrictions can interact. It is not a template that predicts the depth, timing or location of the next event. River stages, rainfall, basin conditions and channel conditions vary.

The practical use of the record is to test whether a company’s procedures would have worked: did it know which notices mattered, could it reconfigure a tow, did it have credible staging options, and could customers accommodate a changed sequence?

The answer can be tested without waiting for another drought. Take a recent cargo movement and simulate a reduction in permissible draft or a one-barge-wide restriction at a known bottleneck. Identify which barges would be held, where they would be held, how the tow would be split and reassembled, and what alternative delivery order would be offered. Then price the consequences, including towboat time, fleeting, cargo handling and terminal rescheduling.

The exercise is valuable precisely because the cheapest solution may not be the smallest tow; it may be a modest delay that avoids a second handling operation.

The best dispatch choice is rarely the one that restores the original schedule on paper. It is the one that protects safe navigation and cargo integrity while preserving the most useful downstream options. On a low river, depth is only the first constraint. The true measure of a dispatcher’s work is how early the operation recognises that constraint, how accurately it translates it into a tow plan, and how much room it leaves the next link in the chain to respond.

Contributor: Paul Thompson / 24Ships

04.268
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.269
Cold ironing at California container terminals: testing the ship-to-shore connection
TECHNICAL

Cold ironing at California container terminals: testing the ship-to-shore connection

A shore-power cable is the visible end of a much longer engineering process. At a California container berth, a successful connection depends on the vessel’s electrical plant, the terminal’s equipment, the port’s commissioning process and a call schedule that leaves enough time for safe handling. The state’s At-Berth Regulation gives that connection commercial force, but compliance does not make every ship instantly interchangeable with every berth. Oakland’s commissioning rules and published connection records offer a practical view of what must align, where failures or delays can arise, and what ship and terminal teams should verify before a vessel arrives.

04.270
Cont.
24ShipsCold ironing at California container terminals: testing the ship-to-shore connection

Cold ironing at California container terminals: testing the ship-to-shore connection

24Ships feature image.
24Ships feature image.

The shore-power connection begins well before anyone lowers a cable towards the quay. By the time a container ship is alongside, the difficult questions should already have answers: can this vessel accept the terminal’s supply, has its equipment been commissioned for this berth, who is responsible for the connection, and how much of the port stay will be lost if something does not work as planned?

Cold ironing sounds like a simple exchange: stop running auxiliary engines and take electricity from land. Electrically, it is a high-voltage interface between two systems designed and operated by different organisations. Operationally, it is a timed job carried out beside a working ship, under cargo operations, with safety procedures and regulatory reporting attached. A ship and terminal can each have sound equipment and still fail to connect smoothly if their interfaces, procedures or schedules do not match.

California’s regulatory framework makes the issue immediate. The California Air Resources Board’s 2020 At-Berth Regulation set requirements for regulated vessel categories to use shore power or another approved emissions-control strategy while at berth. CARB reports that the revised requirements began in 2023 for container, cruise and refrigerated cargo vessels; in 2025 they took effect for tankers at Los Angeles and Long Beach and for roll-on/roll-off vessels statewide.

The rule has staged coverage and detailed applicability provisions, so operators must check the regulation and vessel-specific status rather than assume every ship at every berth has the same obligation.

For container operators, the core engineering question is compatibility. The vessel’s high-voltage shore connection has to match the shore-side system’s voltage, frequency, protection and control arrangements. International standards provide a common framework, but a standard is not the same as a completed commissioning exercise.

A ship can have shore-connection equipment installed and still need a port-specific process to demonstrate that its cable arrangement, control logic, interlocks and operating procedures work with the system it will actually use.

Voltage is one of the first checks. Shore systems serving large ships commonly operate at high voltage, and the relevant configuration can be 6.6 kilovolts or 11 kilovolts, subject to the system design and vessel equipment. Frequency is equally important. A ship’s onboard electrical system may operate at a frequency different from the shore grid. Conversion equipment may be required on the ship or on the landside installation, depending on the design.

24Ships feature image.
24Ships feature image.

The engineering team has to check what the vessel can accept and what the berth supplies, not infer compatibility from a general statement that both systems are “high voltage”.

Power demand matters too. At berth, a container ship may be running hotel loads, reefer containers, pumps, ventilation, lighting, cargo-support systems and machinery needed for safe operation. Demand varies over the call. The connection has to carry the expected load without creating an unstable transition or exceeding the designed capacity.

The ship’s electrical officers and the terminal’s shore-power technicians need to agree the load-management sequence, how load is transferred, and what conditions require an immediate return to ship generation.

The physical connection is a separate interface. The high-voltage cable must reach the vessel’s connection point, be properly handled and secured, and be routed without obstructing cargo work or exposing it to damage. On some ships, connection points are not arranged identically from one vessel to another. The terminal’s fixed or movable connection equipment must reach the ship safely, while the ship’s crew must be able to carry out the relevant connection work under its procedures.

Tide, freeboard, berth geometry and vessel position can affect the practical reach and handling of the cable.

04.271
Cont.
24ShipsCold ironing at California container terminals: testing the ship-to-shore connection

Cold ironing at California container terminals: testing the ship-to-shore connection

This is why the phrase “plug in” can understate the work. The procedure involves isolation, verification, earthing and interlocking as specified by the approved system, connection, checks, synchronisation or transfer of load, and controlled disconnection before departure. The precise sequence depends on the installation and vessel. The principle is universal: no one should treat the cable as an ordinary shore lead or improvise around a mismatch.

The high voltage involved makes procedural discipline as important as the equipment rating.

Oakland provides a useful example of the port-level layer. The Port of Oakland says that ships must be commissioned before plugging into its shore-power system at a number of its berths. The process prepares a particular vessel to connect successfully, and the port requires shipping lines to coordinate with both the terminal operator and the port when a ship is scheduled and needs commissioning. The port says only vessels commissioned by its commissioning agent can plug in at those systems.

Commissioning may have to be repeated until the vessel is approved and added to the list of commissioned ships.

That is a significant distinction for fleet planners. “Shore-power capable” describes a vessel’s equipment in general terms. “Commissioned for this port” says that the vessel has completed a local process. For a fleet making repeated calls, a one-time engineering project can support many future port stays, but ship substitutions and charter arrangements can bring an uncommissioned vessel into a rotation.

A late vessel swap can therefore create a compliance and schedule problem even when the replacement ship has shore-power hardware.

The Oakland Seaport also publishes connection information, including annual vessel connection summaries and data through the second quarter of 2026. Those records are useful because they expose the operational difference between having infrastructure and using it. The port’s 2025 summary shows a range of operator results, including calls by commissioned vessels that did not result in shore-power use or another qualifying emissions-control measure.

The numbers are not a universal measure of equipment reliability: calls can be affected by regulatory exemptions, vessel and berth conditions, or alternative control options. But they do show why ports need to track actual calls and outcomes rather than count installed plugs alone.

A vessel connection can fail or be delayed for several different reasons. Electrical incompatibility is one. A damaged or unavailable cable, an interlock fault, a protection trip, an unexpected load condition or an equipment alarm can interrupt the process. So can a planning failure: a vessel arrives without having completed commissioning, the terminal has not arranged trained personnel, or berth work leaves insufficient time to make the connection before the applicable operating deadline.

These causes need different remedies. Replacing a cable will not fix an uncompleted vessel approval; adding training will not solve an undersized supply.

The schedule is often the hidden constraint. Container terminals are built around rapid ship turnaround and tightly sequenced cargo work. The shore-power task has to fit into that sequence, with safe access to the connection point and coordination between ship and terminal. A port stay may involve arrival manoeuvres, mooring, gangway access, cargo operations, bunkering or stores, inspections and departure preparation.

There is no benefit in calling shore power a routine connection if the staffing and timing plan has not been made routine as well.

04.272
Cont.
24ShipsCold ironing at California container terminals: testing the ship-to-shore connection

Cold ironing at California container terminals: testing the ship-to-shore connection

The practical answer is to plan the connection as a work package, not an environmental add-on. Before the vessel is nominated, the line should confirm the vessel’s connection capability, the relevant voltage and frequency, whether its commissioning status is current, and what documentation the port needs. The terminal should confirm the berth equipment, shore-power crew availability, cable reach and any local operating conditions.

Both sides should agree who calls the connection sequence, who monitors the load, who reports a fault and what backup plan applies.

A useful pre-arrival checklist begins with a vessel identity that is specific enough to distinguish sister ships and retrofits. It should record the installed shore connection, last relevant tests, port approval status, the ship’s expected electrical demand and the location of the connection point. The berth record should identify the supply characteristics, connection equipment, access arrangements and the point of contact for the operating shift.

The call plan should name the intended connection window and the latest time by which an unresolved problem can be escalated.

The checklist should also include a fallback. CARB allows qualifying alternative control strategies in the regulatory framework, but their use is governed by the rule and approval requirements. A ship operator should not assume that an available alternative is automatically an acceptable substitute in every case. Equally, a safety-critical equipment fault should not be concealed by schedule pressure.

The correct response is to follow the vessel’s approved procedures, notify the relevant port and regulatory contacts as required, and document the event accurately.

Commissioning is where much of the avoidable friction can be removed. It should establish that the particular vessel and shore system can work together under controlled conditions. The process is an opportunity to check interfaces before a time-critical call, train the people who will make the connection, and record any limitations.

If a ship’s equipment is modified, if the berth system changes or if repeated faults appear, the parties should determine whether re-testing is required rather than rely on an old approval as a permanent guarantee.

There is a maintenance discipline on both sides. On the ship, high-voltage equipment, cables, connectors, interlocks and protection systems need inspection and maintenance in accordance with the manufacturer’s instructions and the vessel’s safety-management system. On the shore, the transformer, switchgear, cable-management equipment, protective systems and control equipment need planned maintenance that accounts for the intensity of berth use.

Downtime should be communicated early enough for operators to consider another berth or a compliant alternative.

Training deserves the same attention as equipment. Shore-power work crosses the boundary between ship’s crew and terminal staff. Each party needs to understand its own responsibilities and the point at which it must stop the operation. A person trained only in the ship-side installation may not understand the terminal’s isolation procedure; a terminal worker may not know how a particular vessel’s control system signals readiness.

Joint drills and clear communication protocols can close that gap without blurring accountability.

The cost model can also affect behaviour. Oakland publishes commissioning and usage charges for systems it owns, alongside a maintenance charge; rates and arrangements can differ at facilities that the port does not own or manage. The port states that its posted usage charge is $267 per hour, maintenance is $31 per hour, and initial commissioning is $3,600, before applicable taxes. Those figures are local, changeable tariff information rather than a benchmark for California as a whole.

04.273
Cont.
24ShipsCold ironing at California container terminals: testing the ship-to-shore connection

Cold ironing at California container terminals: testing the ship-to-shore connection

Their operational lesson is that connection cost, commissioning cost and maintenance recovery are distinct line items, and should be understood before a service rotation is priced.

Ports should pay attention to the distinction between system capacity and call-level reliability. A berth may have enough grid supply on paper but still experience delays if equipment access, cable handling, staff coverage or vessel scheduling is poor. Conversely, a robust procedure and a well-maintained connection can make the system predictable even though each ship requires a deliberate sequence.

The right performance measures therefore include the share of eligible calls that successfully connect, connection time, faults by type, time spent in fallback mode, and the effect on vessel turnaround.

For ship operators, the most useful lesson is to treat the berth as part of the vessel’s itinerary specification. When chartering or assigning a container ship, ask whether the planned vessel is not merely equipped but approved for the intended California port and terminal. Make shore-power status visible in the voyage and port-call planning process. Require the ship and terminal to exchange the technical information early enough for the port’s commissioning agent to act.

Keep a record of connection outcomes so the next call benefits from what the first call taught.

The cable is the final metre of a chain that includes grid supply, berth equipment, vessel design, approval, labour and timing. California’s rules create a strong reason for that chain to work, while ports such as Oakland show that local commissioning and published call data are part of the operating reality. The connection succeeds when both sides know exactly what the other is bringing to the quay — and have rehearsed what to do if the current does not flow as expected.

Contributor: Paul Thompson / 24Ships

04.274
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.275
Jones Act crewing, up close on a US coastal cargo run
INSIDER

Jones Act crewing, up close on a US coastal cargo run

A coastwise cargo run is shaped by rules written across several parts of federal law, but the crew experiences them in watches, reliefs, credential checks and the pressure to sail on time. The Jones Act governs which vessels may carry merchandise between US points; separate documentation and manning rules govern the people serving aboard. Looking closely at those distinctions prevents a common error: treating “Jones Act crew” as a single legal category. This feature follows a representative coastal voyage as an operational case study, using public law and agency guidance to show how vessel eligibility meets everyday shipboard practice, and where a particular vessel’s arrangements must be checked rather than assumed.

04.276
Cont.
24ShipsJones Act crewing, up close on a US coastal cargo run

Jones Act crewing, up close on a US coastal cargo run

24Ships feature image.
24Ships feature image.

A domestic cargo run can look deceptively simple on a chart: load at one American port, sail along the coast, discharge at another. The legal and operational picture is more layered. Before the vessel can make the movement, the cargo, route, vessel documentation, ownership and crew arrangements must fit the relevant rules. Once under way, the crew’s day is organised around watches, machinery rounds, cargo work and a schedule that leaves little room for a relief to be late.

This is a representative case study, not a report from a named ship or voyage. Public sources establish the legal framework, but they do not establish the crew list, watchbill or daily routine of any particular operator. The distinction is important: the Jones Act sets conditions for coastwise carriage of merchandise; it does not prescribe one universal watch rota or tell every company how to organise reliefs.

Those details depend on the vessel, its certificates, trade, collective agreements and the employer’s safety-management arrangements.

The Maritime Administration summarises the central coastwise rule: merchandise transported by water between points in the United States must be carried in a vessel that is US-built, US-owned and coastwise-endorsed by the Coast Guard, subject to statutory exceptions and waivers. The Coast Guard’s vessel documentation guidance explains how a coastwise endorsement and evidence of US build fit into the documentation system. These are vessel eligibility questions. They are not the same as the requirements for the crew.

Crew requirements arise under other provisions. US-flag vessels are subject to citizenship and credential rules that vary by vessel type and service. The relevant statute, 46 USC 8103, addresses citizenship and Navy Reserve requirements, with different provisions for different classes of vessels and positions.

The current statutory text includes amendments, so a shipowner or crewing department should use the law in force for the relevant date and vessel rather than rely on a simplified slogan about “all American crew”.

That nuance does not reduce the practical importance of the workforce. A coastwise operator needs qualified people available for every required position, on the right watch and with credentials appropriate to the vessel and route. A legally eligible hull cannot sail commercially if a required officer is unavailable, a licence has expired, a medical certificate is out of date or the relief has not arrived. A crewing plan must therefore join regulatory compliance to ordinary operational resilience.

24Ships feature image.
24Ships feature image.

Take a hypothetical coastal cargo ship preparing to leave a Gulf port for an East Coast discharge. Before sailing, the company’s compliance team verifies the vessel’s coastwise status and the contemplated cargo movement. Port agents coordinate the departure, cargo documents and clearance. The master and officers review the passage plan and weather, while the chief engineer’s team prepares the machinery plant for the voyage.

The crew completes departure checks, secures cargo and confirms that each watch can be stood with the personnel actually aboard.

The watchbill turns the abstract crew count into a living schedule. A deck officer on watch is responsible for navigation and lookout arrangements appropriate to conditions; engineering watchkeeping and machinery monitoring are arranged according to the vessel’s plant and operating mode. Ratings support the watch, maintenance and deck or engine-room tasks. The master retains command responsibility, but no one person can safely substitute for every role when the ship is at sea, entering port or working cargo.

04.277
Cont.
24ShipsJones Act crewing, up close on a US coastal cargo run

Jones Act crewing, up close on a US coastal cargo run

Reliefs are where a schedule becomes tangible. If a vessel operates continuous watches, the watch system must provide rest and handover while maintaining safe coverage. A crew change is not a simple swap of names. The relieving mariner needs the right credential, familiarisation and enough time to understand the equipment, standing orders, emergency duties and current voyage condition. A late arrival can disrupt a handover; a delayed flight or transport connection can turn into a sailing delay.

That is a commercial cost, but it is also a safety control: rushing familiarisation to protect a timetable defeats its purpose.

The Jones Act itself should not be credited with every feature of that working day. It does not prescribe how many watches a company runs, the length of a particular tour aboard, or how overtime and leave are arranged. Those matters may be governed by Coast Guard regulations, vessel certificates, labour agreements, company policy and the realities of the trade. A union agreement may establish relief patterns or terms for represented mariners; an employer’s crewing policy may set additional requirements.

Those arrangements can differ between an oceangoing ship, a tanker, a tug and barge unit, and a short-sea service.

The cargo run also changes character by trade. A vessel carrying petroleum products may need cargo-specific procedures, tank monitoring and terminal coordination. A container ship has cargo operations and securing routines that differ from those of a bulk carrier. A coastwise service may have a repeat port rotation, which helps crews learn terminals and route conditions, but repetition can also create complacency if familiar hazards are treated as routine.

The common thread is the need to plan watch coverage around actual work, not just distance between ports.

A domestic route can include extended sea passages and demanding approaches. The Gulf to Atlantic route, for example, may involve offshore navigation, coastal traffic, weather systems, pilotage and arrival windows. A run between ports on the Pacific coast has its own weather, distance and port-call pattern. The ship’s schedule must account for cargo readiness, berth availability, pilot and tug arrangements, and the crew’s ability to complete the work without undermining rest or safe manning.

A dispatcher’s schedule and a master’s safe passage plan are not the same document. The commercial schedule may set the intended arrival; the passage plan determines how the voyage can be made safely, with appropriate margins and contingencies. A delayed departure does not justify treating the planned arrival time as fixed. It may be possible to adjust speed, but that decision has fuel, machinery, weather and fatigue implications.

The crew should not be set up to recover every hour lost ashore through an unrealistic passage plan.

Credential management has become its own operational discipline. The Coast Guard’s National Maritime Center issues and manages Merchant Mariner Credentials, and its guidance makes clear that credentials and endorsements are tied to service and qualifications. A company preparing a crew should verify not merely that a person holds an MMC but that the endorsements and limitations match the billet. It must also track medical certification and security credential requirements that apply to the work and access involved.

A photocopy in a personnel file is not the same as a valid credential for the job assigned.

Relief planning should be built backwards from the sailing window. Start with the vessel’s required positions and the people expected aboard. Confirm the relieving mariner’s documents, travel, terminal access and handover time. Then identify a reserve option for the foreseeable disruptions: weather, transport failure, illness or a previous vessel’s delayed arrival. Small operators may have less spare capacity than large fleets, which makes forward planning more important, not less.

04.278
Cont.
24ShipsJones Act crewing, up close on a US coastal cargo run

Jones Act crewing, up close on a US coastal cargo run

When there is no immediate replacement, managers need to know early whether a port stay can be extended or whether the voyage plan must change.

There is a temptation to describe the workforce challenge as a simple shortage of mariners, but a national aggregate cannot tell a particular operator which endorsement is missing in a particular port next Tuesday.

MARAD’s workforce material and federal maritime programmes provide useful context on training and recruitment, but company-level planning needs role-specific evidence: which positions are difficult to fill, how long credential processing takes, which routes and tours retain people, and where relief travel causes repeated disruption. Those measures help distinguish a recruitment problem from a rostering or retention problem.

The distinction between officers and unlicensed crew also matters. Officers commonly need credentials that authorise them to serve in a particular capacity, with the relevant tonnage, route or operational endorsements. Unlicensed mariners need qualifications for the duties they perform, and may also need specific training. The legal framework does not make every member of the crew interchangeable.

A company that fills a vacancy with someone who is qualified in a different capacity can still leave a required function uncovered.

A shipboard handover should cover more than the position of the vessel. The relieving officer needs the current navigation picture, any equipment defects, standing orders, weather concerns, traffic conditions, port instructions and planned changes to the voyage. An engineer’s handover must explain machinery status, outstanding work and alarm or maintenance history. Ratings need to understand task allocations, safety precautions and any changes in cargo or deck condition.

These routines preserve information between individuals; they are not paperwork performed for its own sake.

The working realities are particularly visible when the ship is under pressure. A cargo operation overruns; a berth changes; a weather window narrows; a crew member becomes unwell; an arrival slot moves. Each disruption tests whether the vessel has enough qualified depth in its crew and whether the company can adapt without eroding rest, training or safety. A schedule that works only when every handover is perfectly on time is not robust.

For a charterer or cargo owner, the most useful questions are practical. Is the vessel eligible for the intended coastwise movement? Does it have the required Coast Guard documentation and endorsement? Is the operator able to crew the voyage with appropriately credentialed people and relief cover? How does it manage changes to the port rotation and crew handover? What is the contingency if a key mariner cannot join?

These questions are more informative than an unqualified assurance that the ship is “Jones Act compliant”.

For a mariner considering this work, the route and vessel type matter as much as the label. A coastal trade may offer regular domestic port calls, but the actual pattern of tours, leave, cargo work and weather depends on the service. Training and credential progression require planning; a credential is a career asset only if it matches the work an employer needs. Prospective crew should seek the relevant employer and union materials for the service rather than infer conditions from the Jones Act’s political debate.

The legal framework also has exceptions and special cases. Waivers may be available in particular circumstances under statutory authority, and other coastwise statutes apply to passengers or particular activities. Foreign-port calls do not automatically turn a movement between domestic points into unrestricted carriage; the statutes and Customs interpretations address indirect as well as direct transportation in defined circumstances.

04.279
Cont.
24ShipsJones Act crewing, up close on a US coastal cargo run

Jones Act crewing, up close on a US coastal cargo run

Operators should obtain qualified legal advice for a specific cargo route or structure. A magazine article can clarify the categories, not decide a live compliance question.

A useful internal audit can be done before the vessel leaves. Confirm the cargo movement and the vessel’s coastwise eligibility; check the current Certificate of Documentation and endorsement; verify the crew matrix against the vessel’s requirements; review credential expiration dates and medical fitness; confirm that relief travel and familiarisation are realistic; and make sure the watch schedule covers the intended voyage and port work.

The audit should be owned jointly by operations, crewing and the vessel, because each sees a different failure mode.

A coastwise run is therefore a meeting point between a national cabotage regime and a working ship. The Jones Act determines which vessels may take part in covered merchandise movements. Documentation, citizenship, credential and manning rules determine who may serve and in what capacity. The watchbill, handover and relief plan convert those formal permissions into a crew capable of carrying cargo safely to the next port. For the operator, the most useful question is not simply whether the vessel can sail.

It is whether the vessel, people and schedule still fit together when the voyage stops going to plan.

Contributor: Paul Thompson / 24Ships

04.280
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.281
The Great Lakes winter fleet that keeps cargo moving through ice
24 UNUSUAL

The Great Lakes winter fleet that keeps cargo moving through ice

The Great Lakes do not close for winter in one clean moment. Ice forms unevenly, channels narrow, and a commercial vessel’s route may depend on the work of Coast Guard cutters, shore-based coordinators and crews who know what the ship can safely do. The 2025–26 season was severe enough for the Coast Guard to describe its icebreaking operations as continuing well into spring. Rather than inventing a single shipboard account, this feature follows the documented operating system around a winter transit: how ice information becomes movement advice, what an icebreaker can and cannot accomplish, and why cargo expectations need to reflect conditions beyond the vessel’s control.

04.282
Cont.
24ShipsThe Great Lakes winter fleet that keeps cargo moving through ice

The Great Lakes winter fleet that keeps cargo moving through ice

24Ships feature image.
24Ships feature image.

The first thing winter changes on the Great Lakes is not necessarily the route. It is the margin around the route. A channel that remains open can still be bounded by ice, a harbour entrance may need attention, and a ship’s progress can depend on assistance that is not visible on the cargo schedule. In those conditions, a voyage is coordinated across the vessel, the Coast Guard and shore teams; no one party can promise that the water ahead will behave like yesterday’s.

The 2025–26 season offers a recent example. On 8 May 2026, the US Coast Guard announced the conclusion of domestic icebreaking operations in the Eastern United States and Great Lakes after what it called a severe winter season that continued well into spring in some regions. Operation Taconite, the final ongoing domestic operation, ended as ice in the western Great Lakes had nearly melted and icebreaking was no longer required to support commercial navigation.

That is a seasonal boundary recorded by the service, not a claim that all routes had been equally blocked or that every vessel experienced the same delay.

The Coast Guard’s task is to help maintain channels and harbours open to navigation in response to the reasonable demands of commerce. The service describes the heavy icebreaking capability of USCGC Mackinaw as a core part of that Great Lakes role. Mackinaw is not a commercial escort that guarantees a convoy’s arrival time. It is a multi-mission cutter whose work includes icebreaking and aids to navigation, alongside other Coast Guard functions.

Winter traffic depends on the fleet’s ability to respond to changing conditions across a very large operating area.

Ice management begins with information. The Coast Guard’s districts and cutters monitor conditions and communicate with mariners through notices and operational channels. Commercial operators assess their own vessels’ capabilities and limitations. Shore-side dispatch teams follow ice reports, expected assistance and port conditions, then revise sailing and arrival plans.

The useful question is not simply “Is there ice?” It is how thick and consolidated it is, where it lies in relation to the fairway, whether there is a lead or broken track, and whether wind or current is likely to alter conditions before the ship reaches the area.

Ice is not a uniform surface. It can be new and thin, broken into brash, consolidated into heavier fields or compressed by wind against a shore or channel edge. A track cut by an icebreaker may open a path, but broken ice can close behind it, pile against a vessel’s bow or drift into a turn. A vessel may make useful progress in one reach and lose it in another. The operating picture changes with temperature, wind, current, vessel movement and the time elapsed since the last report.

24Ships feature image.
24Ships feature image.

The ship’s design governs what assistance means. Hull form, propulsion, rudder arrangement, propeller protection, power and the vessel’s ice class or operating notation all influence how it performs. A bulk carrier designed for seasonal ice navigation is not equivalent to a vessel whose exposure to ice is limited. A loaded vessel may respond differently from a light one; speed, steering and stopping characteristics matter.

The master and company must follow the vessel’s approved limits and the information from the classification and regulatory framework applicable to that ship.

A commercial vessel should not assume that a cutter’s presence means the route is safe for any ship. Icebreakers can create or maintain a channel, break up ice and provide assistance, but the commercial vessel remains responsible for its own navigation and for deciding whether it can safely follow. The order and spacing of ships can matter. A vessel that runs too close risks collision or being caught by sudden movement; one that falls too far behind may encounter a closing track.

If a vessel cannot maintain the required movement, the convoy or traffic plan may need to change.

04.283
Cont.
24ShipsThe Great Lakes winter fleet that keeps cargo moving through ice

The Great Lakes winter fleet that keeps cargo moving through ice

The term “convoy” can suggest a fixed procession, but the practical arrangements are conditional. Assistance may be coordinated by area, need, vessel capability and traffic. Icebreaker availability is finite, and the cutter may be working elsewhere, maintaining a channel or responding to another request.

The Coast Guard’s public descriptions of its operations explain the national mission and the assets involved; they do not publish a complete account of every commercial transit or every decision taken on the bridge. Specific movement instructions are conveyed through the relevant operational channels and should be treated as current only when received.

That distinction is why this feature follows a documented winter transit as a sequence of decisions rather than attributing a fabricated voyage to a named ship. Before departure, the operator considers whether the intended sailing window still makes sense. At the vessel, the master reviews ice information alongside weather, visibility, traffic, machinery condition and the ship’s limits. The dispatcher checks whether arrival timing can flex.

The Coast Guard determines what assistance and traffic coordination are available. When those views are aligned, a transit can proceed with manageable risk; if not, waiting is itself an operational decision.

Waiting has costs. A bulk carrier may be due to load or discharge; a cargo owner may have a production or inventory plan; a terminal may have scheduled labour and equipment. Yet a delay can be cheaper than damage to a hull, propeller or steering system, or a vessel immobilised in a channel. The commercial calculation needs to include the time needed to clear a blockage, the availability of repair support and the effect on other ships.

Winter buffer is not idle time if it protects the integrity of the route and the vessel.

Hull preparation starts long before the first ice report. The vessel’s operating limits need to be understood, inspected and documented. Owners should verify that the hull, propeller, rudder, sea chests and cooling systems are suitable for the anticipated conditions and that repairs have not compromised the relevant protection. Equipment checks should include steering response, propulsion, communications, navigation sensors and the ability to manage ice-related debris.

The proper preparation depends on the vessel; generic winterising advice cannot replace its technical documentation.

The human preparation is just as specific. Bridge teams need to understand the vessel’s handling in ice and how speed and rudder use affect the hull and propulsion. Engine-room staff should know the risks of ice ingestion and the procedures for monitoring cooling and machinery. Deck crews need clear instructions for working near ice, mooring in cold conditions and responding to icing. Cold stress, reduced dexterity and fatigue can undermine otherwise sound procedures.

Appropriate clothing and safe work arrangements are part of operational readiness, not comfort extras.

A winter transit also places unusual demands on communication. The bridge needs a current picture of conditions and a reliable way to receive instructions. The dispatch office needs to know when an estimate is no longer credible. A terminal needs to understand whether a vessel is held by ice, waiting for assistance, or delayed by a separate issue such as weather or pilot availability.

These distinctions matter because a berth plan can sometimes be adjusted around a vessel’s progress, whereas ice assistance may require a different sequence entirely.

04.284
Cont.
24ShipsThe Great Lakes winter fleet that keeps cargo moving through ice

The Great Lakes winter fleet that keeps cargo moving through ice

A good arrival estimate should therefore carry its assumptions. It might be based on a known sailing time, a published ice report, and an expected assistance window; each can change. Operators should avoid turning a planning range into a promise simply because cargo interests need a date. If the route depends on icebreaker availability, the estimate should say so in operational terms. A clear explanation gives customers a chance to adjust storage, labour or onward transport before the vessel is already late.

Coordination with the Coast Guard is not a substitute for a shipboard ice plan. The Coast Guard manages its own resources and navigation support; the vessel operator manages the ship and commercial commitments. The best arrangements make responsibilities explicit. The company should know which person monitors updates, who can authorise a delayed departure, and how the master reports a change in capability or condition.

At the same time, the master needs authority to decline a transit that is beyond the vessel’s safe operating limits, even if cargo pressure is mounting.

Icebreaking also protects infrastructure and the wider waterway. Ice can threaten harbour entrances, navigation aids and structures as well as vessels. The cutter’s multi-mission role matters because conditions do not sort themselves into neat commercial and public-safety categories. The same ice field that impedes a cargo ship can complicate access for emergency response or affect infrastructure.

The Coast Guard’s account of the 2025–26 season stresses the service’s role in supporting commerce and mitigating impacts to navigation and critical infrastructure.

The season’s end is operationally useful. On 8 May, the Coast Guard said ice had nearly melted in the western Great Lakes and icebreaking for commercial navigation was no longer required. That statement helps define the transition from winter support, but it does not eliminate local conditions overnight. Operators still need to assess their routes, channels, aids and weather. Seasonal planning should treat the official end of an operation as a major signal, while preserving ordinary navigation judgement.

There are practical ways for cargo interests to build winter resilience. Start by identifying which cargoes are time-sensitive and which can be reordered. Discuss whether a terminal can receive an earlier or later vessel, and what storage is available if the ship arrives outside its slot. Make sure the shipping contract and customer communication process do not rely on a single fixed winter arrival date where the route is known to be ice-sensitive.

A realistic range is more useful than a precise forecast unsupported by the operating conditions.

For ship managers, review the vessel’s limits and maintenance status before the season, not after ice has formed. Confirm communication equipment and contacts, review ice procedures with bridge and engine teams, and ensure that shore staff know how an ice-related delay is reported. Keep records of route conditions, assistance and performance. A company can use its own history to improve estimates, but must not assume that the same date or ice pattern will recur next year.

For ports and shore teams, the challenge is to make information actionable. A report that says ice is present is less useful than one that identifies a relevant area, time and operational effect. Port planning should connect ice conditions with pilotage, tug availability, berth sequencing and cargo labour. If an icebreaker is expected to assist, the plan should identify who confirms that expectation and how the terminal will respond if it changes. Coordination reduces uncertainty even when it cannot remove the ice.

For the wider public, the winter fleet is easy to overlook because icebreaking is most visible when a cutter is photographed cutting a path. The less visible work is continuous assessment: maintaining the channel, communicating conditions, balancing competing requests and deciding where the limited fleet can make the most difference. The commercial fleet’s ability to keep moving depends on that system, but also on ships that are suited to the conditions and operators willing to adjust their schedules.

A winter voyage across the Great Lakes is not a test of bravado. It is a sequence of checks and decisions under changing conditions. The Coast Guard’s 2025–26 season shows how far into spring those operations can extend; Mackinaw and the wider icebreaking fleet provide a capability that supports commerce, not a guarantee against delay.

The prudent operator plans for ice before the first transit, listens to current information, respects the vessel’s limits and gives the cargo schedule enough room to absorb the weather. That is how a frozen channel can remain a working route.

Contributor: Paul Thompson / 24Ships

04.285
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.286
Port electrification meets the grid: what is holding back US terminal equipment?
SUSTAINABILITY

Port electrification meets the grid: what is holding back US terminal equipment?

An electric yard tractor is the easy part to photograph. The harder work sits behind the terminal fence: estimating simultaneous demand, agreeing a utility connection, fitting substations and chargers into a live cargo operation, and training people to maintain a different fleet. EPA’s Clean Ports awards make clear that equipment and infrastructure are funded as connected activities, while the programme’s rules distinguish eligible on-site work from major utility-side upgrades. This feature uses the Port of Virginia’s large deployment award and EPA guidance to show why electrification is a sequencing problem as much as a procurement one, and how terminal managers can plan the transition without interrupting cargo flow.

04.287
Cont.
24ShipsPort electrification meets the grid: what is holding back US terminal equipment?

Port electrification meets the grid: what is holding back US terminal equipment?

24Ships feature image.
24Ships feature image.

A terminal can buy an electric machine faster than it can make the power system ready for it. That is the tension behind port electrification: the equipment has a delivery date and a purchase order, while the grid connection, substation, charger layout, operating plan and workforce arrangements move through different processes. Cargo still has to flow during all of them.

The distinction is easy to miss in a photograph of a new electric yard tractor or forklift. The machine may be ready for work, but it needs a place to charge, a supply that can support the charging pattern, maintenance support and a role in the terminal’s traffic plan. If the equipment is part of a larger fleet, the site needs to know what happens when multiple vehicles return at once, when a charger fails or when a shift overruns.

Electrification is not a one-for-one purchase; it changes the operating system around the machine.

The US Environmental Protection Agency’s Clean Ports Program is a useful guide to how federal planners understand that system. The programme funds zero-emission port equipment and related infrastructure as well as planning. Eligible activities include cargo-handling equipment such as terminal tractors, forklifts, top handlers and straddle carriers, alongside charging infrastructure, battery storage and related deployment support.

The programme’s structure recognises that the vehicle and the electrical system are linked investments.

EPA awarded 51 grants totalling nearly $3 billion under the programme, covering ports in 24 states and territories. Its awards table shows the variety of projects: equipment, charging, battery storage, electrical infrastructure upgrades, shore power and planning. At the Port of Virginia, the award listing describes cargo-handling equipment and railcar movers, charging infrastructure and a battery energy storage system, with a federal award of more than $313 million.

The scale of that project makes it a useful illustration of the package required, although a grant award is not the same as completed equipment or a commissioned electrical system.

The first constraint is knowing what the terminal actually needs. Nameplate power ratings can be added together to create an alarming theoretical maximum, but a working terminal’s demand varies by equipment type, shift, cargo profile and charging method. A terminal tractor may charge during a planned break or between shifts; a reach stacker may use power differently from a forklift.

The operational team needs a load profile that reflects when equipment will draw power, how many units will be in service and what charging windows are realistic.

24Ships feature image.
24Ships feature image.

A simple fleet count is not enough. The planner should map each machine’s daily duty cycle, route, idle time, payload, shift pattern and charging opportunity. A machine operating continuously in a container yard has a different energy requirement from one assigned to a low-use or seasonal task. The duty cycle informs battery size, charger rating and the amount of spare capacity required.

It also reveals where operational changes, such as assigning equipment to shorter shifts or rotating units, may reduce peak demand without reducing throughput.

The grid connection is a separate project with a different owner. The port or terminal operator may control the equipment and on-site electrical assets, while the utility controls much of the distribution infrastructure upstream of the meter. An interconnection request prompts engineering studies, load forecasts, protection checks and agreement about who pays for what. If the existing service cannot support the new load, the solution may involve a new feeder, transformer, substation or other upgrade.

Those works have design, procurement, permitting and construction lead times that do not necessarily match an equipment grant’s schedule.

04.288
Cont.
24ShipsPort electrification meets the grid: what is holding back US terminal equipment?

Port electrification meets the grid: what is holding back US terminal equipment?

EPA’s Clean Ports guidance draws a material boundary around costs. The programme allows some minor front-of-meter work needed to connect an eligible charging station, but major grid upgrades to utility-owned distribution equipment, off-site generation, bulk transmission and utility-side transformers are generally ineligible programme expenses.

That boundary is important because it identifies a potential funding gap: a terminal may have money for vehicles and chargers but still depend on a utility project that sits outside the grant’s eligible cost structure.

This is where early utility engagement earns its keep. A port that waits until it has selected equipment before telling the utility about the load risks discovering that the feeder, transformer or substation cannot support the planned deployment. A better approach is to present a phased load forecast early, show where chargers will be placed, and discuss the likely sequence of fleet conversion.

The utility can then identify study requirements and potential upgrades while the port is still able to adjust its procurement and construction schedule.

The phrase “interconnection timeline” can hide several different clocks. There is the time to complete a load study and identify upgrades; the time to agree scope and cost responsibility; the time to obtain permits and easements; the time to procure long-lead equipment; and the time to build, test and energise. Those steps may overlap, but they should not be compressed into a single optimistic date.

A terminal manager needs to understand which milestone controls the first usable charger and which controls full fleet deployment.

The physical layout can be just as restrictive. Existing terminals are dense working sites. Stacks, lanes, rail tracks, maintenance bays, pedestrian routes, drainage, fire access and cargo equipment already occupy space. Charger locations must fit the work pattern without causing vehicles to queue across a traffic lane or forcing a driver to make a hazardous manoeuvre.

Cable management, bollards, weather exposure, emergency access and protection from container-handling activity need to be considered in the site design.

Charging strategy determines whether those chargers become a bottleneck. A depot model may work for equipment that returns to a central base; opportunity charging may suit vehicles that pause near a suitable charger during operations. High-power charging shortens dwell but can increase peak demand and require more substantial infrastructure. Lower-power charging may reduce peak load but require more machines or a longer charging window.

The right mix depends on equipment duty cycles, shift patterns and the reliability requirements of the terminal.

Battery storage can help manage peaks or provide resilience, but it is not a substitute for an adequate electrical design. EPA lists battery energy storage as an eligible technology in appropriate Clean Ports projects. A storage system can shift energy use in time, support charging during a peak or provide a buffer in a system designed for that purpose. It also adds controls, safety requirements, maintenance and replacement considerations.

The project should compare the cost and operational value of storage with the cost of additional utility capacity, not treat a battery as an automatic answer to every grid constraint.

The transition must be staged around cargo work. A terminal cannot take a whole fleet out of service to install chargers or test new operating routines. One approach is to electrify a defined part of the operation first, such as a group of terminal tractors serving a repeatable route, then expand after the energy and maintenance data are known. Another is to replace units as they reach planned renewal, provided the infrastructure arrives in time.

04.289
Cont.
24ShipsPort electrification meets the grid: what is holding back US terminal equipment?

Port electrification meets the grid: what is holding back US terminal equipment?

Either approach needs a clear sequence that accounts for old and new equipment operating together.

Running a mixed fleet creates its own complexity. Staff need to understand the different refuelling and charging routines, maintenance teams need parts and training for new components, and dispatchers need to know which machines can be assigned to which tasks. A new electric unit that is routinely held back because operators are unfamiliar with it will not deliver the intended service.

Training should be planned before delivery and include drivers, technicians, emergency responders and supervisors who allocate equipment.

Maintenance planning has to move beyond the purchase warranty. Terminals should establish responsibility for high-voltage work, isolate and lock-out procedures, battery inspection and fault response. They need agreements for vendor support and parts availability, as well as clarity about which repairs can be done in-house. A charger outage can immobilise more than one vehicle if the site has too little redundancy.

Maintenance contracts should specify response times and data access, and the operating plan should identify a fallback when a charger or machine is unavailable.

Safety is not a footnote to the electrical plan. Charging installations introduce high-voltage systems into busy industrial environments. Equipment placement must protect workers and infrastructure, and emergency plans need to address battery incidents and electrical faults. The fire service and terminal’s safety team should be involved while the design is still flexible.

Procedures for damaged equipment, isolation and access need to be understandable during a night shift as well as during a commissioning demonstration.

The project’s emissions case also requires careful accounting. Electrifying terminal equipment reduces tailpipe emissions at the point of use, but the project should document the baseline machines displaced, their fuel consumption and operating hours, and the electric fleet’s actual activity. EPA requires grantees to report implementation and activity data, and it provides guides for collecting data on equipment and infrastructure.

A grant report is not just an administrative burden: consistent data lets a port understand whether the equipment is doing the work expected and where operating patterns need adjustment.

Community and workforce planning are part of the programme’s stated scope. EPA’s Clean Ports awards include planning projects focused on emissions inventories, workforce analysis, community engagement and resiliency. Near-port communities may experience the benefits of reduced local diesel emissions, while workers experience the new equipment, charging routines and maintenance demands directly.

A deployment plan that counts machines but ignores training and local engagement may meet a procurement milestone and still struggle in daily operation.

The utility partnership is a governance issue too. EPA provides a utility partnership agreement resource for grantees, signalling that the utility’s role should be formalised. The agreement can clarify load assumptions, infrastructure responsibilities, schedule dependencies, data sharing and points of contact. It should be specific enough to survive staff turnover and changes to project sequencing.

A meeting note saying “the utility is supportive” does not establish when capacity will be available or what conditions must be met.

Port operators should make procurement conditional on infrastructure readiness. Before finalising equipment numbers and delivery windows, verify that the utility has reviewed the load forecast; identify which upgrades are required and who funds them; confirm that on-site electrical design and charger locations fit terminal operations; and schedule testing before the machines enter service.

04.290
Cont.
24ShipsPort electrification meets the grid: what is holding back US terminal equipment?

Port electrification meets the grid: what is holding back US terminal equipment?

If the grant schedule and utility schedule diverge, the project should have a documented re-sequencing option rather than leave new equipment waiting at the gate.

The operating plan should include charging during disruption. What happens if a vessel bunches the work, the terminal runs a longer shift or several machines return at once? Can charging be staggered without reducing availability? Is there enough spare equipment to cover a charger fault? Does the terminal have a process for prioritising machines when power is constrained?

These are cargo questions as much as electrical questions, because a shortage of available yard equipment can reduce the terminal’s ability to unload, stack or deliver containers.

A phased conversion can produce useful evidence before the next purchase. Measure energy use per shift, charger utilisation, time unavailable, maintenance hours, task completion and equipment availability. Compare those data with the diesel units previously assigned to equivalent work. Track peak demand as well as total consumption; a project can have a modest energy total but still create a costly demand peak if many machines charge together.

The evidence can then inform charger count, battery strategy, staffing and future utility requests.

There are risks in assuming that grants have removed the financial barrier. EPA funding can support a large part of eligible equipment and infrastructure, but local match, costs outside the programme rules, utility-side upgrades and future maintenance remain. Grant conditions also bring procurement and reporting obligations. Operators need to account for the lifetime cost of the equipment, charging, electricity tariffs, demand charges, battery replacement, maintenance and training.

The relevant comparison is a service delivered over years, not a purchase price against the sticker price of a diesel machine.

The Port of Virginia award illustrates the scale of ambition now attached to electrifying major port operations, but its details should be read as a project plan subject to implementation, not as proof that every listed machine and charger is already at work. EPA itself cautions that project details may change during implementation. That is a sensible reminder to distinguish an award announcement from a commissioned system.

The harder measures are the dates when utility capacity is energised, equipment enters service and the terminal demonstrates reliable operation under cargo load.

For terminal managers, the sequence is clear. Start with the work, model the duty cycles, and build a load forecast that reflects actual operations. Engage the utility before choosing a fleet scale. Resolve the on-site layout and safety questions while there is still room to change it. Buy equipment against a credible infrastructure schedule, train the workforce, and monitor performance after deployment. Bring community and workforce needs into planning rather than adding them once construction has begun.

Electrification succeeds when the new machine is available at the moment the cargo plan needs it. The grid connection, charger, terminal layout, technician, driver and dispatch rule all have to be ready together. The vehicle is only the visible part of that arrangement. The less visible work — interconnection, phasing and operational design — determines whether a port’s zero-emission ambition becomes a dependable shift on the quay.

Contributor: Paul Thompson / 24Ships

04.291
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.292
Fujairah’s new terminals: can the Gulf of Oman absorb diverted cargo?
OPERATIONS

Fujairah’s new terminals: can the Gulf of Oman absorb diverted cargo?

A 50-year agreement in principle gives DP World a route into two new east-coast terminals, with headline capacity large enough to change the UAE’s port map. But capacity on a press release is not the same as cargo that can reach a berth, clear the gate and find a buyer. Al Rugaylat and Dibba must work with existing Fujairah facilities, roads, labour and inland distribution, while serving different trades. The test is whether the project’s phased development can build a functioning gateway around its quays: one that can take ships reliably and move freight inland without simply shifting congestion from the water to the road.

04.293
Cont.
Additional Q4 editorial graphic.
Additional Q4 editorial graphic.
04.294
Cont.
24ShipsFujairah’s new terminals: can the Gulf of Oman absorb diverted cargo?

Fujairah’s new terminals: can the Gulf of Oman absorb diverted cargo?

24Ships feature image.
24Ships feature image.

A port expansion is easiest to picture from the water. The ship turns into a new basin, the pilot brings her alongside, cranes begin work and another line on the national capacity chart moves upwards. The harder picture starts when the ship sails: where the boxes go, which road carries them, how long a truck waits at the gate and whether the destination warehouse can accept a surge of cargo before the next vessel arrives.

That is the operational question behind DP World’s agreement in principle with Fujairah Ports Authority for two terminals on the UAE’s east coast. Announced in July 2026 as a 50-year concession, the proposal covers Al Rugaylat, a container and multipurpose terminal, and a general cargo terminal at Dibba. The Dubai Media Office says Al Rugaylat is designed for annual capacity of up to 2.5 million TEU, 1.7 million tonnes of general cargo and 190,000 car-equivalent units.

Dibba is designed for up to 3.6 million tonnes of general cargo. Those are substantial numbers. They describe a future design envelope, not cargo already handled or a construction programme already complete.

The same announcement says construction is expected to take about 24 to 30 months from commencement and that delivery will be phased. That qualification matters. The agreement is in principle, and the public announcement does not set out a detailed construction sequence, opening date, berth-by-berth specification or road capacity plan. For a shipper considering a route, those missing details are not fine print. They determine when the first useful service could start and what it can reliably carry.

Fujairah’s geography explains the attraction. The emirate’s port facilities sit on the Gulf of Oman, outside the Strait of Hormuz. A vessel calling there does not need to pass through the strait to reach the open Indian Ocean. In periods when Hormuz is disrupted, that distinction can carry real commercial weight. It does not mean every cargo normally moved through a Gulf port can simply be rerouted to the east coast.

Cargo ownership, pipeline or production location, vessel availability, terminal capability and onward transport all constrain the options. A container gateway is not a substitute for an oil export terminal, and a bulk quay does not become a container hub because the trade map changes.

The new terminals should therefore be read as additions to the UAE’s port network, not as a single emergency valve. DP World says the development will connect to Jebel Ali through its inland logistics network and integrate with Jafza, its free zone. That is a useful proposition: cargo handled on the east coast could connect to established logistics and distribution assets further west. But the announcement does not detail the route, capacity, service frequency or transfer arrangements.

24Ships feature image.
24Ships feature image.

A cargo owner will want to know whether that connection means scheduled rail or road services, a managed transfer product, or a broader commercial relationship using existing roads and depots.

The difference is practical. A port-to-free-zone link only reduces friction if it gives the customer a dependable handover. A container discharged at Al Rugaylat may need a customs status change, a truck slot, a driver, a suitable trailer and a receiving window at its destination. If any one of those parts is undersupplied, the ship has gained a new quay while the cargo has inherited a new queue.

The first operating plans should be judged by the full movement, from vessel ETA to final delivery, rather than by quay length or annual design capacity alone.

Fujairah already has an established maritime role. The existing Port of Fujairah handles general and bulk cargo as well as marine services, while Fujairah’s offshore facilities support oil and fuel trades. Dibba is not an empty shoreline waiting for a first cargo. Fujairah Ports Authority describes an operating bulk terminal there, with a 650-metre quay, two berths for vessels up to 120,000 deadweight tonnes, 17 metres of alongside depth and a 4,000-tonne-per-hour bulk loader.

04.295
Cont.
24ShipsFujairah’s new terminals: can the Gulf of Oman absorb diverted cargo?

Fujairah’s new terminals: can the Gulf of Oman absorb diverted cargo?

Its stockpile area connects to the terminal via a 4.1-kilometre enclosed conveyor. Commercial operations began in March 2024, with limestone, aggregate and clinker among its principal exports and the Indian subcontinent identified as a target market.

That existing Dibba installation offers a useful reference point. Its conveyor moves bulk material in a controlled, high-volume flow from stockpile to ship. Truck haulage remains part of the landside chain, but the final transfer to the berth does not depend on a procession of lorries running alongside the quay. By contrast, a general cargo facility may handle steel, project equipment, bagged products or other cargoes with quite different handling patterns.

Some will require mobile cranes, some ship’s gear, some specialist lifting plans and staging space. A container terminal adds a further operating system: yard stacking, quay cranes, gate appointments, equipment maintenance, reefer plugs and the management of empty boxes.

Al Rugaylat’s combined brief makes the design challenge more interesting. Containers, general cargo and vehicle units need different layouts and rhythms. Cars require marshalling areas, inspection and secure storage; container boxes need a yard organised for quick retrieval and ship sequence; breakbulk cargo often needs room to stage irregular loads. These operations compete for land as well as labour.

The capacity figures imply a large facility, but they do not reveal how much of the site will be reserved for each trade, how the terminal will separate traffic or what the initial phase will include.

For operators, the key question is not whether a terminal can handle several cargo types on paper. It is whether it can do so without one trade degrading another. A vehicle ship arriving during a container peak can absorb yard space and labour. A project cargo lift can require a clear corridor through the terminal and an engineered route beyond the gate. If work zones overlap, the apparent flexibility of a multipurpose facility can become a source of delay.

Good terminal planning begins by mapping cargo flows and equipment needs against actual land, gates, shift patterns and likely vessel calls.

The ship interface needs the same discipline. The Dubai Media Office describes the development as a deep-water gateway able to accommodate the latest generation of ultra-large container ships. That is an important claim, but vessel access is more than a headline draft. A carrier assessing a call needs published information on channel depth, turning basin, berth pocket, tidal limits, under-keel clearance policy, approach aids, tug availability and pilotage arrangements.

The port must also match berth length, fendering, bollards and crane outreach to the vessels it wants to attract. A ship may be physically able to reach a port and still be commercially unsuitable if the available cranes cannot work her efficiently or if the berth window is unreliable.

Those details also shape the economics. A deep berth and large ship can reduce the unit cost of sea transport only if there is enough cargo to fill the call and enough quay productivity to complete it on schedule. For a new gateway, early services may build gradually. A carrier will look for cargo commitments, dependable handling and a network that makes the extra call worthwhile. The port, in turn, will need to compete with established services at Jebel Ali, Khalifa Port and other regional gateways.

Its advantage may come from location, capacity, customer-specific logistics or a better fit for certain cargoes; it cannot come from capacity alone.

04.296
Cont.
24ShipsFujairah’s new terminals: can the Gulf of Oman absorb diverted cargo?

Fujairah’s new terminals: can the Gulf of Oman absorb diverted cargo?

The road network is likely to be one of the first tests visible to the surrounding community. Trucks are the adaptable part of freight transport: they can serve a new terminal quickly, change destination and move cargo without a fixed rail timetable. They are also a source of gate queues, road wear and local congestion when terminal peaks are not controlled. The public announcement links the terminals to DP World’s inland network but does not publish a dedicated access-road design or traffic forecast.

That is not evidence that roads are inadequate; it means the operational plan cannot yet be independently assessed from the published material.

A serious road plan would model more than average daily truck movements. It would test the arrival pattern around vessel discharge, the spread of gate appointments, empty-container returns, driver rest and shift changes, abnormal-load escorts and the effect of disruption on the main access routes. A terminal that clears cargo quickly during a quiet week may still fail during overlapping vessel calls or a holiday peak.

If the nearest road junction or weighbridge becomes the constraint, more quay capacity simply means more cargo accumulating behind it.

Rail is often invoked as the answer to this problem, but the right question is whether a rail service can be built and used at a competitive frequency. The public project announcement does not specify a rail connection. Without one, planning should be honest about the road share, the truck fleet required and the locations of inland depots that can absorb cargo.

If a later rail connection becomes viable, it will need a defined terminal interface: train length, loading equipment, operating windows, customs procedures and a commercial service with sufficient volume. A line on a masterplan has little value until a shipper can book space on a train that runs when the cargo is ready.

Labour is another part of the infrastructure. A large terminal requires more than crane drivers. It needs planners who understand the ship stow and yard plan, lashers, equipment technicians, gate and customs staff, safety teams, reefer specialists, tally clerks and supervisors able to coordinate several operators at once. A new site must recruit and train a workforce while establishing shift patterns, emergency procedures and maintenance routines.

Experience can be transferred from existing terminals, but a new layout, new equipment and new customer mix still require familiarisation. At Dibba, specialized bulk handling has its own skills and maintenance needs; a mixed cargo facility will add a broader range of work.

In a region where several ports compete for experienced maritime and logistics staff, workforce planning cannot be postponed until the cranes are installed. Training needs to include equipment-specific authorisation, lifting and lashing procedures, hazardous cargo rules, traffic segregation, fire response and coordination between ship, terminal and agent. The terminal’s productivity will depend on safe repeatable work, not on a theoretical maximum lift rate.

Maintenance coverage matters too: a crane that is unavailable during a tightly planned call can undo the advantage of a fast vessel turnaround.

The coastal setting imposes its own engineering questions. New quays, breakwaters, dredging and reclamation can affect sediment movement, navigation and habitat. The July announcement does not publish an environmental impact assessment or detailed marine design. Those materials will be important as the project proceeds, especially where construction requires dredging or changes to the shoreline. For shipping, environmental planning is also operational planning.

Sediment behaviour affects dredging frequency; water quality conditions can constrain construction windows; and a safe approach depends on accurate hydrographic information over time.

04.297
Cont.
24ShipsFujairah’s new terminals: can the Gulf of Oman absorb diverted cargo?

Fujairah’s new terminals: can the Gulf of Oman absorb diverted cargo?

Demand is the final constraint. A new terminal can support cargo growth, but projected capacity does not create customers by itself. The container side will need a clear service proposition: which origin-destination pairs it serves, whether calls are direct or feedered, what schedules are available and how cargo moves onward. General cargo depends on industrial demand and project cycles. Dibba’s existing bulk operation has an identifiable hinterland in nearby quarries and export markets.

The new general cargo capacity should be evaluated against the industries it is intended to serve, the competing terminals already handling those trades and the road distance to receivers.

Hormuz disruption sharpens the value of alternatives, but it can also scramble ordinary assumptions. A diversion can be temporary, uneven and cargo-specific. Some ships may seek a different port while others remain committed by charter terms, cargo contracts, terminal equipment or pipeline geography. An east-coast terminal may offer resilience for cargo that can physically and commercially move there.

It does not remove the need for a coordinated response across customs, transport operators, carriers and inland customers. The resilient port is the one with procedures and capacity ready before the disruption, not the one whose name appears on a contingency slide.

The most revealing indicators will come after the announcements: when construction starts; what phase one includes; which access arrangements are published; how vessel calls are secured; and whether customers commit to regular services. During start-up, practical measures should include berth productivity, truck turn time, dwell time, missed connections, equipment availability and the percentage of cargo moving to its intended inland destination within plan.

Those figures tell a shipper more than the total annual capacity printed over a rendering.

Fujairah has the location and an existing maritime base. Dibba already demonstrates how a terminal can be designed around a specific export chain, with stockpiles, conveyor, deep-water berth and bulk loader connected as one system. The new development promises a more varied portfolio and a link into DP World’s wider UAE network.

Whether it can absorb diverted cargo depends on how convincingly that network is built on the ground: quays suited to the ships, yards suited to the cargo, roads suited to the peaks and people trained to keep the sequence moving. The water is only the first leg of a port call.

Contributor: Paul Thompson / 24Ships

04.298
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.299
Pipelines, loading arms and backup berths: engineering an alternative to Hormuz
TECHNICAL

Pipelines, loading arms and backup berths: engineering an alternative to Hormuz

A pipeline that avoids Hormuz is only one section of an export route. At Fujairah and Yanbu, the crude must pass through storage, manifolds, metering and loading equipment before a compatible tanker can take it away. The two outlets solve different geography and feed different marine systems. Their resilience depends on how much oil can reach the coast, how quickly a berth can turn a ship, and what happens when a pump, line or loading position is unavailable. This feature follows the route from pipeline interface to ship’s manifold and identifies the limits hidden behind nameplate capacity.

04.300
Cont.
24ShipsPipelines, loading arms and backup berths: engineering an alternative to Hormuz

Pipelines, loading arms and backup berths: engineering an alternative to Hormuz

24Ships feature image.
24Ships feature image.

A pipeline can make an export map look reassuringly simple: oil moves from production areas across land and reaches a coast outside a chokepoint. The line on the map is only the beginning. At the terminal, the crude must arrive at the right pressure and specification, enter storage or a controlled transfer system, pass through pumps and meters, then reach a tanker through equipment designed for a particular range of vessels and operating conditions.

That ship-to-shore interface is where the reliability of an alternative route becomes tangible. Fujairah on the Gulf of Oman and Yanbu on the Red Sea both give Gulf producers a way to reach the open ocean without sending the export vessel through Hormuz. They are not interchangeable outlets. Fujairah receives crude from Abu Dhabi through the Abu Dhabi Crude Oil Pipeline, or ADCOP. Yanbu is linked to the Eastern Province by Saudi Arabia’s East-West pipeline.

The pipelines, coastal facilities, export grades, nearby refineries and routes to market differ, as do the marine conditions at each port.

ADNOC says ADCOP is about 406 kilometres long and carries crude from an ADNOC Onshore collection centre in Abu Dhabi to the Fujairah oil export terminal. That establishes the basic geography. It does not, by itself, establish how many barrels can be loaded on a given day, what storage is available, how the line is allocated among grades or what loading capacity remains free when other terminal users are active.

Capacity figures circulating in public discussion often refer to different parts of the chain: pipeline design rate, terminal nameplate capability, actual throughput or spare capacity. Those measures should not be treated as synonyms.

The same care is needed at Yanbu. Aramco describes the East-West pipeline as linking production facilities in the Eastern Province with Yanbu on the kingdom’s western coast, creating flexibility to export from both coasts. A World Bank analysis has cited a pipeline capacity of five million barrels per day. That number describes a potential flow in a pipeline context, not a guaranteed export rate through a specific berth.

The pipeline may carry crude required by domestic refineries, and the terminal must allocate its facilities among arriving grades and export programmes. A nominal route capacity cannot be assigned wholly to a contingency without checking competing requirements.

24Ships feature image.
24Ships feature image.

For a terminal engineer, the first question is the battery limit: exactly where does the pipeline operator’s responsibility end and the marine terminal’s begin? The handover may be at a custody-transfer meter, a valve station, a storage tank inlet or another agreed point. Each arrangement changes how flow is controlled and who owns the crude during transfer.

Good interface design specifies pressure and flow envelopes, isolation logic, emergency shutdown communication, overfill prevention, leak detection, metering accuracy and the way the line is cleared or made safe after a stop.

Crude oil is not one uniform fluid. Different grades have different densities, viscosities, temperatures and vapour pressures. A terminal receiving more than one grade must prevent contamination and ensure the transfer system is suitable for the product. Pipeline scheduling and tank management become more complex when batches change. The terminal may need dedicated tanks, line displacement procedures or carefully controlled interfaces between batches.

A tanker’s cargo plan then has to match the grade and quantity available. If the nominated ship arrives before the right tanks are ready, the berth can be occupied while the shore side catches up.

04.301
Cont.
24ShipsPipelines, loading arms and backup berths: engineering an alternative to Hormuz

Pipelines, loading arms and backup berths: engineering an alternative to Hormuz

Storage buffers the pipeline from the ship, but it is not an unlimited reservoir. Tanks let the pipeline continue to operate while a vessel is being prepared or loaded, and they give the terminal flexibility to assemble a parcel. Yet storage is finite, and its value depends on turnover. When export windows slip or vessels are delayed, tanks can fill. The pipeline must then slow, divert flow or find another destination.

Conversely, a tank farm with capacity does not prove that the jetty can dispatch the same volume at the same pace. Tank capacity, pumping rate, manifold design and berth availability all need to be considered together.

At the jetty, loading arms or marine hoses form the last fixed connection to the tanker. Loading arms are articulated steel assemblies designed to connect a shore pipeline to a ship’s manifold while allowing for changes in ship position within defined limits. Their operating envelope depends on vessel manifold location, freeboard, relative movement, berth geometry and the arm’s range. A tanker’s manifold may be standard in broad terms, but differences in height, spacing, flange rating and deck arrangement matter.

Before a ship is accepted, the terminal needs reliable vessel particulars and a compatibility review, not just a deadweight figure.

Compatibility is a two-way calculation. The terminal checks that the tanker fits the berth and arms; the ship checks that the manifold can receive the planned flow and pressure. The vessel’s cargo system must also be capable of accepting the grade and quantity, while its crew needs time to prepare tanks, agree communications and confirm the emergency procedures. A high-flow loading rate may be limited by the ship’s manifold, the shore pump, the line pressure, the arms or the port’s operating rules.

The weakest element sets the practical rate.

Berth depth and access are equally important. Tankers arrive with different drafts depending on cargo and fuel, and a fully laden export vessel may be constrained by channel depth, tide, under-keel clearance or turning room. The terminal’s stated vessel envelope should distinguish maximum deadweight from the largest ship that can safely load a specific parcel and depart at a given tide. A deep-water berth alone does not prove that every large tanker can enter, turn, connect and sail at any hour.

Weather and sea state can narrow the envelope further. Wind, swell and current affect approach, mooring and the relative motion between ship and loading arm. The safe operating limit is not simply a design specification; it is a decision made against current conditions, equipment status and vessel movement. A terminal may suspend loading or disconnect arms when conditions exceed limits. Those interruptions reduce throughput even when the pumps and pipeline remain available.

They also make berth scheduling more difficult because a delayed ship can displace the next tanker’s window.

Mooring arrangements are part of the loading system. Lines, hooks, quick-release mechanisms, fenders and monitoring equipment must hold the vessel within the permitted movement envelope. A large tanker presents significant windage and inertia; the mooring plan has to account for the vessel, prevailing conditions, tug support and berth geometry. Emergency release systems are designed so that a transfer can be stopped and the ship disconnected safely if a hazardous condition develops.

Their availability and testing are as important as the nominal loading rate.

The loading sequence begins long before the first barrel moves. The vessel’s agent submits particulars and ETA; the terminal confirms the cargo parcel, berth window and expected rate; the ship and shore teams agree the ship-shore safety checklist and communications; tanks and lines are lined up; and the parties verify emergency stops and transfer limits. Initial flow is normally controlled while the connection is checked for leaks and stable pressure. Flow can then be increased within the agreed limits.

04.302
Cont.
24ShipsPipelines, loading arms and backup berths: engineering an alternative to Hormuz

Pipelines, loading arms and backup berths: engineering an alternative to Hormuz

At completion, the line and arms are drained or cleared according to the system design, valves are isolated, the connection is disconnected and cargo figures are reconciled.

The details are not administrative decoration. Miscommunication over a valve sequence, pressure limit or emergency signal can turn a routine transfer into a serious event. The interface plan should name who has authority to stop the transfer and how that instruction is conveyed across the ship-shore boundary. A bilingual workforce, multiple contractors or a change of watch can add complexity.

Clear terminology, tested communications and a shared cargo plan reduce the chance that a ship and terminal act on different assumptions.

Metering and quantity reconciliation also carry operational weight. The custody-transfer system provides the basis for commercial accounting, while tank measurements and ship figures can reveal losses, discrepancies or unexpected conditions. A terminal needs calibrated instruments, documented procedures and a way to investigate differences. Where multiple grades or parties share infrastructure, accurate measurement supports scheduling as well as invoicing.

It helps establish whether the bottleneck lies in pipeline delivery, tank operations, loading equipment or the vessel’s own system.

A terminal’s apparent redundancy can be misleading. Two loading positions do not automatically provide twice the capacity. They may depend on common pumps, power, control systems, pipelines or a shared approach channel. If one critical valve station, power source or export line is out of service, several berths may be affected at once. Engineers distinguish between equipment redundancy and functional independence.

A true backup arrangement needs to consider common-mode failure: the event that disables components which appear separate on a drawing but share a utility, route or control point.

The same logic applies to backup berths. A second berth is useful only if it can accept the vessel, cargo and transfer equipment in question. A berth intended for products may not be appropriate for crude; a berth with the right arms may not have sufficient draft for a laden tanker; a position exposed to different sea conditions may have a smaller operating window.

A contingency plan should specify which ships can use the alternative, what modifications are needed and whether pipelines can route the required grade there without shutting down other operations.

The route’s landward resilience also matters. Pipeline integrity, pumping stations, power supply, communications and access for maintenance crews are all parts of the export chain. A line that crosses long distances cannot be treated as a single static asset. Operators need inspection, corrosion control, leak detection, isolation valves and emergency response arrangements along the route. Coastal export facilities rely on utilities and control systems that may have separate owners.

A disruption at a power substation or communications link can constrain operations even when the steel pipe is intact.

Storage, pipeline flow and ship schedules must be coordinated across organisations. The pipeline operator may plan nominations weeks ahead; the terminal allocates tanks and berth windows; the shipowner commits tonnage; the charterer manages the voyage; and the receiver expects a defined arrival range. If one party changes a grade or parcel size late, the consequences can cascade.

A terminal can reduce those effects with transparent nomination deadlines, clear tolerance bands, reliable ETA updates and a process for handling delays. It cannot eliminate variability at sea, but it can avoid turning every late arrival into an improvised reshuffle.

04.303
Cont.
24ShipsPipelines, loading arms and backup berths: engineering an alternative to Hormuz

Pipelines, loading arms and backup berths: engineering an alternative to Hormuz

A planned export programme should include operational margins. The maximum pump rate is not a sustainable average if equipment needs frequent maintenance or if ships must wait for weather. A realistic plan accounts for connection and disconnection time, tank changeovers, inspections, crew hours, berth cleaning or maintenance and delays to vessel arrival. It also tests a credible outage: how much can be moved if one pump train is unavailable, a loading arm is isolated or a ship cannot sail on the planned tide?

The answer is more useful than a nameplate figure because it shows the route’s resilience under stress.

Fujairah and Yanbu offer different forms of strategic flexibility. Fujairah is on the Gulf of Oman and offers direct access to routes into the Arabian Sea and Indian Ocean. Yanbu sits on the Red Sea, opening a westward maritime route. The value of each depends on where the crude originates, the pipeline’s available capacity, the grade demanded by a buyer, tanker availability and the wider state of shipping lanes.

A cargo routed through Yanbu may face different voyage lengths, freight markets and destination options from a cargo loaded at Fujairah. The engineering route and the commercial route are connected.

The Strait of Hormuz is the planning context, but “alternative” should not be read as “unlimited substitute”. The pipelines can move oil around the strait only within their operating and allocation limits. The terminals must load what the pipelines deliver, and the tankers must be available and compatible. In a disruption, demand for the remaining export routes can rise precisely when ships, insurance, pilots and terminal windows become harder to secure.

Contingency capacity has value, but it needs to be operationally credible before a crisis rather than assumed from a map.

A useful review of either route begins with a chain diagram that shows the actual capacity at each step: production and collection, pipeline pumping, storage receipt, tank availability, terminal pumps, loading arms, berth occupancy, channel and departure conditions. For each step, identify the owner, normal rate, credible constrained rate, planned maintenance and failure mode. Then test the result against tanker sizes and loading parcels actually expected.

This exercise often reveals that the limiting factor is not the pipeline’s overall rating but an interface that cannot be expanded quickly.

For ship operators, the practical questions begin earlier still. Ask for the terminal’s current vessel acceptance criteria, published draft and tidal limitations, manifold requirements, mooring plan, maximum operating pressure and flow, loading arm range, tug arrangements, weather limits and emergency disconnection procedures. Confirm whether a stated capacity applies to a single berth, the entire facility or the line feeding it.

Clarify the process for a late vessel, the consequences of an incomplete cargo parcel and who bears costs when the berth window is missed.

For terminal planners, the priorities are similarly concrete: maintain an accurate vessel-compatibility database; make interface tests routine; keep critical spares for arms, swivels, seals and valves; exercise emergency shutdown links; train ship and shore teams together; and review loading performance after each call. Maintenance records should be tied to service availability, so that a planned overhaul does not unexpectedly coincide with a peak export schedule.

A port can publish an impressive loading rate while quietly losing time to repeated connection failures or slow line changes. The useful metric is cargo transferred safely per occupied berth-hour.

A pipeline that reaches a coast creates an option. The export route becomes dependable only when the tank farm, control room, jetty, loading arms, berth, ship and voyage plan function as one system. Fujairah and Yanbu demonstrate how geography can add choices to the Gulf’s oil trade. Their real capacity is measured at the ship’s manifold, under the limits of the day, with the next vessel waiting for a berth that can safely take her.

Contributor: Paul Thompson / 24Ships

04.304
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.305
How Oman’s port control teams manage a fast-growing call list
INSIDER

How Oman’s port control teams manage a fast-growing call list

Oman’s ports received 6,586 ships in the first half of 2025, 11.1 per cent more than in the same period a year earlier, according to the transport ministry. That figure is a prompt to look past the annual total and into the daily sequence: ETA updates, pilot availability, berth readiness, tug allocation and the calls that do not proceed as planned. At Sohar and Salalah, control-room coordination links ship, agent, terminal and marine services. Public material explains some rules and reports the growth; it does not reveal every shift-level decision. The operating logic, however, can be traced through the published procedures and port infrastructure.

04.306
Cont.
24ShipsHow Oman’s port control teams manage a fast-growing call list

How Oman’s port control teams manage a fast-growing call list

24Ships feature image.
24Ships feature image.

A port call is often presented as a single event: the ship arrives, works cargo and sails. In practice, the call is a chain of decisions made by people who may work for different organisations and who rarely have the same view of the whole port. The master has a ship to navigate. The agent has a schedule to keep current. The pilot needs a safe boarding window. The terminal wants a berth occupied by a ship ready to work. Harbour control has to make the movements fit together.

Oman’s transport ministry reported that the country’s ports and offshore berths received 6,586 vessels in the first half of 2025, compared with 5,930 in the first half of 2024, a rise of 11.1 per cent. The same ministry report put container throughput at Salalah, Sohar and Duqm at 2.43 million TEU in the period, up 11.7 per cent year on year. These are national figures, not a call count for either Sohar or Salalah alone.

They nevertheless show why marine coordination deserves attention: more calls and cargo mean more moments when a plan has to be reconciled with the conditions actually present.

The term “port control” can suggest a single room with a screen and a person directing every ship. The real division of responsibility is more nuanced. The port authority or its marine services team oversees movements within the port limits and applies local rules. Vessel traffic services, where provided, collect and distribute traffic information and may give advice or instructions under the applicable arrangements.

Pilots advise the master on local navigation and conduct the ship’s movement in close coordination with the bridge team. The harbourmaster’s authority and the exact procedures vary by port. Public port rules set out the formal framework; daily coordination fills in the operational detail.

Before a ship reaches the pilot station, its arrival is already being revised. The agent supplies vessel details, cargo information, certificates and the expected time of arrival. The ship sends updates as weather, speed, congestion or a change of destination shifts the schedule. The terminal reports whether the berth, equipment and labour will be ready. The port’s marine team considers the channel, tide, visibility, traffic and availability of pilots and tugs.

A time slot agreed days earlier can become less useful than a current estimate checked against the whole chain.

An ETA is therefore not simply a number on a screen. It is an input to a sequence. If a ship arrives too early, it may need to wait at anchorage or slow down at sea. If late, it can miss the intended berth window and affect the ship due behind it. The terminal may have planned labour and cargo equipment around the original schedule. Pilot and tug teams may have other movements booked.

24Ships feature image.
24Ships feature image.

A change in one arrival can ripple through several calls, especially when large vessels require a limited number of deep-water berths or a particular tide.

A robust arrival process distinguishes between the first forecast and the confirmed readiness message. The forecast helps planners look ahead; the readiness notice says whether the ship can actually proceed. The vessel may still be dealing with paperwork, cargo documentation, stores, a medical call or a technical defect. A ship that is physically close but not ready to enter can block a more useful movement if the berth and pilot are held for it.

An accurate “ready” status is a service to every other vessel in the queue.

The pilot transfer is one of the most visible handovers. The pilot brings local knowledge of channels, turning areas, currents, depths and port-specific practice, but the master retains command of the vessel. The bridge team and pilot exchange information about the passage, machinery, steering, tug plan and intended berth. A pilot ladder must be rigged to the required standard and in a safe position; the boarding arrangement is a working interface, not a ceremonial step.

04.307
Cont.
24ShipsHow Oman’s port control teams manage a fast-growing call list

How Oman’s port control teams manage a fast-growing call list

Poor weather, wash, darkness or a defective ladder can delay boarding and alter the movement plan.

At Sohar and Salalah, pilotage and marine service arrangements are governed by local information and the relevant port rules. Operators should use the latest port guide and agent notices rather than rely on a generic description of Oman. Vessel size, draft, cargo, berth and conditions determine the actual requirements. A ship’s master should confirm pilot boarding position, notice periods, communications channel, tug requirements and any restrictions before arrival.

The agent’s role is to keep that information current and ensure the vessel’s particulars match the port’s records.

Tugs are another part of the sequence that can be misunderstood. They are not simply ordered by ship size. Their number and power depend on the vessel’s characteristics, windage, propulsion and steering, berth layout, movement plan and local rules. A ship with limited manoeuvring capability may need a different arrangement from a highly manoeuvrable vessel of comparable tonnage. Tug availability can itself become a planning constraint where several arrivals coincide.

The control team has to consider which movement needs the tug most and whether one tug can complete an assignment and return in time for the next call.

The approach channel adds a physical timetable. Depth, width, turning basin geometry, tide and under-keel clearance determine which ships can transit and when. Dredging can change the available depth, while sedimentation may require updated surveys and temporary notices. A port’s published maximum draft does not necessarily mean every ship at that draft can enter at any time. The allowable draft may depend on tide, water density, squat, weather and safety margins.

The bridge team and pilot need a shared calculation using reliable information, not a number remembered from an earlier visit.

A berth is also a resource with its own readiness state. The quay may be occupied, the previous vessel may have overstayed, a crane may be unavailable, cargo gear may need testing, or a survey may still be under way. The control team does not allocate a ship to an abstract line on a chart; it coordinates an arrival with the terminal’s ability to receive and work that ship. Some berths are cargo-specific or have limitations on dimensions and draft.

A vessel with the right cargo but the wrong draft cannot be made suitable by a late change to the schedule.

At a container port, the sequence often depends on the predicted completion of the ship already alongside. Terminal planners estimate moves, crane assignment, yard availability and labour. A slow operation can delay the next vessel even if that next ship is ready and the pilot is available. At a bulk or liquid terminal, transfer rate, tank readiness and cargo documentation shape the likely departure time. The marine schedule and cargo plan therefore need continual exchange.

A harbour control team that receives only a vessel ETA but not changes in expected completion is working with a partial picture.

The difficult calls are rarely the ones in the published schedule. A ship may arrive with a steering defect, a pilot boarding arrangement may be unusable, a berth may be blocked by a late departure, or visibility may fall below the permitted limit. A tug can develop a fault just as another ship calls for assistance. The correct response may be to hold, delay or re-sequence traffic. The decision carries commercial cost, but the cost of forcing a movement under unsuitable conditions can be much greater.

A clear rule for stopping and restarting movements helps keep pressure from the schedule out of the bridge team’s safety judgement.

04.308
Cont.
24ShipsHow Oman’s port control teams manage a fast-growing call list

How Oman’s port control teams manage a fast-growing call list

Weather is not merely wind speed. Wind direction relative to the ship and berth, swell entering the harbour, current across the channel and local visibility each affect different stages of a call. A vessel might safely remain alongside while an approach or departure is suspended. A pilot transfer may be unsafe even when the sea state is acceptable for the ship at anchor. Tug performance and line loads change with conditions.

Port control must use the relevant limits for that movement, rather than a single weather threshold applied to every operation.

Anchorage management is a coordination problem in its own right. Waiting ships need safe anchor positions, adequate separation, access for launches and services, and a plan for any vessel whose machinery or cargo creates additional risk. A crowded anchorage can complicate pilot boarding and emergency response. The control team may need to move ships as the weather changes or reassign positions when a vessel’s expected stay grows.

The agent should pass on changes in readiness and any requests for bunkers, stores or crew transfer so that those services can be arranged without interfering with traffic.

Information quality determines how much of this work can be done calmly. Vessel particulars must be accurate: length overall, beam, draft, air draft, manoeuvring limitations, bow thruster capability, propulsion and cargo type. If the ship’s information is wrong, the pilot and terminal may plan around a vessel that does not exist. Likewise, an ETA that remains unchanged despite a major speed reduction is not useful.

A simple discipline of timely updates, clear cut-off points and named contacts can prevent avoidable reshuffling.

The port community needs a shared view of status. That does not mean every party needs access to every document. It means the ship, agent, port control, pilot station, tug operator and terminal can see the relevant milestones: notice received, documents accepted, pilot requested, berth confirmed, tug assigned, vessel ready, movement authorised, all fast, cargo started and departure requested. Some ports use digital platforms to exchange this information; others rely on established communications channels.

The tool matters less than whether updates are timely, traceable and understood by the people who must act.

Oman’s national port figures also need careful reading. The ministry’s 6,586 arrivals include offshore berths and ports beyond Sohar and Salalah, and the growth was attributed in part to Shinas, Sultan Qaboos Port and Salalah. It would be wrong to infer that every port experienced the same increase or that call density rose evenly through each day. Throughput can grow while the number of calls changes little if ships become larger or cargo volumes rise.

Conversely, many short calls can create intensive pilotage and tug demand with relatively little cargo. Planning needs disaggregated port data and peak-hour patterns, not just a national total.

There are several practical metrics that reveal how well the sequence works. Compare the first ETA with the actual arrival and the final berth time. Track the interval between pilot request and boarding, anchorage waiting time, tug response, time from all-fast to cargo start and cargo completion to sailing. Record why a movement was delayed: ship not ready, berth occupied, weather, channel restriction, documentation, pilot or tug availability. The explanation matters as much as the average.

A long wait caused by one exceptional event calls for a different remedy from a recurring mismatch between berth windows and vessel arrival patterns.

04.309
Cont.
24ShipsHow Oman’s port control teams manage a fast-growing call list

How Oman’s port control teams manage a fast-growing call list

Safety performance should sit alongside productivity. Near misses during pilot transfers, mooring incidents, unsafe ladder reports, tug contact, grounding risk and unplanned stops all reveal pressure in the system. A port that improves average waiting time by accepting an unsafe transfer has not improved its operation. Learning reviews should include ship and shore participants and identify whether procedures, information or timing need to change.

The objective is a sequence that remains safe during the busiest day, not merely an impressive annual average.

For agents, useful preparation starts before the ship leaves its last port. Confirm all vessel particulars, cargo and berth suitability; establish the local notice periods; check documents and certificates; monitor the ETA against the terminal plan; and escalate a defect early. For the master, it means reviewing passage information, pilot arrangements, bridge-team roles, tug plan, mooring stations and contingency actions.

For terminal planners, it means sharing realistic completion estimates and equipment status, not the optimistic time that would fit the commercial schedule. The harbourmaster’s team can coordinate only as well as the information it receives.

A fast-growing call list does not automatically mean a port is under strain. It does mean that the value of coordination rises. Sohar and Salalah operate in different commercial settings and should not be collapsed into one generic model: Sohar is closely linked to an industrial port and free-zone ecosystem, while Salalah’s role includes major container and transhipment activity. The marine-control task at each port responds to its own berth layout, cargo mix, approach conditions and service resources.

A national figure is a reason to examine those local systems, not a substitute for doing so.

The most effective port control work is often invisible. A ship receives its pilot at the right time, the tug is waiting, the berth is clear, cargo teams are ready and the next arrival has room to adjust. When the sequence works, the call looks simple. That apparent simplicity is the result of a chain of current information, safe limits and decisions made early enough to preserve options. With more ships moving through Oman’s ports, keeping that chain coherent becomes as important as adding capacity at the quay.

Contributor: Paul Thompson / 24Ships

04.310
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.311
The Dhalkut port proposal at Oman’s remote southwest edge
24 UNUSUAL

The Dhalkut port proposal at Oman’s remote southwest edge

Dhalkut is not a rival to Salalah’s container terminal, and it would be a mistake to judge its proposal by the scale of a major commercial gateway. Oman’s transport ministry has listed an investment opportunity to manage, develop and operate the port; older descriptions identify Dhalkut as a fishery harbour serving a remote stretch of Dhofar near the Yemen border. The practical question is what a concessionaire could operate sustainably: fishing services, local cargo, safe berthing and basic marine support, with infrastructure suited to the monsoon-exposed coast. A credible model starts with the users and the harbour’s limits, then works outwards.

04.312
Cont.
24ShipsThe Dhalkut port proposal at Oman’s remote southwest edge

The Dhalkut port proposal at Oman’s remote southwest edge

24Ships feature image.
24Ships feature image.

On a map, Dhalkut sits well away from the main ports that dominate regional shipping. It is on Oman’s far southwestern coast, in Dhofar, close to the border with Yemen and far from the dense industrial and logistics networks around Sohar, Duqm and Salalah. The distance is not a defect in the proposal. It is the reason the proposal needs to be judged by a different measure.

Oman’s Ministry of Transport, Communications and Information Technology lists a “Dhalkut Port Management, Development, and Operation Project” among its investment opportunities. In 2025 the ministry also said it intended to sign long-term concession agreements for ports including Dhalkut. That gives the opportunity an official policy context, but the public information available does not establish a completed concession, a confirmed construction scope or a published financial case.

The words “management, development and operation” leave the central questions open: what functions will be transferred, what investment is required and which users are expected to sustain the facility?

The existing facility is described in public accounts as a fishery harbour, rather than a deep-sea commercial port. A technical project record from a consulting firm describes work on the development of the existing fishery harbour at Dhalkut and places it on the Arabian Sea coast about 15 kilometres from the Oman–Yemen border.

It notes that severe wave disturbance at the harbour entrance creates a navigation hazard for fishermen, particularly during the southwest monsoon, and that the project addressed all-weather safe navigation and harbour extension. This is a useful reminder that Dhalkut’s first port question is not how many containers it can handle. It is whether local vessels can reach shelter safely through the seasons.

Oman’s coast is not a uniform operating environment. The southwest monsoon brings conditions to Dhofar that differ sharply from those at ports farther north. For a small fishing vessel, an exposed entrance can determine whether a day’s catch can be landed or whether the boat must remain at sea or in an unsafe position. A harbour that is technically open but difficult to enter when weather turns is not reliable infrastructure.

Breakwater geometry, entrance orientation, wave transmission, shoaling and maintenance dredging all affect whether protection works in practice.

The word “port” can mislead investors who imagine a miniature version of a major cargo terminal. Dhalkut’s location and known history point instead to a local service role. Oman Observer reported in 2021 that the fishing port had opened in 1998 and served local fishermen, with an ice-making, cooling and freezing plant, fuel station and fish market.

24Ships feature image.
24Ships feature image.

These details describe the kind of everyday facilities that can give a small harbour value: keeping catch in usable condition, providing fuel, creating a place to sell and supporting a local fleet. They are not proof that each asset remains operational today, so a prospective operator would need a current condition survey and inventory.

The likely demand base begins with fisheries. A port can support more value from a catch by reducing spoilage, improving handling and making landing more predictable. Ice, cold storage, clean water, electrical supply, waste disposal, landing areas and a functioning market are not secondary amenities. They determine whether fish can move from boat to buyer in saleable condition. A concession that focuses on quay repairs but leaves the cold chain unreliable will not solve the central commercial problem.

A fishery harbour also needs to understand its fleet. Traditional boats, larger wooden vessels and mechanised craft have different requirements for depth, berth access, mooring and maintenance. The channel and basin should be surveyed against the vessels that actually use the port, including their loaded draft and approach behaviour in local conditions. A deeper harbour is not automatically better if it brings costly dredging and maintenance that the fleet does not need.

04.313
Cont.
24ShipsThe Dhalkut port proposal at Oman’s remote southwest edge

The Dhalkut port proposal at Oman’s remote southwest edge

The right design is the one that safely serves a documented vessel mix, with a modest allowance for change rather than a speculative maximum ship size.

The fish landing cycle is operationally compact but time-sensitive. Boats may arrive in groups, depending on weather and fishing patterns. The port needs to give them room to approach, unload and berth without obstructing one another. If landing is concentrated in a short window, ice and market capacity must handle the peak rather than the weekly average. A buyer’s availability, transport vehicle and onward road journey can determine the value of the catch.

The port manager therefore needs a view of the whole chain from vessel landing through grading, sale, storage and dispatch.

A small port may also support coastal services or local cargo, but those opportunities should be demonstrated rather than assumed. Dhalkut is not positioned beside a large industrial estate or population centre that automatically generates a steady stream of container traffic. A viable cargo service would need identifiable customers, dependable volumes, suitable ships, customs arrangements, a safe berth and a road connection capable of carrying the goods.

If the cargo is occasional, a scheduled commercial route may cost more than it saves. Local construction materials, food, fuel or community supplies may be more plausible candidates, but each needs an evidence-based demand assessment.

The road connection is central. Dhalkut is remote, and the value of any port service depends on the quality and reliability of the land route to its users. For fish, the issue is time and temperature: how quickly can a chilled load reach processors or markets, and what happens if the road is disrupted? For supplies, the cost of transport may overwhelm the advantage of a coastal landing. For port operations, roads are needed to bring fuel, ice-making equipment, spare parts, maintenance crews and emergency support.

A development plan must map the whole access route, identify seasonal or terrain-related constraints and consider how vehicles will turn and load safely inside the site.

The port’s scale also changes the economics of staffing. A major terminal can spread the cost of a control room, maintenance team and safety systems across thousands of calls. A small harbour cannot assume that level of throughput. It still needs someone responsible for safe access, mooring, emergency response, asset maintenance, records and user coordination. Some specialist services may have to be shared or contracted, but the responsibility cannot be left vague.

A concession agreement should say who maintains breakwaters, navigation aids, pontoons, quay surfaces, utilities and safety equipment, and how the operator reports failures.

That division is especially important if an investor is asked to fund improvements. The useful sequence is a condition survey, a demand study, a marine assessment and a service plan. The survey should identify what exists, what works and what has reached the end of its service life. The demand study should quantify current and potential harbour users without inflating local need into a regional trade forecast.

The marine assessment should cover wave climate, bathymetry, sediment, navigation and environmental constraints. The service plan should define opening hours, user charges, maintenance standards, emergency cover and performance measures.

A concession can distribute responsibilities over time, but it does not eliminate them. If a private operator is expected to invest, the contract needs a clear asset baseline and a practical mechanism for approvals. A breakwater repair may need government funding, marine permits and specialist design; a market refurbishment may be within the operator’s control. A dredging obligation can become financially material if sediment behaviour is not well understood.

04.314
Cont.
24ShipsThe Dhalkut port proposal at Oman’s remote southwest edge

The Dhalkut port proposal at Oman’s remote southwest edge

Investors will want clarity on tariffs, land tenure, revenue rights, access for local fishermen and the treatment of public services that may not generate commercial returns.

The fisheries dimension makes the user relationship particularly important. A port is not just a landlord to boats. It is a working place used by people whose livelihoods depend on reliable access and fair treatment. Consultation should establish how vessels currently berth, how fish is sold, which services are missing, what price fishermen can bear and whether the operator’s plans could exclude smaller users. A tariff regime designed for larger commercial vessels may make little sense for a local fleet.

Conversely, charging too little to fund basic maintenance can allow assets to deteriorate until the harbour becomes unsafe.

The local environmental setting should shape operations as well as construction. Fishing activity and harbour use can affect waste handling, fuel spills, bilge management and the condition of nearshore waters. A new ice plant or cold store changes electricity and water demand; any expansion may change lighting, traffic and waste volumes. Marine works can affect sediment and habitat. Environmental approval is not a box to tick after a project is designed.

Baseline surveys and monitoring can help determine whether a proposed breakwater or dredging plan would alter currents, erosion or water quality.

Safety arrangements deserve more attention than a small vessel count might suggest. Harbour users may vary in vessel condition, equipment, training and familiarity with formal procedures. The entrance can be hazardous in swell, and the port may have limited emergency support nearby. A credible operation needs clear weather limits, navigation information, emergency contacts, basic firefighting and spill response, safe access to the water and an incident-reporting process.

The harbour manager should know which vessels are in the port and who is responsible for them, especially during deteriorating weather.

Climate and weather resilience are not abstract issues at this location. The reported entrance hazard during the southwest monsoon points to a risk that affects ordinary use. Design review should test the harbour against observed seasonal wave conditions, not an average day. It should also consider how a facility can be inspected and repaired after a storm, whether equipment is protected from salt and wave damage, and whether fishermen have a safe way to secure boats.

If the entrance becomes unusable during the season when shelter matters most, the port’s utility is sharply reduced.

The management model should fit a modest but essential facility. A concessionaire might combine harbour management with fish handling, cold storage, fuel and maintenance services. It may partner with local businesses for the market and transport. It could build a small service yard or supply point if there is enough demand.

The strongest proposal is likely to combine modest revenue streams, clear service obligations and planned public support for infrastructure that has community value but cannot be financed by port fees alone. Expecting a high-volume cargo business to subsidise everything would be a fragile starting assumption.

Performance should be measured in terms users recognise. Are harbour entrances available within defined weather conditions? Are navigation aids working? How many days is the ice plant operational? How much catch is handled through suitable cold-chain conditions? Are landing areas clean and safe? How long do boats wait for berth or unloading space? Are maintenance defects closed promptly? How often are operations interrupted by preventable equipment failures?

These indicators can help an operator show progress without pretending the harbour has the scale of a national gateway.

The official investment listing is an invitation to investigate, not a complete development brief. A potential operator should request current plans, hydrographic data, asset records, past traffic and landing figures, environmental approvals, the proposed concession terms and the status of any previously completed marine works. It should ask whether the harbour is intended to remain primarily a fishery facility or whether additional cargo functions are sought.

If the scope is not defined, bidders could price different projects and produce proposals that cannot be compared fairly.

The distance from Dhalkut to the large ports is precisely why the project should not be sold as a miniature logistics hub. Its most credible value may be local: a safer harbour entrance, dependable services for fishing vessels, better preservation and marketing of catch, and more reliable access to supplies for a remote community. Those improvements can be economically meaningful even if vessel numbers remain small. The test is not whether Dhalkut can imitate Salalah.

It is whether an operating model can keep this particular harbour safe, useful and maintained through the conditions that make its location challenging.

Contributor: Paul Thompson / 24Ships

04.315
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.316
Desalination outfalls and port waters: measuring the impact on Gulf marine life
SUSTAINABILITY

Desalination outfalls and port waters: measuring the impact on Gulf marine life

Along the Gulf coast, desalination, shipping, dredging and coastal development can all shape the same stretch of water. Fujairah offers a rare published example of environmental monitoring that considers desalination and maritime activity together: a 2024 study used baseline surveys and buoy data offshore, while Abu Dhabi’s environmental agency has published a separate multi-year assessment near the Mirfa desalination plant. The evidence shows why a single sample, taken at the wrong time or in the wrong place, can miss what is happening. The practical challenge is to design monitoring that can separate sources, follow seasonal change and trigger action when conditions worsen.

04.317
Cont.
24ShipsDesalination outfalls and port waters: measuring the impact on Gulf marine life

Desalination outfalls and port waters: measuring the impact on Gulf marine life

24Ships feature image.
24Ships feature image.

A water sample can be precise and still answer the wrong question. A salinity reading taken near an outfall may show that the water is saltier there at that moment. It cannot, on its own, tell an operator whether the difference comes from desalination brine, seasonal mixing, currents, dredging or a combination of pressures. In a busy coastal zone, measurement design matters as much as the laboratory result.

Fujairah is a useful place to examine the problem because its offshore waters sit alongside several intense uses. The port and nearby facilities serve ships, including tankers; desalination supplies water to the population; and coastal infrastructure creates a setting in which environmental effects can overlap.

A 2024 study of Fujairah offshore waters combined baseline surveys at 30 locations with a year of measurements from two buoys: one nearshore across from the Qidfa desalination plant and one offshore across from the Skamkam oil and gas port. The researchers reported indications of water-quality deterioration at both buoy sites, with greater deterioration at the nearshore site, and called for long-term monitoring to identify seasonal variation and longer-term change.

That study is not a regulator’s compliance determination, and its results should not be stretched beyond the sites and period it examined. Its value lies partly in the design: it sets a baseline across multiple locations, then keeps instruments in the water to record change over time. A buoy can capture conditions between sampling visits, when short-lived events might otherwise go unobserved. It can also show whether a reading is part of a seasonal pattern or an unusual excursion.

It cannot replace laboratory analysis, biological surveys or a careful account of what is happening at nearby facilities.

Brine discharge is often discussed as if salinity were the only variable. Desalination can produce a concentrated stream with elevated salinity and temperature, and treatment processes may involve chemicals used for cleaning, scale control or disinfection. The actual discharge depends on plant technology, operating conditions, diffuser design and receiving-water characteristics.

A well-mixed outfall can reduce local concentration close to the seabed or discharge point; poor dilution can leave a persistent high-salinity zone. The question for marine monitoring is therefore not just “is the water salty?” but how the plume behaves in space and time and which organisms encounter it.

24Ships feature image.
24Ships feature image.

The Environment Agency – Abu Dhabi has addressed a related question near the Mirfa desalination plant. Its 2024 Marine Water Quality Network report says the agency commissioned a three-year ecological assessment, covering 2021 to 2023, with quarterly sampling at seven sites. The study examined biological and chemical parameters.

EAD reports that salinity and chlorophyll-a were notably high near the discharge site; most chemical parameters were within standards, while several metals exceeded limits in water or sediment in particular sampling periods. Plankton and benthic surveys found a range of species, alongside reported changes in seagrass coverage. The agency recommended continued monitoring for at least five further years to better understand long-term effects.

The Abu Dhabi assessment demonstrates both the value and limits of periodic sampling. Quarterly visits provide repeatable seasonal checkpoints and allow laboratory work across a range of parameters. Seven sites create a spatial comparison rather than relying on a single point at the outfall. But a quarterly sample is still a snapshot. A discharge plume can move with tide, current, wind and plant operation. An episodic dredging event, ship spill or unusual discharge could occur between scheduled visits.

To understand cumulative effects, the monitoring programme needs to combine scheduled sampling with continuous measurements and event-triggered investigation.

04.318
Cont.
24ShipsDesalination outfalls and port waters: measuring the impact on Gulf marine life

Desalination outfalls and port waters: measuring the impact on Gulf marine life

Ports complicate the attribution problem. Ships can discharge permitted operational waters under specified rules, but spills and accidental releases can also occur. Vessel traffic disturbs sediment and introduces underwater noise. Dredging changes the seabed and can resuspend material. Quay construction, reclamation, cooling-water intakes, stormwater drains and shoreline development each add potential pressure. A monitoring station close to a desalination outfall may record several of these influences together.

If the programme cannot distinguish them, managers may know that conditions changed without knowing which operator should act.

The first step is a conceptual site model. Map every plausible source and pathway: the brine outfall, chemical dosing, cooling-water discharge, port storm drains, vessel anchorages, dredging areas, navigation channels, industrial discharges and natural freshwater or sediment inputs. Then identify the receptors that may be affected, including seagrass, coral, plankton, benthic communities, fish nursery areas and protected habitats.

The model should state what is known, what remains uncertain and which measurements could resolve the uncertainty. It turns “monitor water quality” into a testable plan.

Location selection should follow that model. One station can sit near the outfall to measure the plume, but it should be paired with reference locations that represent comparable water unaffected by the discharge. Additional points along likely plume pathways can show how conditions change with distance. Nearshore and offshore measurements may differ because of bathymetry, current exposure and proximity to other activities.

Stations should be positioned with the help of hydrodynamic information rather than simply placed at convenient boat access points.

Depth matters too. Brine can be denser than ambient seawater and may travel close to the seabed, depending on discharge design and local mixing. A surface sample may therefore miss a bottom plume. Conversely, a surface sensor can capture temperature or other changes that differ from the deeper water column. A robust profile measures at multiple depths and, where appropriate, close to the seabed. The exact arrangement should reflect the outfall and marine conditions rather than a generic sampling template.

Timing needs equal care. The Gulf’s seasonal conditions alter temperature, mixing, circulation and biological activity. A useful baseline spans the seasons and records tide, current, wind, rainfall and plant operating state at the time of each sample. Without this context, a seasonal increase in salinity may be misread as a new impact, or a short-lived outfall change may be hidden inside a broad average.

The monitoring record should include the discharge flow and relevant operating parameters, subject to appropriate data access and quality control.

Continuous sensors can capture salinity, temperature, dissolved oxygen, turbidity, pH and other parameters at high frequency. Their strength is temporal coverage; their weakness is that they need calibration, cleaning and validation. Fouling, drift, biofilm and sensor failure can create convincing but false trends. Instruments should be checked against field measurements and laboratory samples on a scheduled basis.

Data quality flags must be retained so that analysts can distinguish an environmental change from a malfunctioning probe.

Laboratory samples answer different questions. They can measure nutrients, metals, hydrocarbons, suspended solids and other chemical parameters at levels and detection limits suited to regulatory or ecological assessment. Sampling bottles, preservation, chain of custody and analytical methods all affect whether results can be compared over time. Sediment testing is essential where contaminants can accumulate at the seabed, while water-column sampling alone may miss that reservoir.

04.319
Cont.
24ShipsDesalination outfalls and port waters: measuring the impact on Gulf marine life

Desalination outfalls and port waters: measuring the impact on Gulf marine life

The report should disclose methods, detection limits, quality assurance and any deviations from the protocol.

Biological indicators help connect chemistry to ecological consequence. Seagrass cover and condition, benthic species, plankton composition, fish presence and coral health can reveal responses that a basic water chemistry panel will not. Biological systems often respond over longer periods and to multiple stressors, so interpretation must be cautious. A change in species abundance may reflect temperature, habitat disturbance, fishing pressure or water quality.

Repeated surveys at consistent locations, using standard methods, provide a stronger basis for identifying a trend than a one-off inventory.

The difference between compliance monitoring and ecological monitoring should be explicit. Compliance asks whether a discharge or receiving water meets a licence condition or standard at a defined point. Ecological monitoring asks whether the broader system is changing and whether organisms are affected. Both are necessary, but one cannot stand in for the other. A facility may comply with its permit while cumulative pressures still affect habitat.

Conversely, a biological change may have causes unrelated to a single outfall. The programme must be designed to answer the question being asked.

Cumulative effects demand a shared spatial picture. Port authorities, desalination operators, environmental regulators and dredging contractors may each monitor their own activity. If data are stored in separate formats, at different locations and with different time intervals, comparing them becomes difficult. A coastal observatory or shared data protocol can help establish common reference stations, compatible methods and event logs.

The regulator remains responsible for oversight, but operators can contribute operational data and support coordinated sampling.

The event log is often underappreciated. A water-quality spike is much easier to interpret if the analyst can see that dredging began, a vessel grounded, a heavy rain event occurred or a plant changed operating mode. Port control, terminal logs and environmental data need a way to align timestamps and locations. Without that, investigators may spend weeks debating whether a measurement is an outfall signal or a coincidence.

Shared records can protect operators as well as the environment by ruling out unsupported attributions.

Dredging illustrates the need for that coordination. Before work begins, surveys can characterise sediment chemistry, grain size and habitat. During dredging, turbidity monitoring can test whether plumes remain within expected limits. After the work, repeat surveys can examine deposition and biological recovery. A port’s routine water-quality programme may not capture the short, intense changes associated with dredging unless the schedule is adapted.

The dredging contractor should report location, time, method and volume in a format environmental analysts can use.

The same is true for ship activity. A vessel count is a blunt indicator of pressure. Larger ships may create different wake, noise and seabed disturbance from small craft; anchoring activity can affect habitats; and bunkering or cargo transfer creates specific spill risks. Monitoring should be linked to the actual activity pattern, including anchorage zones, turning areas and the locations of marine services.

A spatially resolved programme can distinguish a port-channel effect from an outfall plume more effectively than a single “port water” station.

04.320
Cont.
24ShipsDesalination outfalls and port waters: measuring the impact on Gulf marine life

Desalination outfalls and port waters: measuring the impact on Gulf marine life

Regulators need clear triggers, not simply annual reports. A programme should define what happens when salinity, temperature, turbidity or contaminants exceed an agreed threshold; when a sensor records an unusual event; or when biological indicators show a persistent change. Triggers might require confirmatory sampling, inspection of plant operations, a temporary reduction in discharge, an investigation of a spill or review of dredging controls.

Thresholds need scientific and regulatory basis, and they should distinguish an alert from a breach. The response process should identify who is notified, who investigates and when the public receives an update.

The published EAD report’s recommendation for at least five additional years of monitoring near Mirfa points to a key principle: short records are poor at separating trend from variability. Marine systems change with seasons and weather, and a new station needs time to establish a reliable baseline. Continuing beyond a single project cycle can reveal whether an observed condition persists, improves or worsens.

Long-term data are especially valuable when infrastructure expands, because operators can compare the post-development state with the earlier record rather than start measuring only after change has occurred.

For port and desalination operators, the practical lesson is to design environmental monitoring before the next expansion, not as a condition bolted on after construction. Establish reference sites; measure multiple depths; combine continuous sensors with laboratory sampling and biological surveys; record plant and port operations; and agree data quality rules. Make the results accessible to the regulator and, where appropriate, the public.

A credible programme should explain uncertainty rather than bury it in a composite score.

The broader Gulf context makes that discipline useful beyond Fujairah or Mirfa. Coastal communities depend on desalination, while ports and industrial facilities support trade and employment. These uses share water. The answer is not to assume that every change is caused by one sector, or that monitoring is proof of no harm. It is to build evidence that can separate sources, follow cumulative effects and support practical mitigation. The most informative sample is not necessarily the one nearest the outfall.

It is the one collected within a design capable of explaining what the water is telling us.

Contributor: Paul Thompson / 24Ships

04.321
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.322
India’s new coastal shipping rules: when can a foreign vessel carry domestic cargo?
OPERATIONS

India’s new coastal shipping rules: when can a foreign vessel carry domestic cargo?

India’s Coastal Shipping Act, 2025 gives the country a new statutory framework for coasting trade, including a licensing route for foreign vessels. The detail that operators need, however, sits in rules that were published as drafts in December 2025 and opened for comment. That distinction matters before anyone books a vessel or promises a domestic leg. This feature explains how the Act defines coasting trade, what the draft licensing framework asks an applicant to establish, where chartering and voyage scope matter, and how operators should assemble a workable compliance file while the final rules remain unsettled.

04.323
Cont.
Additional Q4 editorial graphic.
Additional Q4 editorial graphic.
04.324
Cont.
24ShipsIndia’s new coastal shipping rules: when can a foreign vessel carry domestic cargo?

India’s new coastal shipping rules: when can a foreign vessel carry domestic cargo?

24Ships feature image.
24Ships feature image.

A ship can make a short passage and still cross a long legal distance. A foreign-flag vessel loading at one Indian port and discharging at another is not simply completing a convenient leg between two calls. It is carrying out coasting trade: carriage of goods or passengers by sea from one Indian port or place to another, or a service performed within Indian coastal waters. The distinction is commercially important because India regulates that trade separately from ordinary import and export movements.

The Coastal Shipping Act, 2025 is the new statutory frame. India Code records the Act as Act 20 of 2025, enacted on 9 August 2025. Its stated purpose is to consolidate and amend the law relating to coastal shipping, promote coasting trade and encourage domestic participation. Section 4 addresses a vessel other than an Indian vessel engaging in coasting trade: it must obtain a licence from the Director-General of Shipping.

The Act also creates a national database covering applications, licences, licence conditions, routes, voyages and services. Those are the foundations. The working instructions are in the subordinate rules.

Here is the status point that should head every operator’s briefing note. The Ministry of Ports, Shipping and Waterways published draft Coastal Shipping (Licensing of Foreign Vessels) Rules, 2026 in the Gazette on 19 December 2025 and invited observations and suggestions. The Ministry’s rules page set 11 January 2026 as the closing date for comments. In February 2026, a government statement told Parliament that the rules had been published for stakeholder input.

Those records establish a consultation process; they do not establish that the draft wording became final law. A vessel fixture, tender or customer quotation should not describe a draft provision as a settled requirement without checking for a later Gazette notification.

That is a practical rather than academic caution. The Act and rules operate together. The Act establishes that a licence is required and identifies the Director-General as the licensing authority. The rules are intended to say how to apply, what information and supporting material to submit, and how licences will be handled. If a proposed form asks for details absent from a company’s usual charter pack, the company needs time to obtain them.

If the final rules change a proposed criterion, a compliance plan based only on the draft will need revision. For operators working to a narrow laycan, the uncertainty is itself a scheduling issue.

24Ships feature image.
24Ships feature image.

Start with the cargo movement, not with the vessel’s flag. Draw the voyage leg by leg and identify the status of each port or place. Is the cargo loaded in India and delivered to another Indian port? Is the vessel carrying it onward to a foreign destination? Is the ship performing a service within coastal waters rather than carrying a cargo between ports? The Act’s definition of coasting trade includes goods and passengers and services within coastal waters, while excluding fishing.

A mixed itinerary can combine domestic and international work, but the domestic leg does not cease to be domestic because the same vessel also has an export cargo or a foreign port in its rotation.

That analysis should be recorded in plain language in the fixture file. State the loading point, discharge point, cargo, charterer, intended dates and every intervening call. Identify which part of the voyage is proposed coasting trade and which is export-import trade. Do not rely on the commercial label “coastal call” or “feeder leg” in a booking system: the legal character follows the movement and service, not the marketing term. Where cargo is transhipped, divided or reloaded, make the physical sequence clear.

It is much easier to resolve an eligibility question from a complete voyage diagram than from a bill of lading presented without context.

04.325
Cont.
24ShipsIndia’s new coastal shipping rules: when can a foreign vessel carry domestic cargo?

India’s new coastal shipping rules: when can a foreign vessel carry domestic cargo?

Next, establish who is applying and in what capacity. The Act places the licence with the Director-General and allows a foreign vessel’s coasting-trade authority to be granted for a specified period or voyage, subject to prescribed conditions. The draft rules are the place to verify the precise applicant fields and evidence requirements.

In the meantime, operators should be able to identify the registered owner, disponent owner where relevant, charterer, commercial operator, local agent and person responsible for compliance. These roles are not interchangeable. A charterparty may assign the cost of a licence to one party, but it does not by itself prove that the proper application has been made or that the vessel has authority for the actual work.

The vessel file should be ready to show the particulars that make the ship identifiable and its proposed employment intelligible: name, flag, registration details, tonnage, dimensions, classification, statutory certificates, insurance evidence and the relevant charter or employment terms. This is practical preparation, not a claim that every item has been prescribed in the final Indian form. The final rule and any Directorate-General instructions must control.

The point is to avoid a scramble for documents once the application pathway is confirmed. Keep the record current and ensure names and dates agree across the charter, certificate set, port call data and cargo documents.

The commercial question is often whether a foreign ship can be used because no suitable Indian vessel is available. That may be a relevant part of the regulatory context, but do not convert it into a blanket assumption that foreign capacity is freely available whenever it is cheaper or more convenient. The purpose set out in the Act expressly includes encouraging domestic participation and ensuring that India is equipped with a coastal fleet owned and operated by citizens for national security and commercial needs.

The balance between access to capacity and the policy objective is precisely why licensing conditions matter. The applicable test, evidence and decision process need to be read from the final rules and any authoritative guidance, rather than supplied by habit or hearsay.

For a cargo owner, the operational consequence is that a vessel nomination should be conditional on regulatory readiness. Before fixing, ask the carrier to confirm whether the proposed movement constitutes coasting trade, who will make the application, what licence pathway is being used, and whether the anticipated authority covers the cargo, ports and dates in question. Put responsibility for filing and fees into the charter or service contract.

Add a requirement to provide the licence and any relevant conditions before loading. Agree what happens if the application is refused, delayed or granted on terms that prevent the planned employment. Demurrage, substitution and cancellation clauses should match the actual licensing risk.

Ship operators should make the same enquiry before promising a domestic leg. A general trading description is not enough if the licence is voyage-specific. Confirm that port substitutions, cargo changes, a revised discharge sequence or an extension of dates will not take the vessel outside the permission granted.

If the Act allows a licence to be suspended, revoked or modified, and provides for a hearing opportunity before such action, the commercial team still needs to know what events could put a permission at risk and how to report changes. A licence is an operating condition, not a document to be filed once and forgotten.

The most useful internal control is a single voyage compliance sheet with four sections: the cargo movement; the parties and their roles; the vessel particulars; and the current regulatory evidence. The first section should make the domestic leg unmistakable. The second should nominate one accountable applicant and one local point of contact. The third should list the certificates and charter documents actually available.

04.326
Cont.
24ShipsIndia’s new coastal shipping rules: when can a foreign vessel carry domestic cargo?

India’s new coastal shipping rules: when can a foreign vessel carry domestic cargo?

The fourth should record the application reference, licence period or voyage, conditions, expiry and any change that requires confirmation. Keep the underlying documents attached, not merely a tick-box saying they exist.

Agents need a parallel process. The arrival notice, cargo declaration, port call and licence particulars should align. An agent who receives a nomination late should flag discrepancies before the ship sails for the next Indian port, rather than discovering them at the point of clearance. The draft framework and later directions may determine how applications and records are handled electronically, but basic document discipline is not dependent on an online portal.

A consistently named file, a clear version date and a traceable approval email can prevent confusion between an application in progress and a licence already granted.

There is also a policy question for Indian shippers. The Act’s national database is intended to make information on applications, licences, conditions, routes and services available electronically and to be updated monthly. If it is implemented as described, it could make the availability of foreign vessel permissions more visible and help distinguish a one-off exception from repeated use on a route. That would be useful for cargo planners and domestic operators alike.

Yet a public database is only as helpful as its update cycle, data quality and clarity about what a listed permission authorises. The Act’s provision gives the architecture; the operating experience will depend on implementation.

The law also separates coasting trade licensing from a different category: certain chartered vessels engaged in voyages to or from India that are not Indian vessels. The Act has a separate chapter for licensing chartered vessels other than for coasting trade. That matters to companies which charter foreign tonnage for export-import work. Do not assume that an authorisation for an international charter automatically covers an Indian domestic leg, or that a coastal licence covers every other chartered operation.

Map each movement against the relevant chapter and seek written clarification where a rotation changes character.

A second trap is to treat a bilateral arrangement, tender condition or established industry practice as a substitute for checking the new Act. The statute supersedes the previous framework in the area it governs, while the detailed transition and commencement position should be checked against official notifications. India Code is useful for the enacted Act; the Ministry and Directorate-General sites are the places to confirm rules, forms and subsequent notices.

A circular describing an earlier procedure can remain online after the statutory basis has changed. Record the date of the source your compliance team relied on.

Stakeholder comment is a meaningful part of the present story, but it is not a proxy for industry consensus. The government’s February 2026 statement lists a broad consultation involving shipowners, operators, seafarer associations, training bodies, classification societies, ports, state maritime boards, service providers and legal experts across its maritime rule-making exercise. It confirms that the draft Coastal Shipping rules were placed for observations.

It does not disclose the substance of each submission or establish that any particular concern was accepted. Operators should be wary of claims that “the industry has agreed” unless the evidence names the body, document and outcome.

For the same reason, avoid building a tender around a rumoured exemption or a supposed fast-track route. If a customer expects a foreign ship to lift domestic cargo because the ship is already in Indian waters, check the licence position before committing. If an owner expects a broad authorisation to cover future cargoes, check whether the final rules permit that scope.

If a charterer expects the vessel’s flag-state documents to answer the licensing question, distinguish seaworthiness and statutory compliance from permission to engage in a specific national trade. These are separate gates.

The legislation’s purpose is to make coasting trade more organised and to encourage national capacity. For the operator, however, the immediate question is narrower: can this vessel, under this commercial arrangement, carry this cargo between these Indian points on these dates under a permission that is actually in force? That question is answerable if the voyage is described accurately, the applicant is clear, the application is complete and the licence conditions are checked against the real itinerary.

India’s new framework will be judged by how consistently those answers can be obtained, and by whether the eventual rules offer a process that is workable without weakening the policy behind the Act. Until the final text and implementation guidance are verified, the safest useful habit is also the simplest: treat every proposed domestic movement by a foreign vessel as a licensing exercise at the planning stage, preserve the evidence, and recheck the official record before the ship loads.

Contributor: Paul Thompson / 24Ships

04.327
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.328
Singapore’s digital bunkering records: following a bunker delivery from meter to invoice
TECHNICAL

Singapore’s digital bunkering records: following a bunker delivery from meter to invoice

A digital bunker delivery note is the visible end of a measurement chain. In Singapore, the chain begins with an approved mass flow meter, whose readings underpin the delivered quantity recorded for marine fuel oil. The e-document can improve traceability, but it does not remove the chief engineer’s need to witness the transfer, check the figures and preserve a clear record when something does not match. Following the transaction from meter seals and delivery readings to the final note shows where digitalisation changes the work, where it simply makes old controls easier to audit, and how to prepare for a quantity dispute.

04.329
Cont.
24ShipsSingapore’s digital bunkering records: following a bunker delivery from meter to invoice

Singapore’s digital bunkering records: following a bunker delivery from meter to invoice

24Ships feature image.
24Ships feature image.

The invoice arrives after the hoses have been disconnected. The argument, if there is one, began much earlier: when the meter was zeroed, when the first reading was taken, when the seal was checked and when the ship’s representative decided that the delivery record described what had actually happened. A digital bunker delivery note can make that chain easier to follow. It cannot repair a weak chain.

Singapore’s system rests on a control that predates the current wave of digital paperwork. The Maritime and Port Authority of Singapore (MPA) made the use of an approved mass flow meter system mandatory for marine fuel oil bunker delivery in the port from 1 January 2017. MPA says the delivered quantity stated in the Bunker Delivery Note is to be based on the bunker tanker’s MFM system, witnessed by the receiving vessel’s cargo officer, the chief engineer and a bunker surveyor if engaged.

The wording matters: the meter produces the quantity basis, while people on both sides observe the operation and record it.

The later digital layer is intended to preserve and transmit the delivery record. MPA’s digital bunkering crew guide describes a post-delivery set of records that includes the mass flow meter seals checklist, bunker delivery note, bunker metering ticket and mass flow meter reading record, alongside other forms where applicable.

Finalised digital documents are sent to relevant stakeholders, including MPA; the receiving vessel can receive the completed electronic BDN by email when internet is available, and a printed copy can be obtained from the bunker barge if it is not. That fallback is an operational detail worth remembering in a port where an electronic workflow still has to work beside a ship’s practical constraints.

The measurement code has also moved on. MPA’s Port Marine Circular 12 of 2024 says Singapore mandated Singapore Standard SS 648:2024 for custody transfer of bunker deliveries to ocean-going ships from 1 April 2025, replacing SS 648:2019.

The revision followed a joint review involving MPA, the Singapore Shipping Association, the International Bunker Industry Association and representatives from suppliers, craft operators, buyers, surveyors, testing companies, oil majors, equipment vendors, government agencies and industry specialists. A change in the standard is not a reason to assume the physical meter has changed; it is a reason to confirm that the relevant system and procedures meet the current code.

To understand what the digital record does, follow a delivery in sequence. Before transfer, the ship and bunker craft need to agree the product, quantity, transfer arrangement and communications. The receiving ship should confirm that the intended tank capacity is available, that the transfer sequence is understood and that the relevant shipboard staff know which tanks are to receive fuel. This is not merely an administrative preamble.

24Ships feature image.
24Ships feature image.

A mistaken tank line-up or unclear rate limit can create a safety issue before it creates a quantity dispute.

The bunker craft’s meter then becomes the custody-transfer instrument. MFM measures mass flow through the delivery system rather than relying on a tank sounding calculation as the primary quantity method. The meter’s readings and system status are therefore central evidence. The receiving representative should understand what readings the process expects at the start and at completion, and should confirm that the meter total has been recorded consistently.

The meter ticket and the BDN should not become two documents that happen to contain similar numbers; one should be traceable to the other.

Seal control is a telling part of the process because it joins equipment integrity to documentary accountability. MPA’s crew guide identifies a mass flow meter seals checklist among the post-delivery documents. The ship’s team should be able to see which seals are checked, who records the check, and whether any discrepancy is raised before finalisation.

04.330
Cont.
24ShipsSingapore’s digital bunkering records: following a bunker delivery from meter to invoice

Singapore’s digital bunkering records: following a bunker delivery from meter to invoice

A missing or damaged seal does not automatically tell the whole story of a delivery, but it is a reason to stop treating the paperwork as routine and ask for an explanation while the parties and evidence are still available.

The receiving chief engineer’s role is not to watch a screen from the bridge. The chief engineer or delegated cargo officer should maintain a view of the transfer, keep communications open and make sure the ship’s record of the operation is complete. The ship may compare the supplier’s delivery record with its own tank soundings and consumption accounting, but those shipboard checks have different purposes. A sounding can help identify an unexpected condition or support a reconciliation.

It does not displace the MPA-required MFM basis for the BDN quantity in Singapore’s MFO deliveries.

A surveyor, when engaged, adds another observer and a separate record. The surveyor’s presence can help the buyer preserve contemporaneous evidence, but it is not a substitute for the ship’s own witness. Agree before the operation what the surveyor will inspect, what readings will be recorded, and how exceptions will be noted. If a dispute later reaches claims handlers or arbitrators, a report that explains the observation method is more useful than a bare conclusion that the quantity was right or wrong.

At completion, the operational record becomes a document set. The final meter reading, meter ticket, seal checklist, delivery details and BDN should be checked for matching vessel and barge identities, product designation, date and time, delivery quantity and signatures or acknowledgements. The receiving vessel should keep the digital file in a location available to the chief engineer, purchasing department and claims team, not merely in a personal inbox.

It should retain any paper record issued during connectivity failure and reconcile it with the final electronic documents when they arrive.

Digital delivery improves the ability to identify versions and route a record to several parties. It can reduce the familiar delay in receiving a final signed copy and reduce errors caused by re-keying figures from paper. It can also make it easier to assemble evidence quickly when an owner’s auditor or charterer asks for a delivery record. These gains depend on disciplined naming, access and retention. A file named “final.pdf” saved in an unshared mailbox is digital in format but poor in control.

The invoice is the commercial end of the trail, not an independent measurement. Finance teams should reconcile its quantity and unit price against the final BDN and meter ticket, then compare product and delivery date with the purchase order and agreed terms. If the invoice includes adjustments, the calculation should be visible.

If the BDN is still marked provisional or a dispute is recorded, payment workflows should preserve that status rather than convert it into an apparently accepted quantity through a routine approval click.

What happens when the numbers do not agree? First preserve the evidence. The ship should retain the digital BDN, meter ticket, seals checklist, readings, surveyor’s record if any, relevant tank soundings, transfer log, communications and a clear timeline. Make a note of the discrepancy while the operation is fresh, stating the figures and measurement points that differ. Avoid replacing an earlier document without retaining the original version and the reason for amendment.

The supplier should receive a prompt, specific notice through the agreed claims channel.

The MPA’s mass-flow-meter FAQ addresses the possibility of a quantity dispute and refers to a note of protest by the bunker tanker under existing procedures. That is one reason not to treat a shortfall allegation as an informal conversation that can be settled weeks later. Each party should follow the governing contract and port procedures, and record its position promptly. A protest is not proof of a claim; it is a way to preserve the fact that a party disagreed at the time.

04.331
Cont.
24ShipsSingapore’s digital bunkering records: following a bunker delivery from meter to invoice

Singapore’s digital bunkering records: following a bunker delivery from meter to invoice

The engineer should avoid an easy but misleading comparison: “the ship’s tank figure is lower, therefore the meter under-delivered.” Tank measurement may be affected by temperature, trim, heel, settling time, line content and the method used to calculate usable volume. The meter measures mass; onboard soundings commonly provide a volume estimate that must be related to density and temperature if the comparison is to be meaningful.

These data can assist investigation, but they should not be flattened into a direct comparison of unlike quantities.

The same care applies to temperature and density recorded on delivery documents. Check that the product description and units agree across the purchase order, BDN and invoice. Ensure the ship’s fuel-management system records any relevant laboratory sample and analysis separately from the quantity trail. Quality and quantity disputes can overlap, but a correct mass transfer does not establish that the fuel meets the agreed specification; an off-spec sample does not by itself establish a short quantity.

For the master and chief engineer, preparation is a short pre-arrival routine. Confirm who is authorised to witness the delivery and sign or acknowledge records; check the planned tank line-up and safe capacity; make sure the ship’s clocks and event log are usable; establish how the e-document will reach the vessel; and agree what to do if the connection fails. Ask the barge representative to explain any proposed change to the delivery sequence or paperwork.

If an unexpected event occurs, record it as it happens rather than trying to reconstruct it after the barge has left.

For the supplier, a digital transaction depends on the quality of the data entered and the integrity of the meter system. Staff need training on starting and ending readings, seal checks, identity fields, delivery interruptions and document finalisation. The system should make an amended record distinguishable from the initial record, with the reason and responsible user visible. Electronic signatures and time stamps add value when parties can establish who used them and what they accepted.

If the process is designed only to make the screen look complete, it will not make the evidence stronger.

Auditors should test the lineage rather than simply sample the finished BDN. Select a delivery and trace the invoice to the BDN, the BDN to the meter ticket, and that ticket to the underlying readings and seal checklist. Confirm that the receiving ship’s name and product agree throughout, that exceptions were not erased during finalisation and that supporting records remain accessible. Check the system’s handling of low connectivity and amended documents.

A successful email transmission is not the same as an auditable record.

The digital system also affects how quickly a discrepancy can be escalated. When the vessel, supplier and MPA have access to a consistent completed record, the basic facts can be assembled without waiting for a paper copy to be couriered or manually typed. That can narrow the time spent arguing about what the paperwork says. It does not decide what a disputed meter reading means, whether a system complied with the standard, or how a contract allocates the loss. Those remain matters of evidence and terms.

Singapore’s advantage is not that a tablet eliminates disputes. It is that the jurisdiction has made measurement control and documentation part of the same operating framework. MFM requirements establish the basis for quantity; SS 648 sets the current custody-transfer code; the digital record helps move and preserve the transaction evidence. The people on the ship and barge still have to observe the process, use the system correctly and speak up when a reading, seal or document does not make sense.

The useful question after the barge sails is not simply whether an e-BDN has arrived. It is whether the ship can reconstruct the delivery from the first reading to the invoice, with every material number attached to a source and every exception kept visible. If it can, digital bunkering has done more than replace paper. It has made a commercial handover easier to explain and harder to misunderstand.

Contributor: Paul Thompson / 24Ships

04.332
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.333
At the pilot ladder: how Singapore boards ships in heavy traffic
INSIDER

At the pilot ladder: how Singapore boards ships in heavy traffic

The pilot’s transfer from launch to ship is a brief operation with little room for improvisation. Singapore’s port guidance sets out the reporting and pilotage framework, while international rules define the transfer arrangement the vessel must rig. MPA safety material has also highlighted defects found during inspections at anchorages. No boarding can be reconstructed as a first-hand report without access to pilots and masters, but the published requirements tell operators where the real decisions sit: preparation, communication, launch approach, ladder condition and the willingness to stop when the arrangement or conditions are unsafe.

04.334
Cont.
24ShipsAt the pilot ladder: how Singapore boards ships in heavy traffic

At the pilot ladder: how Singapore boards ships in heavy traffic

24Ships feature image.
24Ships feature image.

The critical moment in a pilotage job can arrive before the pilot reaches the bridge. A launch is alongside; the pilot is ready to transfer; the vessel is making way or holding position as directed; and the ladder that has been inspected from deck level must now bear a person moving between two platforms in a changing sea. The operation may last minutes. Its margin for error has been built over hours of preparation.

At Singapore, pilot boarding is part of a tightly managed port movement. The Maritime and Port Authority’s arrival guidance requires vessels to report their position and provide an estimated time of arrival at the first destination or the name of the pilot boarding ground when engaging a pilot. Vessels approaching from different directions make reports to the relevant VTIS operator as they enter the operational area.

The port’s pilotage guidelines assist users in arranging pilot services and tugs, with the stated objective of safe berthing, unberthing and movement in fairways and anchorages.

That paperwork and radio work are not a sideshow to the transfer. The pilot launch and ship need a shared understanding of where the meeting will occur, what movement the ship will make, which side the ladder is rigged on, and whether the ship can present that side safely. Traffic information matters because a vessel cannot treat its pilot boarding point as an isolated patch of water. The ship is approaching or departing amid other movements, traffic lanes and port instructions.

The correct transfer plan must fit the navigation plan.

The available public sources do not support a narrated account of a particular Singapore boarding, nor do they establish interviews with local pilots or masters. What they do show is a useful operating picture: defined reporting points, formal pilotage guidance and specific safety attention to transfer arrangements. That is enough to examine the job without inventing the words or decisions of people who have not been interviewed.

The first check belongs on board before the launch is close. SOLAS regulation V/23 governs pilot transfer arrangements. The IMO’s requirements and related guidance address the design, construction, rigging, installation, operational readiness, inspection, maintenance and approval of the ladder arrangements. In 2024, the IMO reported the development of revised requirements.

Its current pilotage information says the Maritime Safety Committee adopted SOLAS amendments and performance standards in 2025, with entry into force expected on 1 January 2028 and phased implementation. For a 2026 operation, crews must apply the requirements then in force while preparing for the future standard; they should not confuse an adopted amendment’s future date with a requirement already effective.

24Ships feature image.
24Ships feature image.

The ladder must be the right equipment, in serviceable condition and rigged correctly for the ship’s freeboard and the boarding method. If a combination arrangement is needed, the accommodation ladder and pilot ladder have to form a safe, properly aligned transfer. The means of securing the ladder matters as much as its appearance. A ladder that looks sound from the deck can still be improperly secured or poorly positioned.

The responsible officer should examine its condition, attachment and access, confirm the arrangement is unobstructed and ensure that communication with the bridge is direct.

MPA’s safety alert on transfers between vessels at anchorages gives this advice a local edge. It says recent inspections at Singapore anchorage found instances of non-compliance, including defective ladders or improper securing, incorrectly rigged combination arrangements, and inadequate lighting and safety measures. The alert calls for verification of compliance, routine inspection before use, crew training, prompt repair or replacement of defective equipment and reporting of deficiencies or near misses.

These are not abstract possibilities: they are the categories the authority chose to highlight after inspections.

04.335
Cont.
24ShipsAt the pilot ladder: how Singapore boards ships in heavy traffic

At the pilot ladder: how Singapore boards ships in heavy traffic

A launch crew cannot compensate for a poor ladder. Nor should the pilot be expected to decide whether an arrangement that fails a basic check can be made acceptable by timing the transfer more skilfully. The master and responsible officer control the shipboard preparation. They need to know who is supervising the rigging, who has checked it and who is maintaining the bridge link during boarding.

The pilot’s safety depends on the ship presenting a suitable arrangement; the pilot launch’s position and handling then have to make the transfer possible within it.

The bridge should treat the boarding as a planned manoeuvre. The master and pilot exchange information and agree how the ship will manoeuvre, consistent with the port’s instructions and the circumstances. The bridge team should know the expected boarding time and side, keep a proper lookout, monitor traffic and maintain communications with the launch and port control as required. The transfer should not be allowed to pull attention away from the navigation task.

It is a high-consequence operation nested inside a busy passage, not a pause in that passage.

Weather and sea state are not reduced to a single number. Wind can set the launch off the ship’s side; swell can produce relative vertical movement; current can affect the launch’s approach and the ship’s ability to hold the intended track. Visibility, rain, darkness and spray affect what both teams can see. The people in charge have to evaluate the actual movement and the transfer arrangement together.

A ladder can be compliant in construction and still be unsafe to use in a particular combination of freeboard, vessel motion and weather.

This is where the decision to delay or abort has its value. A late pilot boarding can disrupt the schedule and berth window, but a transfer that is not safe cannot be repaired by commercial urgency. If the launch cannot maintain a controlled position, if the ship cannot provide the agreed side, if the ladder is defective, if communications fail or if the conditions exceed what the teams can safely manage, the transfer should stop and be reassessed.

The decision must be communicated clearly so that the vessel, pilot launch, port control and agent are working from the same plan.

A useful abort is an orderly one. The ship keeps its navigational responsibilities in view; the launch moves clear in a controlled manner; the bridge informs the relevant traffic service and pilotage provider; and a new boarding plan is agreed. The record should capture why the operation did not proceed and what changed before a second attempt. The objective is not to create a paper defence but to prevent the same unsafe condition from recurring under pressure.

The launch approach requires its own judgement. The pilot boat must come alongside in a position that lets the pilot reach the ladder without being caught between hulls or exposed to an avoidable impact. Its crew must account for the ship’s way, wake, wind and the movement of nearby traffic. The ship’s speed and heading, where manoeuvring instructions permit, should support a stable lee and a workable transfer.

A launch’s capability and local knowledge are important, but its operator still needs the ship to follow the agreed approach and avoid abrupt changes.

The person transferring needs a clear route and a safe landing point at the top. SOLAS and IMO materials set detailed expectations for pilot ladders and transfer arrangements, including handholds and safe access. The deck team should keep the area clear, provide adequate lighting, have the required safety equipment ready and avoid creating an obstacle course of ropes, covers or temporary fittings.

A pilot carrying equipment should not need to negotiate an improvised barrier at the exact point where balance is most exposed.

04.336
Cont.
24ShipsAt the pilot ladder: how Singapore boards ships in heavy traffic

At the pilot ladder: how Singapore boards ships in heavy traffic

At the rail, direct communication matters. The officer supervising the arrangement should be in contact with the bridge and able to report its status. A hand signal may help, but it should not be the only link where radio communication is available and appropriate. The bridge should know when the launch is alongside, when the pilot begins the transfer, when the pilot is on deck and when the ladder can be recovered.

The same sequence applies on disembarkation, a stage that MPA’s alert and earlier safety material treat as a point of risk in its own right.

The disembarking pilot can face the same combination of vessel motion, ladder condition and launch movement, with the added possibility that attention on the ship is already shifting to the next manoeuvre. The bridge and deck team should keep the transfer controlled until the pilot is safely in the launch. A ladder should not be recovered or repositioned while someone is still using it, and the launch should not be assumed clear simply because the pilot’s upper body has passed the ship’s rail.

Clear verbal confirmation closes the operation.

The recorded near-miss material from MPA’s safety publications reinforces the point. Its bulletin describes two separate near-miss incidents in Singapore waters in which pilots were injured when pilot ladders parted during disembarkation. The lesson is not that Singapore boarding is uniquely hazardous; it is that a familiar arrangement can fail at the transition point. Inspection before use, proper securing and a crew member who remains alert through disembarkation all have a concrete purpose.

For ship managers, the transfer should be treated as a maintenance and competence issue as well as a port-call task. Keep ladders and associated fittings in the ship’s inspection routine; replace suspect equipment; retain evidence of type approval where required; and train staff in the ship-specific arrangement. Familiarisation should cover where the gear is stowed, how the ladder is secured, what freeboard range requires a combination arrangement, how the area is lit and who has authority to stop the operation.

A crew member should not be meeting an unfamiliar ladder arrangement for the first time during a night boarding.

Masters can make the agent’s pre-arrival information useful by asking practical questions: which boarding ground applies to the approach, what the vessel’s reporting sequence is, what the pilotage provider expects for the vessel’s dimensions and draft, and whether there are special instructions for the berth or movement. MPA’s published arrival process specifically includes reporting the pilot boarding ground or first destination.

Accurate ETA and position information give the port a better basis for coordinating the call. A late or ambiguous report can complicate an already tight sequence.

Agents and operators should ensure that the vessel’s particulars in the arrival notification are current, particularly where a change in draft, height or movement affects planning. Confirm the service has been ordered and that the correct pilotage guidance is being followed. Share the actual ship’s limitations early. A plan built around a standard arrival can fail when a vessel has a damaged ladder, unusual freeboard, restricted manoeuvrability or an altered ETA.

Early disclosure gives the pilotage and port teams options; a surprise at the boarding ground does not.

The regulatory horizon is changing too. IMO’s adopted 2025 amendments to SOLAS V/23 and performance standards are expected to enter into force on 1 January 2028, with phased implementation. The standards address design and manufacture as well as rigging, approval, inspection, maintenance and familiarisation. Shipowners with newbuilds, refits or ladder replacement programmes should review those requirements with their flag administration and class well before the effective date.

04.337
Cont.
24ShipsAt the pilot ladder: how Singapore boards ships in heavy traffic

At the pilot ladder: how Singapore boards ships in heavy traffic

The safest procurement question is not merely whether the ladder meets today’s certificate requirements, but whether the arrangement will remain compliant through its expected service life.

For 2026, though, an operator should avoid two mistakes: treating the future standard as if it has already replaced every current requirement, or ignoring it because its commencement date lies ahead. Verify the applicable SOLAS text and flag guidance for the specific ship. Then compare the actual rigging arrangement against both the in-force requirements and the adopted future direction. That exercise can reveal a poor access layout or a maintenance gap before it becomes a port-state issue or a transfer hazard.

A pilot ladder is a small piece of equipment carrying a disproportionate responsibility. Its safe use depends on the ship’s design, the crew’s preparation, the bridge’s navigation, the launch’s handling, port coordination and the judgement of the people at the transfer point. Singapore’s own published material shows that authorities pay attention to the practical failures: bad securing, poor lighting, defective ladders and unsafe combination arrangements.

Its arrival and pilotage guidance also shows how the boarding fits into a wider traffic-management system.

The strongest operating habit is to make the transfer decision reversible. Prepare early, inspect the arrangement, agree the approach, keep communication open and allow any participant to call a stop when the conditions do not fit the plan. If the pilot steps aboard, it should be because the ship and launch have presented a safe transfer together. If they cannot, the next useful move is to clear away and try again when they can.

Contributor: Paul Thompson / 24Ships

04.338
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.339
Papua New Guinea’s island supply ships and the cargo they carry on deck
24 UNUSUAL

Papua New Guinea’s island supply ships and the cargo they carry on deck

In a country where road links do not connect many population centres, coastal shipping is part of the basic transport network. The vessels serving smaller ports have to work with shallow approaches, short or limited berths, mixed cargo and a return leg that may not offer the same load as the outward voyage. Public evidence cannot substitute for time aboard a particular island supply ship, so this feature does not pretend to have observed one. It uses PNG Ports Corporation port data and the competition regulator’s coastal-shipping inquiry to explain how a call is planned, what safe deck cargo demands and why the last mile often determines the service.

04.340
Cont.
24ShipsPapua New Guinea’s island supply ships and the cargo they carry on deck

Papua New Guinea’s island supply ships and the cargo they carry on deck

24Ships feature image.
24Ships feature image.

A deck load is not a picturesque arrangement of boxes against a blue horizon. It is a stability calculation, a lashing plan, a cargo sequence and a promise that the vessel can still reach the next landing place safely. In Papua New Guinea, where many urban centres lack road connections, coastal shipping does work that elsewhere might be divided among road, rail and feeder services. The practical problem is not simply how to carry goods across water.

It is how to deliver a mixed load through a chain of ports whose physical limits vary sharply.

The Independent Consumer and Competition Commission’s 2024 inquiry divides the coastal-shipping market into provincial liner services, passenger services, bulk freight, charter services and district services. That classification is useful because “island supply ship” can describe quite different operations.

A provincial liner has a repeat route and scheduled calls; a charter may be built around one cargo; a passenger service brings a different safety and revenue mix; and a district service may reach places where the port infrastructure is very limited. The report notes that the lack of road infrastructure connecting most urban centres makes coastal shipping important for producers moving goods to customers.

A ship’s route often begins at a larger port where cargo can be consolidated. Pallets, bagged goods, construction materials, fuel, machinery, foodstuffs and empty packaging may all compete for space, though the mix varies by vessel and service. Each item has different requirements. A container can protect cargo and simplify handling but needs suitable lifting gear and deck securing points. Loose or packaged freight needs a plan to prevent movement, crushing, water damage and obstructed access.

Heavy items demand attention to deck strength and stowage position. Dangerous goods bring segregation and documentation requirements. The commercial attraction of carrying an extra item cannot override the ship’s approved loading limits.

This story cannot claim a ride on a named vessel or describe a particular loading operation as witnessed. Public records give a more responsible route into the subject: PNG Ports Corporation publishes port particulars, while the ICCC has examined the service structure and market conditions. Those sources make it possible to look at what operators must plan for without inventing an onboard scene or an interview.

24Ships feature image.
24Ships feature image.

Port particulars illustrate why a route sheet needs more than a list of place names. PNG Ports Corporation’s entry for Lorengau describes the port on Manus Island, at the edge of Seeadler Harbour in the Admiralty Islands, and publishes berth information including length and depth. It also cautions that heavier loads may require checking. That single operational note says a lot.

A call can be technically possible while cargo weight, draft, tide, berth availability and handling arrangements determine whether the planned vessel and load are appropriate.

A master or operator planning such a route should build a port-by-port capability sheet. Record the published berth length and depth, approach constraints, available cargo-handling equipment, working hours, local contact arrangements and any limits on heavy cargo. Confirm the current details with the port before loading; a published page is a starting point, not a hydrographic survey or live notice of berth condition.

The vessel’s draft on arrival can differ from the nominal figure once fuel, water, stores and cargo have been taken into account. A route feasible at one load condition may not be feasible after a late addition.

04.341
Cont.
24ShipsPapua New Guinea’s island supply ships and the cargo they carry on deck

Papua New Guinea’s island supply ships and the cargo they carry on deck

Deck cargo makes that connection visible. Cargo carried above the main deck changes the ship’s vertical centre of gravity, windage and exposure to green water. The exact effect depends on the vessel’s stability booklet, loading condition and cargo geometry. The responsible officer must use approved stability information and loading tools, account for free-surface effects and confirm that the vessel remains within its operating limits throughout the voyage.

A visually neat stack can still be wrong if it is too high, too far outboard, too heavy in one area or arranged so that water cannot drain.

Lashing is the other half of the calculation. The ship’s cargo securing manual and applicable cargo rules govern how units are restrained. Lashings need sound securing points and an arrangement suited to the cargo’s weight, shape and expected acceleration. Inadequate lashings may allow a load to shift when the vessel rolls or pitches, with consequences for stability, structural integrity and access. The crew should be able to inspect and retension where safe, especially after a rough passage or a change in route.

Cargo that blocks fire equipment, escape routes, ventilation, visibility or access to machinery is an operational hazard even if it is secure.

A mixed load creates sequencing questions before departure. If a vessel must discharge cargo at several ports, the stow plan should make each parcel accessible in turn. Putting a later port’s freight on top of an earlier port’s cargo may save space at the load port and cost hours, extra handling and damage risk at the discharge point. Port equipment matters: a unit that can be lifted by a mobile crane at a main port may have to be handled differently at a smaller call.

The operator should confirm the lifting capacity and gear available before promising that a particular item can be discharged.

The quay-to-community link may be the least standard part of the journey. PNG Ports Corporation manages more than 15 ports, distributed across the country’s coastal regions. That does not mean every island settlement has a deep-water berth or container terminal. Some cargo may need onward transfer from a port, while other locations may have a modest landing and limited handling equipment. The ship’s schedule must allow for practical differences between a large port call and a small one.

A vessel that arrives on time but cannot discharge safely has not completed the service.

Weather shapes the sequence. Rain can affect cargo protection and deck work; wind and swell can make transfer to a small landing difficult; a forecast may force a master to adjust speed, order of calls or time at anchor. The operator’s public schedule is a commercial commitment, but the master retains responsibility for the safe operation of the vessel.

A customer should understand that a port rotation is a plan subject to weather, berth availability and vessel condition, not a guarantee that every parcel will be landed at a fixed hour regardless of conditions.

The return voyage deserves equal attention. The ICCC inquiry describes a market with distinct service segments and discusses the economics of coastal shipping. A ship carrying substantial cargo one way may have fewer paying loads on the return. Empty backhaul capacity raises unit costs; it may also influence which goods can be accepted, how often a route is run and whether a service remains viable. That is a structural challenge, not simply an inefficiency at the level of one captain or one port.

Cargo owners can help by providing accurate weights, dimensions, packaging details, destination and handling needs early. “Two pallets” is not a usable booking description if the pallet weight, height and contents are unknown. Declared weights must reflect the actual cargo, not a rough estimate made before the final packing. Make special handling requirements explicit, including whether cargo can be exposed to rain, whether it can be lifted from above, and whether it must remain upright.

04.342
Cont.
24ShipsPapua New Guinea’s island supply ships and the cargo they carry on deck

Papua New Guinea’s island supply ships and the cargo they carry on deck

Misdescription pushes risk into the ship’s loading plan and can disrupt the next call.

Operators should also resist the temptation to accept late cargo without recalculating the whole load. A few additional units can alter draft, trim, stability, deck loading and the discharge sequence. If the port at the end of the route has a depth or handling constraint, the late addition may affect a call several days later. The master and cargo officer need authority to reject or defer a parcel when the vessel’s limits or cargo plan do not permit it.

A booking desk cannot safely treat deck capacity as a simple count of vacant rectangles.

At the port, good documentation is practical protection. The manifest should match the goods physically loaded and show each parcel’s destination. Dangerous goods must be declared and handled under the applicable rules. Bills of lading and delivery records should make the chain of custody clear. If cargo is transferred between vessels, trucks or smaller craft, record who took custody and where. This is especially important where a larger ship cannot berth at the final community and a transfer is required.

The documents help resolve loss and damage; they also support safety planning.

The ICCC report’s market analysis is relevant to the service’s future. It found no immediate competition concern warranting intervention but recommended price monitoring, and observed that government assistance could increase consumer benefits while requiring care not to disrupt competition. Its wider point is that transport networks serving dispersed communities may need support to remain sustainable and deliver economic benefit.

A service may be commercially marginal while socially important, particularly where alternatives are costly or absent.

That policy discussion should not obscure the operator’s daily arithmetic. Vessel age and fuel costs matter; so do port time, crew availability, maintenance and the balance of cargo between legs. More frequent service needs enough volume to cover its cost. Larger ships may lower the unit cost on a trunk route but cannot necessarily enter every smaller harbour or use every berth. Smaller ships can access shallower places but may have less capacity and higher costs per unit.

A good network can require both types, connected by transfers or cargo consolidation.

For a shipper, the most useful booking questions are direct: what is the vessel’s cargo limit for this route; is deck stowage proposed; which ports can handle the item; what is the cargo cut-off; what happens if weather delays the call; and how will delivery be acknowledged? For a port authority, the useful questions concern published limits, maintenance, cargo-handling equipment and how users receive updates.

For a carrier, the hard question is whether the schedule allows enough time to load safely and discharge without turning every late arrival into a cascading delay.

A small port’s listed berth dimensions do not tell the whole story. Available shore labour, crane reach, landing conditions, local tides, security, road access and storage space can matter as much as the water depth. The port information should therefore be paired with a local operating confirmation. If the vessel requires a crane or forklift, confirm its availability and working load.

If cargo must be transferred ashore by another craft, establish who provides it, who controls the operation and whether the weather window is acceptable. These are ordinary pre-arrival questions, but in a thinly equipped port they can decide whether a call works at all.

04.343
Cont.
24ShipsPapua New Guinea’s island supply ships and the cargo they carry on deck

Papua New Guinea’s island supply ships and the cargo they carry on deck

Safety also extends to people moving with the cargo. If passengers are carried, the vessel’s passenger capacity and approved arrangements are separate from freight space. Passengers cannot simply be fitted into an open deck area because cargo volume is low. The ICCC’s separation of passenger and freight service categories underscores that these are related but distinct operations.

Operators should be explicit about whether a service is cargo-only or carries passengers, and ensure booking practices reflect the vessel’s approvals and applicable safety requirements.

A ship’s deck is a tempting place to add flexibility. It is also where a weak operating system becomes visible. If the cargo is correctly described, the stability condition calculated, the lashings inspected, the route checked against current port information and the discharge sequence planned, deck carriage can be a practical answer to the limits of the vessel and the port. If any one of those steps is skipped, the ship may arrive with a load that cannot be safely handled or legally carried as planned.

The importance of coastal shipping in Papua New Guinea is not a slogan. It follows from geography and the limits of the land transport network. But that importance does not make every proposed route or cargo combination viable. The service depends on matching vessel to berth, cargo to deck, schedule to weather, and commercial revenue to the empty space that may remain on the return leg.

The best way to understand an island supply ship is therefore to look beyond the cargo visible above the rail. Beneath it is a set of decisions about stability, access, port capability and service economics. Those decisions determine whether a box, bag or machine reaches its destination safely, and whether the vessel can return to do the job again.

Contributor: Paul Thompson / 24Ships

04.344
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.345
Japan’s carbon-neutral port plans: which projects have moved beyond the map?
SUSTAINABILITY

Japan’s carbon-neutral port plans: which projects have moved beyond the map?

Japan’s Carbon Neutral Port programme is now a planning framework with published plans, national working groups and port-specific proposals. That is progress, but a plan is not the same as an operating shore connection, fuel terminal or converted cargo machine. The clearest way to judge delivery is to follow projects through their stages: policy target, funded design, construction, commissioning and routine use. Using MLIT’s programme material and Kobe’s published port plan as a test case, this feature separates installed capability from intended investment and asks what operators should verify before treating a decarbonisation project as available infrastructure.

04.346
Cont.
24ShipsJapan’s carbon-neutral port plans: which projects have moved beyond the map?

Japan’s carbon-neutral port plans: which projects have moved beyond the map?

24Ships feature image.
24Ships feature image.

A coloured port map can make a future look finished. Berths are shaded, hydrogen routes are drawn, and arrows connect renewable power to cargo equipment and ships. The harder question begins after the map: which cable has been laid, which machine is running, which fuel can be bought in useful quantity, and which vessel can actually connect?

Japan’s Carbon Neutral Port programme is designed to turn port-area decarbonisation into coordinated planning. The Ministry of Land, Infrastructure, Transport and Tourism (MLIT) has established working groups and published material on current measures, port decarbonisation plans and examples of good practice. Its public record includes a ninth CNP study meeting in March 2026, with material on the surrounding policy environment and measures proposed to realise plans.

The meetings and documents show an active national process. They do not, by themselves, establish that every project listed by an individual port is built or operational.

That distinction is the right starting point for an audit. A plan contains commitments and pathways; an operating asset has passed through procurement, construction, testing and handover. A shore connection needs more than a drawing: the ship must have compatible electrical equipment, the port must provide the connection at the berth, and the interface, safety procedures and commercial arrangements must work. Hydrogen or ammonia infrastructure needs supply, storage, handling, safety approvals and customers.

Cargo equipment described as fuel-cell-ready is not a converted machine.

Kobe is a useful case because the city’s published mid-term plan gives a clear list of intended measures. The plan says the port will pursue carbon neutrality by 2050 through public-private partnerships, drawing on Kobe’s Carbon Neutral Port development plan. It identifies shore power supply to vessels at anchor, fuel-cell cargo-handling equipment and tractor heads, and incentives for ships with lower environmental impact. This is a meaningful programme statement.

It is not evidence in that document that a particular ship has connected to shore power or that a particular fleet of cargo equipment has already been converted.

The difference is not a criticism of planning. Ports need a coordinated vision before they can align grid capacity, terminal investment, fuel supply and users. A plan can also mobilise public funding and establish a sequence of work. But the word “will” should remain a future-tense word until the project has reached service. For ship operators and cargo owners, the practical task is to identify the exact status of each measure before building an emissions estimate or a port-call procedure around it.

24Ships feature image.
24Ships feature image.

A useful audit follows five stages: proposal, approved funding and design, construction, commissioning, and routine service. Documents often state the proposal. Budget records or procurement notices may show the project has moved into implementation. Construction announcements establish that equipment or infrastructure is being installed. Commissioning records show that the system has been tested.

Evidence of routine service—connection data, operating hours, throughput, fuel sales or equipment deployment—shows whether it is available to users. Treating those stages as interchangeable is how a target is mistaken for a deliverable.

Take shore power. To move beyond the map, ask which berth is equipped, what voltage and frequency are offered, which vessel classes can connect, how much power is available, and how users book it. Ask when the connection is expected to be available, whether it has been commissioned, and what charges apply. The ship needs compatible shore-side equipment and a safe procedure for making and breaking the connection.

The port needs sufficient grid capacity and a method to supply power without shifting emissions to an unaccounted source. The benefit at berth depends on actual use and the electricity mix.

04.347
Cont.
24ShipsJapan’s carbon-neutral port plans: which projects have moved beyond the map?

Japan’s carbon-neutral port plans: which projects have moved beyond the map?

Kobe’s plan refers to supply for vessels at anchor. That phrase deserves a technical follow-up. A vessel at anchor is not automatically alongside a shore connection; power might require a dedicated installation or a transfer system appropriate to the anchorage. An operator should clarify the actual delivery arrangement, the vessels it serves, and whether the proposed supply is already available. Without those details, the ambition is real but the commercial use case remains undefined.

Grid capacity can be the constraint hidden behind apparently simple equipment. A container terminal with multiple high-demand machines, refrigerated cargo and shore connections may require a substantial connection upgrade. The port, utility and terminal operator need to plan peak load, redundancy, cable routes, transformers and the timing of ship calls. Even a completed berth connection may face limitations when several users need power at once.

The question is not just whether a socket exists; it is whether the system can supply the promised load when the ship is there.

Then there is the ship-side interface. Operators should establish whether their vessel can accept the port’s connection, whether cable handling and storage are fitted, whether crew have been trained, and how the connection affects emergency power and operational readiness. The connection plan needs to state who supplies the equipment, who supervises energisation, how the risk assessment is shared and what happens if a fault occurs.

A shore-power claim is strongest when the vessel and terminal have completed a real connection trial, not when both have separately announced compatible equipment.

The same stage-by-stage test applies to hydrogen and ammonia. Japan’s national port policy material describes the goal of developing ports as hubs for next-generation energy, and national government documents discuss fuel supply systems, waterfront use and future transport networks. Those statements indicate direction and potential demand. They do not mean that a vessel can purchase bunkers at a given port today.

An operator needs to know whether the facility is a demonstration, a pilot, under construction or in commercial service; what grade and quantity can be supplied; how delivery is performed; and what safety and certification conditions apply.

Fuel infrastructure is unusually dependent on a complete chain. Production or import must be available, storage must match expected demand, and a port must be able to move the fuel safely to the ship or equipment. The bunker craft, transfer arms, pipelines, emergency response arrangements and trained workforce may all be required. A port that expects ammonia demand from future ships may sensibly prepare a plan well before those ships arrive.

That is strategic foresight, but it should not be reported as bunkering capability until the infrastructure and operating permissions are in place.

Cargo equipment provides a more immediate way to test progress. Kobe’s plan speaks of promoting fuel-cell cargo-handling equipment and tractor heads. The audit should look for a named terminal, equipment type, order or procurement, delivery, commissioning, and operational use. A demonstration machine can prove a technical point without constituting fleet conversion. Count what is working, state the duty cycle and identify the energy source.

A fuel-cell vehicle supplied with hydrogen generated from fossil fuel has a different emissions profile from one supplied by low-carbon hydrogen; a project description should make that boundary clear.

04.348
Cont.
24ShipsJapan’s carbon-neutral port plans: which projects have moved beyond the map?

Japan’s carbon-neutral port plans: which projects have moved beyond the map?

Port plans may also include solar power, energy storage, efficient lighting, cargo-flow optimisation and improved buildings. These projects can deliver reductions within the port’s own operations and may be less dependent on future marine fuels. They are still measurable. Ask for installed capacity, actual generation or energy savings, the area covered and the baseline year. A target to reduce emissions is not a measured reduction. An asset’s presence is not proof of its utilisation.

A dashboard that counts planned projects should be distinguished from one that reports energy and emissions performance.

Japan’s policy framework has been developing over several years. MLIT’s CNP working-group archive provides agendas and materials from successive meetings, including a March 2025 session that discussed recent measures, the status of port decarbonisation promotion plans and examples of good practice, followed by the March 2026 session on the environment and methods for implementing plans. The public record makes it possible to track how policy is being refined.

For an operator, the relevant evidence is still port-specific: a national discussion does not establish that a berth in Kobe, Yokohama or another harbour has the same equipment or timetable.

Kobe’s mid-term plan also refers to low-impact ship incentives. The operational questions are what qualifies, who verifies the vessel’s performance, how the incentive is calculated and when it applies. Is the measure a rebate on port dues, a discount at a particular terminal or an aspirational policy direction? Does it reward a verified emissions performance or a specified technology? What documents must a ship submit, and can a foreign operator use the scheme?

A commercial team needs published terms and a functioning application process before it can incorporate an incentive into a voyage estimate.

Ports should publish project status in a way that distinguishes a plan from a service. Useful updates include the berth or terminal, project owner, delivery stage, expected completion date, technical specification, access conditions and commissioning status. Once operational, report use: connections completed, energy supplied, equipment hours, throughput and constraints. Such information helps operators decide whether to fit compatible ship systems and gives cargo owners a basis for judging emissions claims.

It also lets investors see where one project depends on another.

For shipowners, the practical approach is a port-call verification sheet. Before contracting, confirm the precise infrastructure location, compatibility, availability window, booking method, tariff, power or fuel source and responsible operator. Ask for evidence of commissioning. If the claim affects the vessel’s emissions report, record the supplied quantity and the method used to calculate avoided emissions. If a planned connection is unavailable, establish the fallback arrangement and account for it honestly.

A port’s public plan is a reason to ask a better question, not a substitute for the answer.

Cargo owners can ask parallel questions. Which terminal will handle the cargo? Does the low-carbon equipment serve that terminal or another part of the port? Is the claimed reduction calculated for the cargo movement, the port’s own operations or the whole supply chain? Is it based on a measured baseline or an expected future state? Such precision guards against the common mistake of attaching a port-wide sustainability claim to a shipment that never used the relevant asset.

A mature audit should also recognise what a plan achieves. Coordinating port authorities, utilities, terminal operators, energy suppliers, local government and shipowners is difficult. The port controls only part of the emissions it seeks to reduce. Ships may be ordered by distant owners, terminals may be privately operated, and the grid may be managed by a utility with its own investment timetable. A public plan can establish a shared direction and reveal dependencies that otherwise stay hidden.

04.349
Cont.
24ShipsJapan’s carbon-neutral port plans: which projects have moved beyond the map?

Japan’s carbon-neutral port plans: which projects have moved beyond the map?

It can give a project a route from idea to funded work.

The question for the reader is how far that route has been travelled. At Kobe, published plans identify shore power, fuel-cell cargo equipment and incentives as measures under the carbon-neutral programme. MLIT’s national material shows continuing work on the CNP framework and plan implementation. Those are concrete policy and planning milestones. The cited documents do not establish that all the named systems are already in regular commercial use.

For each asset, the next step is to find project-level evidence from the port, city, terminal or utility.

This approach avoids both easy scepticism and easy celebration. A proposal is not worthless because it is not installed; future infrastructure has to be planned before ships and cargo equipment arrive. But a proposed connection cannot be counted as a connection used, and a future fuel hub cannot support a present-day voyage. The language should match the stage. Planned, funded, under construction, commissioned and in service describe different things.

Japan’s Carbon Neutral Port plans will become operationally meaningful when the port user can make a decision against them: fit a vessel, book a berth, purchase a fuel, use a converted machine or report an actual emissions reduction. Until then, the map is a valuable piece of direction and a poor substitute for a working interface. The next useful progress report is the one that names the berth, the equipment, the operating date and the evidence of use.

Contributor: Paul Thompson / 24Ships

04.350
Cont.
24ShipsReader's Voice

Ask Paul Thompson a question

Be the first reader to react to this article.

Reader reaction
04.351
24ShipsClassifieds

Classifieds

Test marina services

Test marina services

1UK / Global

A second test advert so the classified page can be checked with the standard four advert layout.

+44 0000 000000 / info@1uk.com / 24boatbuilders.gold@24group.uk

Test tender advert

Test tender advert

1UK / Mediterranean

A compact test advert for yacht tenders, water toys and marina-side services.

+44 0000 000000 / info@1uk.com / 24boatbuilders.gold@24group.uk

Paul Monday

Paul Monday

paul / Mediterranean

sadfsafdsadvere ergew wergew rg

+44 0000 000000 / info@1uk.com / https://1uk.com

test 1

test 1

1uk / Global

Test classified advert for the forthcoming issue layout. Includes image, company details and contact information.

+44 0000 000000 / info@1uk.com / https://1uk.com

04.352
24Synergy Southampton brochure - page 1 of 23
04.353
Cont.
24Synergy Southampton brochure - page 2 of 23
04.354
Cont.
24Synergy Southampton brochure - page 3 of 23
04.355
Cont.
24Synergy Southampton brochure - page 4 of 23
04.356
Cont.
24Synergy Southampton brochure - page 5 of 23
04.357
Cont.
24Synergy Southampton brochure - page 6 of 23
04.358
Cont.
24Synergy Southampton brochure - page 7 of 23
04.359
Cont.
24Synergy Southampton brochure - page 8 of 23
04.360
Cont.
24Synergy Southampton brochure - page 9 of 23
04.361
Cont.
24Synergy Southampton brochure - page 10 of 23
04.362
Cont.
24Synergy Southampton brochure - page 11 of 23
04.363
Cont.
24Synergy Southampton brochure - page 12 of 23
04.364
Cont.
24Synergy Southampton brochure - page 13 of 23
04.365
Cont.
24Synergy Southampton brochure - page 14 of 23
04.366
Cont.
24Synergy Southampton brochure - page 15 of 23
04.367
Cont.
24Synergy Southampton brochure - page 16 of 23
04.368
Cont.
24Synergy Southampton brochure - page 17 of 23
04.369
Cont.
24Synergy Southampton brochure - page 18 of 23
04.370
Cont.
24Synergy Southampton brochure - page 19 of 23
04.371
Cont.
24Synergy Southampton brochure - page 20 of 23
04.372
Cont.
24Synergy Southampton brochure - page 21 of 23
04.373
Cont.
24Synergy Southampton brochure - page 22 of 23
04.374
Cont.
24Synergy Southampton brochure - page 23 of 23